HomeMy WebLinkAboutT-4214670 I~
Ul
0
0
D 72
EVP C
EVP D
-ww_� AEI
I&A
g
,x,
\ \\ \aa LN N/ 1 II 114 II I
60% SUBMITTAL
No. I R7,ISMA
61
u
U
30+00 TALBOT RD S
(TAL-B-LINE) 31
I
25+27
G G�i
� $ I G G c -e'G
I o
lMI W WSW +
W_
} I W
82
z
i
Q P P CD P 10
7 N 4B
8<
1
1, II
�I
III��
BY I WPD I DATE
r
G
.jacobs
T
�O
\oS NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
cY- — • • — • • — 2. FOR SIGNAL POLE DETAILS SEE ITS1.06D.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.06C AND 1TS1.06E.
4. FOR CONSTRUCTION NOTES SEE 1TS1.06B.
_ 5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX.
t 6. FOR ITS PLANS AND DETAILS SEE XXXXX.
0 7. NEW VEHICLE SIGNAL HEADS 11, 21, 22, 51, 52, 61, 62 AND 91 SHALL BE INSTALLED
WITH NEW MOUNTING TYPE "M" ON NEW MAST ARMS PER WSDOT STANDARD PLAN
P J-75.20.
8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28, 49, 68 AND 89 SHALL BE INSTALLED
WITH NEW MOUNTING TYPE "C" ON NEW PS POLE PER WSDOT STD. PLAN J-75.10-02.
p 9. LOOP DETECTORS V91 AND V92 SHALL CALL QUEUE JUMP PHASE 9. PROGRAM THE
CONTROLLER SO THAT BOTH LOOPS MUST BE OCCUPIED AT THE SAME TIME TO CALL
QUEUE JUMP PHASE 9.
a
0
a
G i
a
vy�
S
G G
e
P
7
DESiENED.
,�F WEr,F
J.DAMS
DRAWN
J. DANS
cxScxeD:
T
90�RFCTi1�
M.WEGENER
`isYpNAy ECG
CHECKED
METRO PROJECT ENGINEER
PRE-EMPTION SCHEDULE
CHANNEL
PHASES
A
2&5
B
1&6
C
4&7
D
3&8
SIGNAL HEADS
EXISTING
m
12'O 12®�12' Y 12'
29,48,69,88
12" O 12"
41, 42, 81, 82 31, 32, 71
!- NEW
R 12' R ,2" 12 O 12'
YO ,z t2' FLASHING O 12'
� 28, 49, 68, 89
G 12" G 12" ® 17,
21,22,61,62 11,51.52 SINpL
91
09 mr
E00566E18
CDNn Nc
CXxxxxxxx
King County
METRO
SIGNS
PHASE DIAGRAM
5
2 II
�W
6 T
I
9
NB QJ
3 �
7
4 * -O�
8
t-OL >
10
NB QJ
1 PROTECTED VEHICLE MOVEMENT
�-•f—� PEDESTRIAN MOVEMENT
QJ=QUEUE JUMP
APS PUSH BUTTON MESSAGES
PHASE
AUDIBLE MESSAGE
"WAIT"'WAIT TO CROSS TALBOT AT
2
GRADY'
"WAIT" "WAIT TO CROSS GRADY AT
4
TALBOT"
6
"WAIT" "WAIT TO CROSS TALBOT AT
GRADY"
"WAIT"'WAIT TO CROSS GRADY AT
8
TALBOT"
�LBOT RD9
S1 D3-103(RELOCATED)
SIGNALBUS
S2
SPECIAL (XX" W x XX" H)
S3
R3.1 (36" W x 36" H)
BLANK -OUT
0' 1020'
SCALE
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
SIGNAL PLAN
S GRADY WAY & TALBOT RD S
NOVEMBER 2021
1 TS 1.06A
SHUTND DE
367 XXXX
T-421467
R-4214367