Loading...
HomeMy WebLinkAboutT-4214144e3 0 0 WIRING SCHEDULE CONDUIT WIRE SPAN OR CONDUITSIZE EXISTING CONDUCTORS STREET LIGHTING PEDESTRIAN LIGHTING GROUND NOTES 2" PVC 2I0#10 1-46 1 2" PVC STUBOUT 1' FROM EDGE OF CONCRETE FOUNDATION, CAP FOR FUTURE USE 2" PVC 246 1-#6 2 2"PVC SPARE 2" PVC 446 146 3 2"PVC SPARE 3" PVC 4-#6 146 5 3"PVC SPARE 20 I EX 1" 1 2-#6' 1 2I0#10 1-#6 'REMOVE 60% SUBMITTAL vaC�bS �.-� X. CHEN P. ENG Rof WesHH Gn� MWVMI � a King County q g CH CKE X.ZHAN' EM566EPROJECTNo:ING METRO 0 20100fi25 �4p .ass mfirfi�o ot2 X. ZHANG E00588E18 No. REv61pv BY APPD DATE logeu CHECKED CONTRACTNo. METRO PROJECT ENGINEER CXXXXXXXX O J NOTES 1. SEE SHEET iL1.N1 FOR STREET LIGHTING GENERAL NOTES. 2. SEE SIGNAL DRAWINGS FOR ADDITIONAL CONDUIT, AND WIRING AT THE INTERSECTIONS. 3. SEE SHEET 112.02 FOR WIRING SCHEMATICS. 4. SEE SHEET 112.05 FOR POLE SCHEDULES. CONSTRUCTION NOTES iO INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER CITY OF RENTON STANDARD PLAN 117.1. OINSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. 0REMOVE EXISTING STREET LIGHT POLE, FOUNDATION, BRACKET ARM, LUMINAIRE AND ASSOCIATED WIRING. OINSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD PLAN J40.30-04. OINSTALL NEW CONDUITS INTO EXISTING JUNCTION BOX. 13 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. T 0' 20' 40' SCALE: 1"=20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT LIGHTING PLAN TAL-B 14+00 TO TAL-B 18+50 NOVEMBER 2021 1 L1.09 444 XXXX T-4214144 R-4214444