TECHNICAL INFORMATION REPORT
FOR
Hardy Short Plat
CITY OF RENTON, WASHINGTON
Prepared by: Christian R. Vanderhoeven, E.I.T
Approved by: Sheri H. Murata, P.E.
Date: December 10, 2021, January 14, 2022
Core No.: 21019
1/14/22
DEVELOPMENT ENGINEERING
YQI 01/26/2022
SURFACE WATER UTILITY
JFarah 01/26/2022
Core Design, Inc. HARDY SHORT PLAT i
Hardy Short Plat
Table of Contents
1. PROJECT OVERVIEW .......................................................................................................................... 1-1
Figure 1-1 Vicinity Map ..................................................................................................................... 1-1
2. CONDITIONS AND REQUIREMENTS SUMMARY ................................................................................ 2-1
2.1 Core Requirements .......................................................................................................................... 2-2
2.1.1 Core Requirement #1: Discharge at the Natural Location ...................................................... 2-2
2.1.2 Core Requirement #2: Offsite Analysis .................................................................................... 2-2
2.1.3 Core Requirement #3: Flow Control......................................................................................... 2-2
2.1.4 Core Requirement #4: Conveyance System ............................................................................. 2-2
2.1.5 Core Requirements #5: Erosion and Sediment Control ........................................................... 2-2
2.1.6 Core Requirement #6: Maintenance and Operations .............................................................. 2-2
2.1.7 Core Requirement #7: Financial Guarantees and Liability ....................................................... 2-2
2.1.8 Core Requirement #8: Water Quality ...................................................................................... 2-2
2.1.9 Core Requirement #9: On-Site BMPs ....................................................................................... 2-2
2.2 Special Requirements ...................................................................................................................... 2-2
2.2.1 Special Requirement #1: Other Adopted Area Specific Requirements .................................... 2-2
2.2.2 Special Requirement #2: Flood Hazard Area Delineation ........................................................ 2-3
2.2.3 Special Requirement #3: Flood Protection Facilities ................................................................ 2-3
2.2.4 Special Requirement #4: Source Control ................................................................................. 2-3
2.2.5 Special Requirement #5: Oil Control ........................................................................................ 2-3
2.2.6 Special Requirement #6: Aquifer Protection Area ................................................................... 2-3
3. OFFSITE ANALYSIS ............................................................................................................................. 3-1
Task 1 Study Area Definition and Maps ................................................................................................. 3-1
Task 2 Resource Review ........................................................................................................................ 3-1
Sensitive Areas Folio.......................................................................................................................... 3-1
Task 3 Field Investigation ...................................................................................................................... 3-1
Task 4 Drainage System Description and Problem Description ............................................................ 3-1
4. FLOW CONTROL AND WATER QUALITY ANALYSIS ............................................................................ 4-1
4.1 Predeveloped Site Hydrology .......................................................................................................... 4-1
Table 4-1 Predeveloped Conditions .................................................................................................. 4-1
Core Design, Inc. HARDY SHORT PLAT ii
Predeveloped Bypass/Intercepted Mitigation Trade ........................................................................ 4-1
4.2 Developed Site Hydrology ............................................................................................................... 4-1
Table 4-2 Developed Conditions ....................................................................................................... 4-2
Developed Bypass/Intercepted Mitigation Trade ............................................................................. 4-2
4.3 Flow Control System ........................................................................................................................ 4-4
4.4 BMP Feasibility ................................................................................................................................ 4-6
4.5 Water Quality Treatment Analysis and Design ................................................................................ 4-9
Table 4-3 PGIS Areas ......................................................................................................................... 4-9
5. DOWNSTREAM CONVEYANCE SYSTEM CAPACITY ANALYSIS ............................................................ 5-1
6. SPECIAL REPORTS AND STUDIES ....................................................................................................... 6-1
7. OTHER PERMITS ................................................................................................................................ 7-1
8. ESC ANALYSIS AND DESIGN ............................................................................................................... 8-1
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ............................. 9-1
9.1 Bond Quantities ............................................................................................................................... 9-1
9.2 Facility Summaries ........................................................................................................................... 9-1
9.3 Declaration of Covenant .................................................................................................................. 9-1
10. OPERATIONS AND MAINTENANCE .................................................................................................. 10-1
Appendix A ............................................................................................................................................... 10-2
Core Design, Inc. HARDY SHORT PLAT Page 1-1
1. PROJECT OVERVIEW
The proposed Hardy Short Plat project is located at 857 Field Avenue NE, Renton, WA 98059. See
Vicinity Map below.
Figure 1-1 Vicinity Map
The site is composed of a single parcel number: 1437650040 with an area of approximately 0.35 acres.
The total site area, including frontage, is approximately 0.37 acres. The site is bordered by Field Avenue
NE to the east and residential homes to the north, south, and west.
The site was previously developed with a single-story residential home. The site generally slopes at 5-
10% from east to west.
