HomeMy WebLinkAboutT-421462I
60% SUBMITTAL
J.DAS
MWMvaCobS J. DAMS
cxEcxeo
M.WEGE
NER
CHECKED
NoR2vGI'A BY
SIGNAL HEADS
NEW
R 12' R 12"
Y 12" Y 12"
G 12" FLASHING Y 12"
21,22,23,41 G 12"
42, 61, 62. 63
81,82 11,12,31,32
51, 52, 71, 72
SIGNS
In I S. GRADY WAY
2e, 2s, 4a, 4s EFT TURN
YIELD
Si D3-103(EXISTING) ONYELLOW G
� ONLY
68, 69, 88, 8s S. GRADY WAY
S4 S5
S2 D3-103 (112" W x 24" H) R10-101 (EXISTING) R3-8LTR (EXISTING)
SHATTUCK AVE. S.
2D3-103 (EXISTING)
NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
2. FOR SIGNAL POLE DETAILS SEE 1TS1.05D.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.05C AND 1TS1.05E.
4. FOR CONSTRUCTION NOTES SEE 1TS1.05B.
5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX.
6. FOR ITS PLANS AND DETAILS SEE XXXXX.
7. NEW VEHICLE SIGNAL HEADS 11,21,22,23,31, 41, 42,51, 61, 62,63,71, 81 AND 82
SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON NEW MAST ARMS PER
WSDOT STANDARD PLAN J-75.20.
8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28, 29, 48, 49, 68, 69, 88 AND 89 SHALL
BE INSTALLED WITH NEW MOUNTING TYPE "E" ON NEW POLE PER WSDOT STD. PLAN
J-75.10.
9. NEW VEHICLE SIGNAL HEADS 12, 32, 52 AND 72 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "D" ON NEW TYPE I POLES PER WSDOT STANDARD PLAN J-75.10.
P. ENG
King County
METRO
PxH,E6Exo
E00558E18
METRO PROJECT ENGINEER ICXX%RRRRX
PRE-EMPTION SCHEDULE
CHANNEL
PHASES
A
1&6
B
4&7
C
2&5
D
3&8
APS PUSH BUTTON MESSAGES
PHASE
AUDIBLE MESSAGE
"WAIT" "WAIT TO CROSS GRADY AT
2
SHATTUCK"
"WAIT" "WAIT TO CROSS SHATTUCK
4
AT GRADY"
"WAIT""WAIT TO CROSS GRADY AT
6
SHATTUCK"
"WAIT' "WAIT TO CROSS SHATTUCK
8
AT GRADY"
PHASE DIAGRAM
1
5 /T
J
2 —FY
6
/-
FY
3
7 I\
y
4
`F�
a
FY
PROTECTED VEHICLE MOVEMENT
----> PERMISSIVE VEHICLE MOVEMENT
-/—s PEDESTRIAN MOVEMENT
FY = FLASHING YELLOW
N
0' 10, 20'
SCALE: 1" = 20'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
SIGNAL PLAN
S GRADY WAY & SHATTUCK AVE S
NOVEMBER 2021
1 TS 1.O5A
362 XXXX
T-421462
R-4214362