Loading...
HomeMy WebLinkAboutT-4214670 I~ Ul 0 0 D 72 EVP C EVP D -ww_� AEI I&A g ,x, \ \\ \aa LN N/ 1 II 114 II I 60% SUBMITTAL No. I R7,ISMA 61 u U 30+00 TALBOT RD S (TAL-B-LINE) 31 I 25+27 G G�i � $ I G G c -e'G I o lMI W WSW + W_ } I W 82 z i Q P P CD P 10 7 N 4B 8< 1 1, II �I III�� BY I WPD I DATE r G .jacobs T �O \oS NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. cY- — • • — • • — 2. FOR SIGNAL POLE DETAILS SEE ITS1.06D. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.06C AND 1TS1.06E. 4. FOR CONSTRUCTION NOTES SEE 1TS1.06B. _ 5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX. t 6. FOR ITS PLANS AND DETAILS SEE XXXXX. 0 7. NEW VEHICLE SIGNAL HEADS 11, 21, 22, 51, 52, 61, 62 AND 91 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON NEW MAST ARMS PER WSDOT STANDARD PLAN P J-75.20. 8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28, 49, 68 AND 89 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "C" ON NEW PS POLE PER WSDOT STD. PLAN J-75.10-02. p 9. LOOP DETECTORS V91 AND V92 SHALL CALL QUEUE JUMP PHASE 9. PROGRAM THE CONTROLLER SO THAT BOTH LOOPS MUST BE OCCUPIED AT THE SAME TIME TO CALL QUEUE JUMP PHASE 9. a 0 a G i a vy� S G G e P 7 DESiENED. ,�F WEr,F J.DAMS DRAWN J. DANS cxScxeD: T 90�RFCTi1� M.WEGENER `isYpNAy ECG CHECKED METRO PROJECT ENGINEER PRE-EMPTION SCHEDULE CHANNEL PHASES A 2&5 B 1&6 C 4&7 D 3&8 SIGNAL HEADS EXISTING m 12'O 12®�12' Y 12' 29,48,69,88 12" O 12" 41, 42, 81, 82 31, 32, 71 !- NEW R 12' R ,2" 12 O 12' YO ,z t2' FLASHING O 12' � 28, 49, 68, 89 G 12" G 12" ® 17, 21,22,61,62 11,51.52 SINpL 91 09 mr E00566E18 CDNn Nc CXxxxxxxx King County METRO SIGNS PHASE DIAGRAM 5 2 II �W 6 T I 9 NB QJ 3 � 7 4 * -O� 8 t-OL > 10 NB QJ 1 PROTECTED VEHICLE MOVEMENT �-•f—� PEDESTRIAN MOVEMENT QJ=QUEUE JUMP APS PUSH BUTTON MESSAGES PHASE AUDIBLE MESSAGE "WAIT"'WAIT TO CROSS TALBOT AT 2 GRADY' "WAIT" "WAIT TO CROSS GRADY AT 4 TALBOT" 6 "WAIT" "WAIT TO CROSS TALBOT AT GRADY" "WAIT"'WAIT TO CROSS GRADY AT 8 TALBOT" �LBOT RD9 S1 D3-103(RELOCATED) SIGNALBUS S2 SPECIAL (XX" W x XX" H) S3 R3.1 (36" W x 36" H) BLANK -OUT 0' 1020' SCALE METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN S GRADY WAY & TALBOT RD S NOVEMBER 2021 1 TS 1.06A SHUTND DE 367 XXXX T-421467 R-4214367