Proposed development of the property will include the demolition of all existing structures and the
construction of two single family residences, shared driveway, utilities, detention vault, and frontage
improvements.
The subject project’s drainage facilities were designed using the guidelines and requirements
established in Section 1.2.3.1 of the 2017 City of Renton Surface Water Design Manual (RSWDM). The
Flow Control Duration Standard matching forested site conditions is required for this project.
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner ___________________________
Phone _________________________________
Address _______________________________
_______________________________________
Project Engineer _________________________
Company ______________________________
Phone _________________________________
Project Name _________________________
DPER Permit # ________________________
Location Township ______________
Range ________________
Section ________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse (e.g.,Subdivision / Short Subd. / UPD)
Building (e.g.,M/F / Commercial / SFR)
Clearing and Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
ShorelineManagement
StructuralRockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review (check one):
Date (include revision dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
____________________________________
__________________
Plan Type (check one):
Date (include revision dates):
Date of Final:
Full
Modified
Simplified
____________________________________
__________________
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Experimental / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: ______________________
2016 Surface Water Design Manual 4/24/2016 1
(NA)
Tuscany Construction
206-714-6707
PO Box 6127
Bellevue, WA 98008
Sheri H. Murata
Core Design
425-885-7877
Hardy Short Plat
XXX
23 N
5 E
NW 10
857 Field Avenue NE
Renton, WA 98059
3/10/21 March 10, 2021
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: KCSWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: ____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
Part 10 SOILS
Soil Type
_________________
_________________
_________________
_________________
Slopes
_________________
_________________
_________________
_________________
Erosion Potential
_________________
_________________
_________________
_________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
2016 Surface Water Design Manual 4/24/2016 2
NA
NA
Lower Cedar River
2016 KCSWDM as amended by the city of Renton
Till 0-10%Low
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility summary sheet) Level: 1 / 2 / 3 or Exemption Number ____________
Flow Control BMPs _______________________________
Conveyance System Spill containment located at: _________________________
Erosion and Sediment Control /
Construction Stormwater Pollution Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Maintenance and Operation
Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Liability
Provided: Yes / No
Water Quality (include facility summary sheet) Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. ______________________
Landscape Management Plan: Yes / No
Special Requirements (as applicable):
Area Specific Drainage Requirements Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): ______________
Datum:
Flood Protection Facilities Describe:
2016 Surface Water Design Manual 4/24/2016 3
Majority of soils not suitable for infiltration
Onsite Basin
NA
TBD
Does not trigger any WQ Thresholds
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control
High-use Site: Yes / No
Treatment BMP: ________________________________
Maintenance Agreement: Yes / No
with whom? ____________________________________
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Protection of Flow Control BMP Facilities
(existing and proposed)
Maintain BMPs / Manage Project
MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure operation of Permanent Facilities, restore
operation of Flow Control BMP Facilities as necessary
Flag limits of SAO and open space preservation areas
Other ______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
________________
2016 Surface Water Design Manual 4/24/2016 4
Vault
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ___________________________
Cast in Place Vault
Retaining Wall
Rockery > 4’ High
Structural on Steep Slope
Other ______________________________
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate.
Signed/Date
2016 Surface Water Design Manual 4/24/2016 5
12/10/21
Core Design, Inc. HARDY SHORT PLAT Page 2-1
2. CONDITIONS AND REQUIREMENTS SUMMARY
The proposed project is classified as requiring “Directed Drainage Review” per Page 1-8 Definitions given
in the 2017 RSWDM. Therefore, all nine core requirements and six special requirements will be
addressed per Section 1.2 and 1.3 of the 2017 RSWDM.
Core Design, Inc. HARDY SHORT PLAT Page 2-2
2.1 Core Requirements
2.1.1 Core Requirement #1: Discharge at the Natural Location
The existing site drainage exits the site via sheet flow over the west site boundary and passes through
neighboring properties for 200 ft before entering the city’s conveyance system along Duvall Pl NE. The
proposed project will not discharge flow across the west site boundary but redirect flow north along the
west site boundary to combine with the same existing city conveyance system. The existing and
proposed drainage path will combine within 300 ft.
2.1.2 Core Requirement #2: Offsite Analysis
See Section 3 of this Report for the downstream drainage path.
2.1.3 Core Requirement #3: Flow Control
The proposed detention vault is designed to fall within the City’s Flow Control Duration Standard
(Forested Site Conditions). This flow control standard requires matching historical forested conditions
from 50% of the 2 -year flow up to the full 50-year flow. See Section 4 of this report for a detailed Flow
Control Analysis.
2.1.4 Core Requirement #4: Conveyance System
Conveyance Calculations will be provided in Section 5 to show that the proposed conveyance system
provides sufficient capacity for the 25-year storm as calculated by the Rational Method.
2.1.5 Core Requirements #5: Erosion and Sediment Control
Erosion and sediment control will be provided through catch basin protection, silt fencing, tree
protection fencing, and an existing asphalt driveway to be used for construction access entrance. See
Section 8 of this report for erosion and sediment control analysis and design.
