Loading...
HomeMy WebLinkAboutT-421462I 60% SUBMITTAL J.DAS MWMvaCobS J. DAMS cxEcxeo M.WEGE NER CHECKED NoR2vGI'A BY SIGNAL HEADS NEW R 12' R 12" Y 12" Y 12" G 12" FLASHING Y 12" 21,22,23,41 G 12" 42, 61, 62. 63 81,82 11,12,31,32 51, 52, 71, 72 SIGNS In I S. GRADY WAY 2e, 2s, 4a, 4s EFT TURN YIELD Si D3-103(EXISTING) ONYELLOW G � ONLY 68, 69, 88, 8s S. GRADY WAY S4 S5 S2 D3-103 (112" W x 24" H) R10-101 (EXISTING) R3-8LTR (EXISTING) SHATTUCK AVE. S. 2D3-103 (EXISTING) NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.05D. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.05C AND 1TS1.05E. 4. FOR CONSTRUCTION NOTES SEE 1TS1.05B. 5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX. 6. FOR ITS PLANS AND DETAILS SEE XXXXX. 7. NEW VEHICLE SIGNAL HEADS 11,21,22,23,31, 41, 42,51, 61, 62,63,71, 81 AND 82 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON NEW MAST ARMS PER WSDOT STANDARD PLAN J-75.20. 8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28, 29, 48, 49, 68, 69, 88 AND 89 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "E" ON NEW POLE PER WSDOT STD. PLAN J-75.10. 9. NEW VEHICLE SIGNAL HEADS 12, 32, 52 AND 72 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "D" ON NEW TYPE I POLES PER WSDOT STANDARD PLAN J-75.10. P. ENG King County METRO PxH,E6Exo E00558E18 METRO PROJECT ENGINEER ICXX%RRRRX PRE-EMPTION SCHEDULE CHANNEL PHASES A 1&6 B 4&7 C 2&5 D 3&8 APS PUSH BUTTON MESSAGES PHASE AUDIBLE MESSAGE "WAIT" "WAIT TO CROSS GRADY AT 2 SHATTUCK" "WAIT" "WAIT TO CROSS SHATTUCK 4 AT GRADY" "WAIT""WAIT TO CROSS GRADY AT 6 SHATTUCK" "WAIT' "WAIT TO CROSS SHATTUCK 8 AT GRADY" PHASE DIAGRAM 1 5 /T J 2 —FY 6 /- FY 3 7 I\ y 4 `F� a FY PROTECTED VEHICLE MOVEMENT ----> PERMISSIVE VEHICLE MOVEMENT -/—s PEDESTRIAN MOVEMENT FY = FLASHING YELLOW N 0' 10, 20' SCALE: 1" = 20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN S GRADY WAY & SHATTUCK AVE S NOVEMBER 2021 1 TS 1.O5A 362 XXXX T-421462 R-4214362