Loading...
HomeMy WebLinkAboutT-4214145e3 0 x WIRING SCHEDULE CONDUIT WIRE SPAN OR EXISTING STREET PEDESTRIAN CONDUIT SIZE CONDUCTORS LIGHTING LIGHTING GROUND NOTES 2" PVC 2/C#10 146 1 STUBOUT V FROM EDGE OF CONCRETE 2" PVC FOUNDATION, CAP FOR FUTURE USE 2" PVC 246 146 2 2"PVC SPARE 2" PVC 446 1-46 3 2"PVC SPARE W LJ 2 (n NOTES 1. SEE SHEET 11-1.141 FOR STREET LIGHTING GENERAL NOTES. 2. SEE SIGNAL DRAWINGS FOR ADDITIONAL CONDUIT, AND WIRING AT THE INTERSECTIONS. 3. SEE SHEET 11-2.01 FOR WIRING SCHEMATICS. 4. SEE SHEET 112.05 FOR POLE SCHEDULES. CONSTRUCTION NOTES iO INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER Q CITY OF RENTON STANDARD PLAN 117.1. s O INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-00.10-04, O O REPLACE EXISTING LUMINAIRE ON EXISTING POLE. C/) DISTRIBUTION JUNCTION BOX. SEE SIGNAL DRAWINGS FOR DETAILS. 0' 20' 40' SCALE: 1"=20' ' METRO TRANSIT CAPITAL DIVISION W 60% SUBMITTAL Jacobs XCHEN PEND RAPIDRIDE I LINE NovEMBERzoz1 �c�� oRowN: q g W. DING kla King County NECKED PRWECTN°, RENTON SEGMENT DRAWING NO p METRO �.�aEq,°E�o td4` X. ZHANG E00558E18 LIGHTING PLAN 1L1.10 N°. Re ls;l BY APPD DATE ° CHECKED `°"°"`T"° TAL-B 18+50 TO TAL-B 23+50 NHEE'"°OF METRO PROJECT ENGINEER C)JOOD)0( 445 XXXX T-4214145 R-4214445