HomeMy WebLinkAboutR-4214470n
0
z
a
5
EJI
E4
0
a
Uj
u
z
u
8
0
29 R
0
9
izm
3Wyy
S3k ax=
p
LOCATION MAP
r-
OHP
— pp ppT pT
- p p P P
- P
SS SS
SS SS
G G G
G
o G
T — ram
STATION 59949 (OB)
TIER 1
T
G G G�
N �
N 9
G G G
A
PSE SERVICE POLE
412-3TC, 248, #8G
_-_ ___ ___ __
PER PSE
-� SEE LIGHTING PLAN
2-#8,#8G iL1.15
#12-3TC 244 PSE SECONDARY
JUNCTION BOX
ELECTRICAL WIRING SCHEMATIC
METRO RAPIDRIDE
SHELTER
---------/
_ �Imll
Emr7 rM 2-
EXISTING PSE
1S\ERVICE POLE
'
7
T T
SF--
55
Ss-
MEN
G G G
1 PSE SECONDARY
METRO TECH PYLON 1 JUNCTION BOX
1 G c G G 4 1 G G G G G
TALBOT RD S
WIRING SCHEDULE
RUN NO.
AX
CONDUITSIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULL TAPE
REMARKS
1
T RGS METRO SERVICE
244
2" RGS METRO ELEC.
#12-3TC
248
#8G
2
2" RGS METRO ELEC.
1
SPARE
3
3/4' RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH "SHELTER
LIGHTS"
4
1"RGS METRO ELEC.
248
#8G
LABEL CONDUCTORS WITH'TECH
PYLON'
5
1.5' PVC METRO ITS
1
SPARE
6
2" PVC METRO ITS
1
SPARE
7
PER PSE
PER PSE
60% SUBMITTAL TP Jacobs
V�' o4'vggpi C$
2F92
g
��concord
Nc. REVISION BY APP'N DATE �fWVAL�
ENGINEERING
OB STATION
PANEL:#
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT: AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
84
1
1120
SHELTER LIGHTS
20
2
1120
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
1 180
1 7
1
1120
CONNECTED LOAD = (84+20+180) = 284 VA = 2,367 AMPS AVERAGE
CONTINUOUS LOAD = ((84+20)'1.25+180) = 310 VA = 2.583 AMPS AVERAGE
L1 King County
METRO
GENERALNOTES
1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL
PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A
SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT,
3. SEE 1S1.19 FOR STATION PLANS AND AMENITIES DETAILS.
CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J40.1D-04. LABEL JUNCTION BOX "METRO".
LEGEND
Q
METRO ELECTRICAL SERVICE PEDESTAL
F
Q
JUNCTION BOX TYPE 2
-----
BURIED I CONCEALED CONDUIT
METRO BUS SHELTER
A
METRO TECHNOLOGY PYLON
0' 10, 20'
SCALE: 1' =10'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE 1 LINE
RENTON SEGMENT
ELECTRICAL SITE PLAN
ID# 59949
NOVEMBER 2021
1E1.03
SHEET NO OF
470 Xxxx
T-4214170
R-4214470