Loading...
HomeMy WebLinkAboutT-4214175A r r G TO Y —W W W� G w Tn 0 60% TO BE SUBMITTED AT A LATER DATE llhlk4wz ONO3 15+00 — I — 108TH AVE SE dHO dH0 dH0 dHO GENERALNOTES 1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION. 2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND UTILITIES AND/OR TREE ROOTS ARE PRESENT. CONSTRUCTION NOTES OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN BY "F" ON THE PLANS. O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO". LEGEND 9 METRO ELECTRICAL SERVICE PEDESTAL F Q JUNCTION BOX TYPE 2 ----- BURIED I CONCEALED CONDUIT METRO BUS SHELTER A METRO TECHNOLOGY PYLON -4- 0' 10' 20' SCALE: 1' =10' 7 Y P.. .. METRO TRANSIT CAPITAL DIVISION 60% SUBMITTAL NOVEMBER2021 .Jacobs :��°.�'°c� °���EN PENG RAPIDRIDE 1 LINE 9� g A KING L9 King County q CHECIQD. PROJECT NO. RENTON SEGMENT DHAunNCND: concord %�'BT � A.MGHGRAIN E00536EI8 METRO ELECTRICAL SITE PLAN 1E1.08 N[ REVISION BY APP'0 NATE ONpL CHECKED'. CONTM TNO: ID# p 290 SHEETNO'. OF E N G IN EER ING MFTRn NRniFCT FNAINFFR tf JI LJ 475 XXXX I —&"FL I &+ I / : a R-4214475