Loading...
HomeMy WebLinkAboutR-4214449855860-0035 os -ss— —ss — ss_ C 91 as as as — 71+OO TALBOT RD S (TAL-2I-LINE) 855860-0040 72+00 0 302305-9040 60% SUBMITTAL „y p No REVGIOv BY APPE -ATE WIRING SCHEDULE CONDUIT WIRE # SPAN OR CONDUIT SIZE EXISTING CONDUCTORS STREET LIGHTING PEDESTRIAN LIGHTING GROUND NOTES 2" PVC 21Cp10 146 1 2" PVC STUBOUT V FROM EDGE OF CONCRETE FOUNDATION, CAP FOR FUTURE USE 2" PVC 246 146 2 2"PVC SPARE 302305-9044 NOTES 1. SEE SHEET iL1.N1 FOR STREET LIGHTING GENERAL NOTES. 2. SEE STATION ELECTRICAL DRAWINGS FOR ADDITIONAL CONDUIT, AND WIRING DETAILS AT BUS STATION. 3. SEE SHEET 11-2.03 FOR WIRING SCHEMATICS. 4. SEE SHEET 112.05TO112.07 FOR POLE SCHEDULES. CONSTRUCTION NOTES iO INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER CITY OF RENTON STANDARD PLAN 117.1. I I I I % O2 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN JAO.10-04. I I I I I m O REPLACE EXISTING LUMINAIRE ON THE EXISTING POLE. I I I I I I I I 12 SERVICE CABINET. SEE 1 L2.08 FOR SERVICE PANEL DETAILS. I I I855860-0125 I 855860-0130 I I I 855860-0135 I `�' I I I II I I I I I I � I I 00 4ROW fn 0 g 73+0 74+00 75+00 76+00 N I 44 3 M = N I DO EX' ROW 302305-9109 I I I I I I I N I I I I I I I I �7 L 0' 20' 40' SCALE: 1"=20' DESicNED. APPRDNED: DATE: .Jacobs METRO TRANSIT CAPITAL DIVISION X. CHEN P. ENG RAPIDRIDE I LINE NOVEMBER 2021 �F of °Hi cow wutx+: � q g W. DING King County CHECKED: PRWECTND: RENTON SEGMENT DRINO. p METRO X. ZHANG E00588E18 LIGHTING PLAN 1L1.14 CHECKEDCONTRACTING TAL-21 71+00 TO TAL-21 76+00 snEETxD: OF METRO PROJECT ENGINEER C)JODNORX 449 XXXX T-4214149 R-4214449