2.1.6 Core Requirement #6: Maintenance and Operations
The property owner will be responsible for the maintenance and operations of the stormwater facility
located in the shared driveway. An Operations and Maintenance Manual will be provided in Section 10.
2.1.7 Core Requirement #7: Financial Guarantees and Liability
A bond quantities worksheet has been provided in Section 9.
2.1.8 Core Requirement #8: Water Quality
The project is required to provide basic water quality treatment if the new plus replaced pollution
generating impervious surface exceeds 5,000 SF. The project proposes 3,201 square feet which does not
exceed this threshold. See Section 4.5 for details.
2.1.9 Core Requirement #9: On-Site BMPs
The project site is less than 22,000 square feet; this site falls under Small Lot BMP Requirements. See
Section 4.4 of this report for discussion on how this Core Requirement is addressed.
2.2 Special Requirements
2.2.1 Special Requirement #1: Other Adopted Area Specific Requirements
Core Design, Inc. HARDY SHORT PLAT Page 2-3
There are no known additional requirements for the subject project.
2.2.2 Special Requirement #2: Flood Hazard Area Delineation
Not applicable since the project does not contain nor is adjacent to a flood hazard area.
2.2.3 Special Requirement #3: Flood Protection Facilities
Not applicable since the project does not rely on an existing flood protection facility or plans to modify
or construct a new flood protection facility.
2.2.4 Special Requirement #4: Source Control
This special requirement does not apply as the project does not require a commercial site development
permit.
2.2.5 Special Requirement #5: Oil Control
Not applicable since the project is not a high use site. The expected average daily traffic is less than 100
vehicles per 1,000 square feet of gross building area.
2.2.6 Special Requirement #6: Aquifer Protection Area
Not applicable since the project is not in an Aquifer Protection Area.
Core Design, Inc. HARDY SHORT PLAT Page 3-1
3. OFFSITE ANALYSIS
Task 1 Study Area Definition and Maps
The proposed project is located within the Lower Cedar River drainage basin.
Task 2 Resource Review
Sensitive Areas Folio
Renton GIS was reviewed for sensitive areas. The proposed project site does not fall within the
following sensitive areas: coal mines, erosion hazard, flood hazard, floodway, channel migration zone,
landslide, seismic hazard, regulated stream, wetland, or wellhead protection.
Task 3 Field Investigation
There is negligible upstream tributary area.
Downstream Drainage Path
Runoff from the site initially sheet flows across the western site boundary through the neighboring
properties until it reaches Duvall Pl NE. At this point the runoff follows the grade of the road north
where it enters an existing catch basin. The runoff is directed to the south side of NE 9th Street at which
point it continues north for approximately 110 ft before entering an existing storm pond. The pond will
detain the storm runoff and discharge at acceptable flow rates to the west at which point the ¼ mile
analysis will end. The runoff will eventually enter the Maplewood Creek and into the Cedar River. See
the following page for a downstream route exhibit.
Task 4 Drainage System Description and Problem Description
Drainage complaints were researched within a quarter mile of the project site. Parcel 1437650230 north
of the project site recorded the lone drainage complaint within this range. The complaint was described
as “Facility Seeping Water” and was closed on June 21, 1991.
4,514
376
WGS_1984_Web_Mercator_Auxiliary_Sphere
Downstream Map - Renton
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Notes
None
Legend
256 0 128 256 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
11/17/2021
City and County Labels
Addresses
Parcels
City and County Boundary
<all other values>
Renton
Network Structures
Access Riser
Inlet
Manhole
Utility Vault
Clean Out
Unknown
Control Structure
Detention Facilities
Pond
Tank
Vault
Bioswale
Wetland
Other
Surface Water Main
Culvert
Open Drains
Facility Outline
Drainage Complaints
Known Drainage Issues
Renton
King County
Streets
Points of Interest
Parks
Waterbodies
2019.sid
Red: Band_1
Green: Band_2
Blue: Band_3
Site
Seeping
water
complaint on
this parcel
Core Design, Inc. HARDY SHORT PLAT Page 4-1
4. FLOW CONTROL AND WATER QUALITY ANALYSIS
A flow control facility is proposed for the project. See section 4.1 below for details. A water quality
treatment facility is not proposed as the project does not trigger any requirements for water quality
treatment as delineated in Section 4.5 of this Report. The drainage analysis was modeled using MGS
Flood software.
4.1 Predeveloped Site Hydrology
The site was previously developed with a single-story residential home. The rest of the site was left as
landscaping and forest. The total disturbed area of the project site is approximately 0.37 acres and
includes the site as well as frontage improvements. An additional 0.04 of existing impervious road area
will be collected. This area exists between the eastern boundary of the project site and centerline of
existing road. See Figure 4-1 on the following pages for the predeveloped conditions exhibit.
