GENERALNOTES
1. THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL
PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A
SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2. HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
UTILITIES AND/OR TREE ROOTS ARE PRESENT.
60% TO BE SUBMITTED AT A LATER DATE CONSTRUCTION NOTES
OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OBORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
OPROVIDE AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
O4 PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
01 I STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO".
0 0 DraovoaisD
3
0
_M I M M M p M n!
"ONOO
SS SS SS S S SS SS SS SS OS OS SD SD SD SD SD
0
LEGEND
15+00 _ _ 08 HAVE
(108TH-LINE) O METRO ELECTRICAL SERVICE PEDESTAL
Q JUNCTION BOX TYPE 2
--- BURIED I CONCEALED CONDUIT
METRO BUS SHELTER
A METRO TECHNOLOGY PYLON
Jacobs
V�' o4'vggpi C$
concord��
ENGINEERING
-4-
0' 10' 20'
SCALE: 1' =10'
DATE
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE 1 LINE NOVEMBER 2021
King County
RENTON SEGMENT DRAWNGNO
METRO ELECTRICAL SITE PLAN 1E1.07
ID# 57270 SEETNO OF
474 XXXX
T-4214174
R-4214474