Loading...
HomeMy WebLinkAboutD_Seattle_Seahawks_Covid_Testing_Site_220222_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SR_Seattle_Seahawks_Covid_Testing_Site_220222_v1 PLANNING DIVISION TIER 1 TEMPORARY USE PERMIT EVALUATION FORM & DECISION DATE OF DECISION: February 22, 2022 PROJECT NUMBER: LUA22-000050, TP PROJECT NAME: Seattle Seahawks Covid Testing Site PROJECT MANAGER: Clark H. Close, Senior Planner APPLICANT: Sean Vanos, Football Northwest 12 Seahawks Way Renton, WA 98056 OWNER: Port Quendall Company d/b/a Seattle Seahawks 12 Seahawks Way Renton, WA 98056 CONTACT: Jonathan Sonkin 301 East 66th Street New York, NY 10065 PROJECT LOCATION: 12 Seahawks Way, Renton WA 98056 (APN 2924059015) DATE OF EXPIRATION: February 22, 2023 PROJECT DESCRIPTION: On July 14, 2020, the Seattle Seahawks received approval for a Tier 1 Temporary Use Permit (TUP) for the Seattle Seahawks Covid Testing Site under LUA20-000164, TP located at 12 Seahawks Way (Exhibit 2). On January 19, 2021, the City issued a permit extension beyond the one year with a final expiration date of February 28, 2022 (Exhibit 3). Now the applicant is requesting approval to continue the use of the Seattle Seahawks Covid Testing Site at the Virginia Mason Athletic Center (VMAC) - Seahawks Headquarters (Seahawks Training Facility) by requesting approval of a new Tier 1 TUP for a Covid-19 testing site. The project site would be located to the west of the existing Seahawks Training Facility in the existing gravel parking lot (Exhibit 4). The temporary use would include a healthcare structure or mobile office healthcare trailer with supporting equipment (Exhibits 5-11). The mobile trailer dimensions are 60-foot long (including the hitch) by 12-foot wide with an eight-foot (8’) ceiling height. The mobile trailer would be supported by a foundation, fresh water tank, grey water tank, mobile generator, and a 520 gallon double-walled fuel tank to provide fuel for the generator. The supporting equipment would be placed on the sides or ends of the trailer. The trailer includes stairs and an ADA ramp at the front of the trailer that would be used by players, coaches, and employees. No ground disturbances or other major site work is proposed with the temporary use. DocuSign Envelope ID: AFDFCE60-3CA7-4D0F-A630-6008AF15F684 City of Renton Department of Community & Economic Development Temporary Use Permit Seattle Seahawks Covid Testing Site LUA22-000050, TP Permit Date: February 22, 2022 Page 2 of 2 SR_Seattle_Seahawks_Covid_Testing_Site_220222_v1 The Temporary Use Permit is hereby Approved with Conditions* and subject to the following conditions: *CONDITIONS OF APPROVAL: The site occupied by the temporary use shall be left free of debris, litter, or other evidence of the temporary use upon completion of removal of the use, or when the operation of the use ceases to exist. SIGNATURE AND DATE OF DECISION: ________________________________________ ____________________________________ Vanessa Dolbee, Planning Director Date RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation or fact. After review of the Reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. APPEALS: Appeals of permit issuance must be filed in writing on or before 5:00 p.m. on March 8, 2022. Due to the ongoing state of emergency enacted by Governor’s Proclamation 20 -05, the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. EXPIRATION: A Temporary Use Permit is valid for up to one (1) year from the effective date of the permit, unless the Community & Economic Development Administrator or designee establishes a shorter time frame or an applicant can request that a permit be valid beyond the one-year expiration, for up to five (5) years at the time of application or prior to permit expiration. EXTENSIONS: Extension requests do not require additional fees and shall be requested in writing prior to permit expiration to the Department of Community & Economic Development Administrator. DocuSign Envelope ID: AFDFCE60-3CA7-4D0F-A630-6008AF15F684 2/22/2022 | 12:46 PM PST