As per the flow control standard designated for the site, the project area will be modeled as Till Forest in
MGS Flood. The existing road area collected in the drainage basin will be modeled as impervious in the
predeveloped condition. The predeveloped areas are shown in the table below.
Table 4-1 Predeveloped Conditions
Ground Cover Area (SF) Area (Acres)
Till Forest 16,151 0.37
Impervious 1,550 0.04
Total Basin 17,701 0.41
Predeveloped Bypass/Intercepted Mitigation
Trade
Areas Till Forest (SF) Impervious (SF) Total (SF)
Bypass Area 560 0 560
Intercepted Off-Site Area 560 0 560
Net Change 0 0 0
4.2 Developed Site Hydrology
Proposed development of the property will include the demolition of all existing structures and the
construction of two single family residences, shared driveway, utilities, a detention vault, and frontage
improvements along Field Avenue NE. The impervious area per lot was determined using the existing
zoning of the site (R-8) and the city’s municipal code. Lot The maximum impervious coverage for a
zoning of R-8 is 65% per lot. The impervious area per lot is based on max per zoning or 4,000 sf,
whichever is less.
A mitigation trade area is proposed for the developed condition. The target surface area onsite exists in
the form of frontage north of proposed catch basin #7 (shown on exhibit). This will not be linked to the
onsite vault and will be conveyed north offsite. As part of the mitigation trade, an equivalent existing
non-target area between proposed catch basin #6 and the adjacent existing catch basin south of the site
Core Design, Inc. HARDY SHORT PLAT Page 4-2
will be detained within the vault. The net effect of flow control will be equivalent to the condition as if
the mitigation trade didn’t occur. The undetained runoff being traded does not create a significant
adverse impact to downstream drainage systems.
The developed conditions are shown in the table below. See Figure 4-2 on the following page for the
developed conditions exhibit. No flow credits have been taken for the proposed flow control BMPs.
Table 4-2 Developed Conditions
Ground Cover Total Area (SF) Impervious (SF) Pervious (SF)
Lot 1 7,565 4,000 3,565
Lot 2 5,264 3,422 1,842
Tract A 2,132 1,444 688
Right of Way 1,190 681 509
Existing Roadway 1,550 1,550 0
Total (SF) 17,701 11,097 6,604
Total (Acres) 0.41 0.26 0.15
Developed Bypass/Intercepted Mitigation Trade
Areas Pervious (SF) Impervious (SF) Total (SF)
Bypass Area 280 280 560
Intercepted Off-
Site Area
0 560 560
Net Change -280 +280 0
DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796321019
12ROWTRACT ADESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796321019
Core Design, Inc. HARDY SHORT PLAT Page 4-4
4.3 Flow Control System
Using the predeveloped and developed areas above, a 44’ x 14’ vault with 6.75’ of live storage was sized.
The vault requires 4,084 CF for sufficient capacity and will be designed to provide 4,084 CF. Below are
the vault details and the flow rates. The full MGS Flood report can be found in Appendix A.
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.086E-02 2-Year 9.375E-03
5-Year 2.991E-02 5-Year 1.448E-02
10-Year 3.755E-02 10-Year 1.877E-02
25-Year 5.051E-02 25-Year 2.437E-02
50-Year 5.877E-02 50-Year 2.885E-02
100-Year 6.410E-02 100-Year 3.970E-02
200-Year 8.825E-02 200-Year 5.663E-02
500-Year 0.121 500-Year 7.909E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -34.3% PASS
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -5.2% PASS
Maximum Excursion from Q2 to Q50 (Must be less than 10%): -10.8% PASS
Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
Core Design, Inc. HARDY SHORT PLAT Page 4-5
Link Name: Vault
Link Type: Structure
Downstream Link: None
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 456.59
Riser Crest Elevation (ft) : 463.22
Max Pond Elevation (ft) : 463.72
Storage Depth (ft) : 6.63
Pond Bottom Length (ft) : 44.0
Pond Bottom Width (ft) : 14.0
Pond Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 616.
Area at Riser Crest El (sq-ft) : 616.
(acres) : 0.014
Volume at Riser Crest (cu-ft) : 4,084.
(ac-ft) : 0.094
Area at Max Elevation (sq-ft) : 616.
(acres) : 0.014
Vol at Max Elevation (cu-ft) : 4,392.
(ac-ft) : 0.101
Hydraulic Conductivity (in/hr) : 0.00
Massmann Regression Used to Estimate Hydraulic Gradient
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 12.00
Common Length (ft) : 0.000
Riser Crest Elevation : 463.22 ft
Hydraulic Structure Geometry
Number of Devices: 4
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 456.59
Diameter (in) : 0.44
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Control Elevation (ft) : 460.30
Diameter (in) : 0.44
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 461.65
Diameter (in) : 0.25
Orientation : Horizontal
Elbow : Yes
--- Device Number 4 ---
Device Type : Circular Orifice
Invert Elevation (ft) : 462.05
Length (ft) : 0.31
Orientation : Horizontal
Elbow : Yes
4.4 BMP Feasibility
Per Section 1.2.9.1 in the RSWDM, projects subject to Core Requirement #9 must apply on-site BMPs to
either supplement the flow mitigation provided by required flow control facilities or provide flow
mitigation where flow control facilities are not required. On-site BMPs must be implemented per the
requirements and approach detailed in Sections 1.2.9.2 and 1.2.9.3 for individual lots and subdivisions
or road improvement projects, respectively. The Section applicable to this project is Section 1.2.9.2.
