HomeMy WebLinkAboutT-4214140e3
0
0
WIRING SCHEDULE
CONDUIT
WIRE
SPAN OR
EXISTING
STREET
PEDESTRIAN
CONDUITSIZE
CONDUCTORS
LIGHTING
LIGHTING
GROUND
NOTES
2" PVC
2/C#10
146
1
STUBOUT V FROM EDGE OF CONCRETE
2" PVC
FOUNDATION, CAP FOR FUTURE USE
2" PVC
246
1-46
2
2"PVC
SPARE
2" PVC
446
146
3
2"PVC
I SPARE
2
U
Q
60% SUBMITTAL vaC�bS �.-�
�V,HE X. CHEN P. ENG
Rof WASHH Gn� MWVMI �
a King County
q g ING
CH CKE
X.ZHAN' EM566EPROJECTNo: METRO
0 20100fi25 �4p
.ass mfirfi�o ot2 X. ZHANG E00588E18
No. REv612A BY APP'D -ATE Togeu CHECKED CoxmNOTINO
METRO PROJECT ENGINEER CXXXXXXXX
NOTES
1. SEE SHEET 1L1.N1 FOR STREET LIGHTING GENERAL NOTES.
2. SEE SIGNAL DRAWINGS FOR ADDITIONAL CONDUIT, AND WIRING AT THE INTERSECTIONS.
3. SEE SHEET 11-2.01 FOR WIRING SCHEMATICS.
4. SEE SHEET 11-2.05 FOR POLE SCHEDULES.
CONSTRUCTION NOTES
iO INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER
CITY OF RENTON STANDARD PLAN 117.1.
OINSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04.
OREPLACE EXISTING LUMINAIRE ON EXISTING POLE.
O4 REMOVE EXISTING STREET LIGHT POLE, FOUNDATION, BRACKET ARM, LUMINAIRE
AND ASSOCIATED WIRING.
N
0' 20' 40•
SCALE:1"=20'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
LIGHTING PLAN
GRA 10+00 TO GRA 14+00
NOVEMBER 2021
1 L1.05
1 440 X)=
T-4214140
R-4214440