WIRING SCHEDULE
RUN NO.
QCONDUITSIZE
CONDUCTORS
REMARKS
1
311PVC
1-48SMFO
2
3"PVC
2-12SMFO*
'REINSTALL
2
CO
60% SUBMITTAL Jacobs
Pp DM. RAWN RS P. ENG
V O4 WA`SHI � DRAWN
„F `"°a�LIU L9 King County
� � CHECKED RNH`"� �� METRO
A concord
^ey Ec AL tip C ECKED: E00588E18
9(ONAL @� CHECKED: LIXITMCTNJ'.
RSvlo'i0N BY APPD DATE
E N G IN EERI N G METRO PROJECT ENGINEER CX%%%%%XX
GENERALNOTES
1. SEE SIGNAL PLANS 1TS1.05 FOR ADDITIONAL WORK AT
THE INTERSECTION.
CONSTRUCTION NOTES
OREMOVE EXISTING SMALL CABLE VAULT.
O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN JAO.10-04
INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02.
. TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND
CONDUIT TO AVOID UTILITIES.
13 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER
TRUNK. PULL BACK EXISTING LATERALS INTO SIGNAL CABINET FOR
REINSTALLATION.
17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS
NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO
PRECONSTRUCTION CONDITION.
22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.11.
COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN
THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02.
r
J
L
J
Q
FA
0' 20• 4V
SCALE: 1"=20'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
INTERCONNECT PLAN
GRA 14+00 TO GRA 19+00
NOVEMBER 2021
1�1
$HE£TM OF
aos xx
T-4214106
R-4214406