Per Section 1.2.9.2, projects on individual sites/lots, on-site BMPs must be selected and applied
according to the individual lot BMP requirements. The project site is smaller than 22,000 square feet
and follows requirements specified in Section 1.2.9.2.1 Small Lot BMP Requirements of the 2017
RSWDM.
1. The feasibility and applicability of full dispersion as detailed in Appendix C, Section C.2.1 must be
evaluated for all target impervious surfaces. If feasible and applicable, full dispersion must be
implemented as part of the proposed project. Typically, small lot full dispersion will be applicable
only in subdivisions where enough forest was preserved by tract, easement, or covenant to meet
the minimum requirements for full dispersion in Appendix C, Section C.2.1.1
Full dispersion is not feasible due to non-existent native forested area.
2. Where full dispersion of target impervious roof areas is not feasible or applicable, or will cause
flooding or erosion impacts, the feasibility and applicability of full infiltration as detailed in Appendix
C, Section C.2.2 must be evaluated (note, this will require a soils report for the site/lot). If feasible
and applicable, full infiltration of roof runoff must be implemented as part of the proposed project.
As per the Stormwater Feasibility Evaluation by Cobalt Geosciences dated January 6, 2021, “We do not
recommend the use of infiltration systems at this site.”
3. All target impervious surfaces not mitigated by Requirements 1 and 2 above, must be mitigated to
the maximum extent feasible using one or more BMPs from the following list. Use of a given BMP is
subject to evaluation of its feasibility and applicability as detailed in Appendix C. Feasible BMPs are
required to be implemented. The BMPs listed below may be located anywhere on the site/lot
subject to the limitations and design specifications for each BMP. These BMPs must be
implemented as part of the proposed project.
• Full Infiltration per Appendix C, Section C.2.2, or per Section 5.2, whichever is applicable
As per the Stormwater Feasibility Evaluation by Cobalt Geosciences dated January 6, 2021, “We do not
recommend the use of infiltration systems at this site.”
• Limited Infiltration per Appendix C, Section C.2.3,
Per the Stormwater Feasibility Evaluation by Cobalt Geosciences dated January 6, 2021, “We do not
recommend the use of infiltration systems at this site.”
• Rain Gardens/Bioretention per Appendix C, Section C.2.6 and C.2.12 12
The Geotechnical Addendum indicates that raingardens/bioretention may be feasible, however due to
minimum 5’ setbacks to buildings and property lines, minimum side slopes of 2.5:1 a rain garden or
bioretention cell cannot be provided on either lot within the setback.
• Permeable Pavement per Appendix C, Section C.2.7
For lot 1 permeable pavement is infeasible because the proposed driveway area would be subjected to
heavy construction vehicles for construction of the house and stormwater vault. Permeable pavement
will be provided on lot 2 and will follow the recommendations per the Stormwater Feasibility Evaluation
by Cobalt Geosciences dated January 6, 2021.
4. All target impervious surfaces not mitigated by Requirements 1, 2 and 3 above, must be mitigated to
the maximum extent feasible using the Basic Dispersion BMP described below. Use of Basic
Dispersion is subject to evaluation of its feasibility and applicability as detailed in Appendix C.
Feasible BMPs are required to be implemented. Basic Dispersion BMPs may be located anywhere on
the site/lot subject to the limitations and design specifications cited in Appendix C. The BMP must
be implemented as part of the proposed project.
• Basic Dispersion per Appendix C, Section C.2.4,
Given the setbacks and flow path requirements basic dispersion is not feasible on either lot.
5. BMPs must be implemented, at minimum, for an impervious area equal to at least 10% of the
site/lot for site/lot sizes up to 11,000 square feet and at least 20% of the site/lot for site/lot sizes
between 11,000 and 22,000 square feet. For projects located in Zone 1 of the Aquifer Protection
Area, these impervious area amounts must be doubled. Doubling of the minimum impervious area
required for BMP implementation in Zone 1 of the Aquifer Protection Area is not required for
projects located within 200 feet of a steep slope hazard area, landslide hazard, or erosion hazard
area. If these minimum areas are not mitigated using feasible BMPs from Requirements 1, 2, 3, and
4 above, one or more BMPs from the following list are required to be implemented to achieve
compliance. These BMPs must be implemented as part of the proposed project.
• Reduced Impervious Surface Credit per Appendix C, Section C.2.9,
• Native Growth Retention Credit per Appendix C, Section C.2.10.
