Loading...
HomeMy WebLinkAboutMFP22000010.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22000010 IVR Number: 22000010 Permit Information Permit Name: 2022 Puget Sound Energy Bare Pole Removal Address/Location:01/01/2022Application Date:Parcel Number: Permit Type:02/22/2022Issue Date:Franchise Permit Work Class:02/22/2023Expiration Date:Major Utility Job Number: Blanket PermitFranchise Type:Electric Description: 2022 PERMIT TO REMOVE BARE POLES ONLY. SOME TRANSFER WORK IF NECESSARY TO REMOVE POLES. TRAFFIC CONTROL PLAN REQUIRED. WORK UNDER THIS PERMIT MUST BE CALLED IN AT JOB START (425) 430 7203. All work done under this permit will be billed at an additional rate of $60/hour for inspections. After hours work and weekend work will be charged at $125/hour (per the City of Renton Fee Schedule). Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES