Loading...
HomeMy WebLinkAboutR-4214470n 0 z a 5 EJI E4 0 a Uj u z u 8 0 29 R 0 9 izm 3Wyy S3k ax= p LOCATION MAP r- OHP — pp ppT pT - p p P P - P SS SS SS SS G G G G o G T — ram STATION 59949 (OB) TIER 1 T G G G� N � N 9 G G G A PSE SERVICE POLE 412-3TC, 248, #8G _-_ ___ ___ __ PER PSE -� SEE LIGHTING PLAN 2-#8,#8G iL1.15 #12-3TC 244 PSE SECONDARY JUNCTION BOX ELECTRICAL WIRING SCHEMATIC METRO RAPIDRIDE SHELTER ---------/ _ �Imll Emr7 rM 2- EXISTING PSE 1S\ERVICE POLE ' 7 T T SF-- 55 Ss- MEN G G G 1 PSE SECONDARY METRO TECH PYLON 1 JUNCTION BOX 1 G c G G 4 1 G G G G G TALBOT RD S WIRING SCHEDULE RUN NO. AX CONDUITSIZE SHELTER LIGHTS TECH PYLON GROUND SERVICE PULL TAPE REMARKS 1 T RGS METRO SERVICE 244 2" RGS METRO ELEC. #12-3TC 248 #8G 2 2" RGS METRO ELEC. 1 SPARE 3 3/4' RGS METRO ELEC. #12-3TC LABEL CONDUCTORS WITH "SHELTER LIGHTS" 4 1"RGS METRO ELEC. 248 #8G LABEL CONDUCTORS WITH'TECH PYLON' 5 1.5' PVC METRO ITS 1 SPARE 6 2" PVC METRO ITS 1 SPARE 7 PER PSE PER PSE 60% SUBMITTAL TP Jacobs V�' o4'vggpi C$ 2F92 g ��concord Nc. REVISION BY APP'N DATE �fWVAL� ENGINEERING OB STATION PANEL:# VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE BUS RATING: 100 AMPS MAIN BREAKER: 60 AMPS FEED: BOTTOM FAULT CURRENT: AMPS INTERRUPTING CAPACITY: 22,000 AMPS CIRCUIT DESCRIPTION VA CKT BRKR TECH PYLON 84 1 1120 SHELTER LIGHTS 20 2 1120 SPACE 3 SPACE 4 SPACE 5 SPACE 6 GFCI 1 180 1 7 1 1120 CONNECTED LOAD = (84+20+180) = 284 VA = 2,367 AMPS AVERAGE CONTINUOUS LOAD = ((84+20)'1.25+180) = 310 VA = 2.583 AMPS AVERAGE L1 King County METRO GENERALNOTES 1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT, 3. SEE 1S1.19 FOR STATION PLANS AND AMENITIES DETAILS. CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J40.1D-04. LABEL JUNCTION BOX "METRO". LEGEND Q METRO ELECTRICAL SERVICE PEDESTAL F Q JUNCTION BOX TYPE 2 ----- BURIED I CONCEALED CONDUIT METRO BUS SHELTER A METRO TECHNOLOGY PYLON 0' 10, 20' SCALE: 1' =10' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE 1 LINE RENTON SEGMENT ELECTRICAL SITE PLAN ID# 59949 NOVEMBER 2021 1E1.03 SHEET NO OF 470 Xxxx T-4214170 R-4214470