A reduced impervious area surface credit of 757 square feet will be taken on lot 1 to meet the minimum
BMP requirement. On lot 2, since permeable pavement will be provided a reduced impervious area
surface credit of 87 square feet is will be implemented. Therefore the lots will be limited to:
Lot 1: 4,000 sf – 757 sf = 3,243 sf
Lot 2: 3,422 sf – 87 sf = 3,335 sf
6. The soil moisture holding capacity of new pervious surfaces (target pervious surfaces) must be
protected in accordance with the soil amendment BMP as detailed in Appendix C, Section C.2.13.
Soil amendment will be incorporated for disturbed areas not covered with hard surfaces.
7. Any proposed connection of roof downspouts to the local drainage system must be via a perforated
pipe connection as detailed in Appendix C, Section C.2.11.
One perforated pipe connection will be provided for each lot upstream of the detention vault.
Table 4-3 BMP Summary
Lot BMP Area (sf) BMP Area (sf) BMP Area
Provided
BMP Area
Required
1 Reduced
Impervious Credit 757 - - 757 7,565(10%)
= 757
2 Permeable
Pavement 439 Reduced
Impervious Credit 87 526 5,264(10%)
= 526
4.5 Water Quality Treatment Analysis and Design
The building footprints for the lots have not yet been determined, therefore the driveway area may
vary. However, the project will assume a driveway area of 800 SF each to be conservative. A leachable
materials covenant is being submitted with the Civil Construction permit. Therefore, roof areas will not
count towards PGIS.. The subject project does not exceed 5,000 SF of PGIS, therefore basic water quality
treatment is not required. See Table 4-3 below for an area breakdown.
Table 4-4 PGIS Areas
Ground Cover Area (SF)
Shared Driveway Access 1,601
Lot Driveway 1,600
Total Area 3,201
Core Design, Inc. HARDY SHORT PLAT Page 5-1
5. DOWNSTREAM CONVEYANCE SYSTEM CAPACITY ANALYSIS
The rational method was implemented to design the conveyance system for flows upstream of the
detention vault. Per the 2017 RSWDM, new pipe systems shall be designed with sufficient capacity to
convey and contain (at minimum) the 25-year peak flow, assuming developed conditions for onsite
tributary areas and existing conditions for any offsite tributary areas. The new system was designed for
the 25-year, 24-hour, and 100-year, 24-hour storm events. A conveyance spreadsheet was generated
using the rational method to calculate flows for the area collected by each catch basin. The precipitation
rates for the 25-year, 24-hour, and 100-year, 24-hour storm events are 3.4 inches and 3.94 inches
respectively. The flows generated from the conveyance system spreadsheets for both storm events
were input to backwater analysis spreadsheets to confirm adequate sizing.
The backwater analysis was performed to ensure that during the 25-year, 24-hour storm event, the
headwater elevation in each structure did not overtop any of the rims. For the 100-year, 24-hour storm
event, structures are allowed to overtop, but all runoff must be safely conveyed to ensure that
overflowing runoff or ponding would not cause structural damage.
Weighted C values were used in the rational method spreadsheet. Impervious area has a C value of 0.9
and grass area has a C value of 0.25. These values along with the impervious area and grass area of the
developed basin were used to calculate the weighted C value. See calculations provided below.
((0.81 x 0.25) + (1.32 x 0.9))/2.13 = 0.65 = C
The tailwater elevations within the vault were derived from the MGS Flood sizing analysis. See the MGS
Flood generated reports provided in Section 4. Tailwater elevations for the 25-year storm event and the
100-year storm event for the East and West basins area provided in the table below.
Storm
Event Year
Tailwater
Elevation
25-year 464.82
100-year 465.12
During the 25-year storm all headwater elevations remained below the rim elevations of all catch basins.
During the 100-year storm all headwater elevations also remained below the rim elevations of all catch
basins for both the conveyance upstream and downstream of the vault.
See conveyance and backwater spreadsheets for the 25 and 100-year storms below. A conveyance
exhibit is provided below showing the area assumed to drain to each catch basin on the following pages.
For the conveyance system downstream of the vault the 100-year undetained 15-min flows from
MGSFlood of 0.36 cfs from Appendix A was used as the peak flow.
DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796321019
RATIONAL METHOD CONVEYANCE SYSTEM DESIGN LOCATION: KING COUNTY PR (24-HR RAINFALL):3.4 INCHES
PROJECT NAME: HARDY SHORT PLAT PROJECT NUMBER: 21019 PREPARED BY: CRV DESIGN STORM: 25 YEAR
SUBBASIN PIPE PIPE PIPE ACTUAL TRAVEL PIPE CAPACITY SUMMARY
LOCATION AREA SUM OF Tc IR QR MANNING'S SIZE SLOPE LENGTH VELOCITY (VR)TIME Q(FULL) V(FULL)QR/Q(FULL)
FROM TO (AC) "C" (A * C) (A * C) (MIN) (IN/HR) (CFS) "n" (IN) (%) (FT) (FT/SEC) (MIN) (CFS) (FT/SEC) (%)
6 5 0.060 0.65 0.039 0.039 6.30 2.73 0.107 0.012 12 5.000 100 3.35 0.50 8.631 10.99 1.2%
5 Vault 0.350 0.65 0.228 0.267 6.80 2.60 0.693 0.012 12 33.330 6 12.20 0.01 22.283 28.37 3.1%
RATIONAL METHOD CONVEYANCE SYSTEM DESIGN LOCATION: KING COUNTY PR (24-HR RAINFALL):3.94 INCHES
PROJECT NAME: HARDY SHORT PLAT PROJECT NUMBER: 21019 PREPARED BY: CRV DESIGN STORM: 100 YEAR
SUBBASIN PIPE PIPE PIPE ACTUAL TRAVEL PIPE CAPACITY SUMMARY
LOCATION AREA SUM OF Tc IR QR MANNING'S SIZE SLOPE LENGTH VELOCITY (VR)TIME Q(FULL) V(FULL)QR/Q(FULL)
FROM TO (AC) "C" (A * C) (A * C) (MIN) (IN/HR) (CFS) "n" (IN) (%) (FT) (FT/SEC) (MIN) (CFS) (FT/SEC) (%)
6 5 0.060 0.65 0.039 0.039 6.30 3.23 0.126 0.012 12 5.000 100 3.35 0.50 8.631 10.99 1.5%
5 Vault 0.350 0.65 0.228 0.267 6.80 3.07 0.819 0.012 12 33.330 6 12.20 0.01 22.283 28.37 3.7%
BACKWATER CALCULATIONS
PROJECT NAME: Hardy Short Plat PREPARED BY: CRV
PROJECT NUMBER: 21019 DESIGN STORM: 25 YEAR
ENTRANCE ENTRANCE EXIT OUTLET INLET APPROACH BEND JUNCTION
PIPE PIPE MANNING'S OUTLET INLET PIPE FULL VELOCITY TAILWATER FRICTION HGL HEAD HEAD CONTROL CONTROL VELOCITY HEAD HEAD HEADWATER RIM
FROM TO Q LENGTH SIZE "n" ELEVATION ELEVATION AREA VELOCITY HEAD ELEVATION LOSS ELEVATION LOSS LOSS ELEVATION ELEVATION HEAD LOSS LOSS ELEVATION ELEVATION FREEBOARD
CB CB (CFS) (FT) (IN) VALUE (FT) (FT) (SQ FT) (FT/SEC) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT)
Vault 5 0.69 6 12 0.012 461.00 463.00 0.79 0.88 0.01 464.82 0.00 464.82 0.01 0.01 464.84 464.00 0.00 0.00 0.00 464.84 467.92 3.08
5 6 0.11 100 12 0.012 463.00 468.00 0.79 0.14 0.00 464.84 0.00 469.00 0.00 0.00 469.00 469.00 0.00 0.00 0.00 469.00 472.00 3.00
PIPE
SEGMENT
BACKWATER CALCULATIONS
PROJECT NAME: Hardy Short Plat PREPARED BY: CRV
PROJECT NUMBER: 210119 DESIGN STORM: 100 YEAR
ENTRANCE ENTRANCE EXIT OUTLET INLET APPROACH BEND JUNCTION
PIPE PIPE MANNING'S OUTLET INLET PIPE FULL VELOCITY TAILWATER FRICTION HGL HEAD HEAD CONTROL CONTROL VELOCITY HEAD HEAD HEADWATER RIM
FROM TO Q LENGTH SIZE "n" ELEVATION ELEVATION AREA VELOCITY HEAD ELEVATION LOSS ELEVATION LOSS LOSS ELEVATION ELEVATION HEAD LOSS LOSS ELEVATION ELEVATION FREEBOARD
CB CB (CFS) (FT) (IN) VALUE (FT) (FT) (SQ FT) (FT/SEC) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT)
Vault 5 0.82 6 12 0.012 461.00 463.00 0.79 1.04 0.02 465.12 0.00 465.12 0.01 0.02 465.15 464.00 0.00 0.00 0.00 465.15 467.92 2.77
5 6 0.13 100 12 0.012 463.00 468.00 0.79 0.16 0.00 465.15 0.00 469.00 0.00 0.00 469.00 469.00 0.00 0.00 0.00 469.00 472.00 3.00
CB2 CB3 0.36 97 12 0.012 455.32 455.90 0.79 0.46 0.00 456.32 0.01 456.90 0.00 0.00 456.90 456.90 0.00 0.00 0.00 456.90 462.06 5.16
CB3 CB4 0.36 73 12 0.012 455.90 456.34 0.79 0.46 0.00 456.90 0.01 457.34 0.00 0.00 457.34 457.34 0.00 0.00 0.00 457.34 462.16 4.82
CB4
VAULT
OUT 0.36 38 12 0.012 456.34 456.59 0.79 0.46 0.00 457.34 0.00 457.59 0.00 0.00 457.59 457.59 0.00 0.00 0.00 457.59 463.72 6.13
PIPE
SEGMENT
Core Design, Inc. HARDY SHORT PLAT Page 6-1
6. SPECIAL REPORTS AND STUDIES
The following reports and assessments are provided for reference and informational purposes only.
Core Design takes no responsibility or liability for these reports, assessments or designs as they were
not completed under the direct supervision of Core Design.
Stormwater Feasibility Evaluation
January 6, 2021
Cobalt Geosciences, LLC
P.O Box 82243
Kenmore, WA 98028
206-331-1097
Geotechnical Addendum
November 22, 2021
Cobalt Geosciences, LLC
P.O Box 82243
Kenmore, WA 98028
206-331-1097
Core Design, Inc. HARDY SHORT PLAT Page 7-1
7. OTHER PERMITS
Utilities Permit
Building Permits
ROW Use Permit
Core Design, Inc. HARDY SHORT PLAT Page 8-1
8. ESC ANALYSIS AND DESIGN
ESC Plan Analysis and Design (Part A)
1. The site will utilize Appendix D of the 2017 RSWDM for the erosion and sedimentation control
design to reduce the discharge of sediment-laden runoff from the site. Clearing limits will be
established prior to any earthwork on the project site. Perimeter protection will be provided by silt
fencing along the entire perimeter of the site to limit the downstream transport of sediment to the
neighboring properties.
Dust control, if required, will be provided by a water truck. A Certified Erosion and Sediment Control
Lead inspector will be present onsite during earthwork activities. The inspector shall determine
frequency of watering of the project site and will authorize and direct any additional erosion and
sediment control measures as needed during all construction activities.
The plan will be comprised of temporary measures (stabilized construction entrance, silt fence, and
inlet protection).
2. Due to the size of the project, no sediment control facilities like a sediment trap are proposed.
3. There are no areas on site with a particularly high susceptibility to erosion. Catch basin inserts are
proposed for all proposed stormwater structures.
4. There are no erosion and sediment control recommendations in the infiltration feasibility or arborist
reports.
5. The project is proposing to use the existing asphalt driveway as a construction entrance.
SWPPS Plan Design (Part B)
The following pollution control measures shall be implemented as applicable using activity specific BMPs
detailed in Section D.2.2 (and Section D.2.1 as applicable) of Appendix D and the King County
Stormwater Pollution Prevention Manual (SPPM). The receiving water for this project is the Cedar River.
1. All pollutants, including waste materials, that occur onsite shall be handled and disposed of in a
manner that does not cause contamination of stormwater
2. Chemicals, liquid products, petroleum products, and non-inert wastes are not anticipated on site.
3. Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic system
drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and
other activities which may result in discharge or spillage of pollutants to the ground or into
stormwater runoff are not anticipated on site.
Core Design, Inc. HARDY SHORT PLAT Page 8-2
4. Application of agricultural chemicals, including fertilizers and pesticides, shall be conducted in a
manner and at application rates that will not result in loss of chemical to stormwater runoff.
Manufacturers' recommendations for application rates and procedures shall be followed.
5. Stormwater discharges shall not cause or contribute to a violation of the water quality standard for
pH in the receiving water. Measures shall be used to prevent or treat contamination of stormwater
runoff by pH modifying sources. These sources include, but are not limited to:
a. bulk cement
b. cement kiln dust, fly ash
c. new concrete washing and curing waters
d. waste streams generated from concrete grinding and sawing
e. exposed aggregate processes, and concrete pumping and mixer washout
6. For full compliance with KCC 9.12 Water Quality, the project may need to include measures for the
permanent structures and features constructed under other permits. See the Stormwater Pollution
Prevention Manual (SPPM) for Activity Sheets describing issues and measures to address them.
Common issues include:
a. Containment area planning for storage of liquid materials in stationary or portable tanks,
storage of solid waste and food wastes including cooking grease, are not anticipated for this
site.
b. Permanent canopy and paving requirements for permanent outdoor vehicle parking,
maintenance and storage areas are not anticipated for this site.
Core Design, Inc. HARDY SHORT PLAT Page 9-1
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT
9.1 Bond Quantities
A Site Improvement Bond Quantity Worksheet is provided at the end of this section.
9.2 Facility Summaries
A Facility Summary Sheet is provided at the end of this section.
9.3 Declaration of Covenant
A Declaration of Covenant for the private detention vault has been submitted with the Civil Construction
Permit. The covenant for the individual flow control BMPs on each lot will be submitted with the
building permits.
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared:
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Project Name: Project Owner:
CED Plan # (LUA):Phone:
CED Permit # (C):Address:
Site Address:
Street Intersection:Addt'l Project Owner:
Parcel #(s):Phone:
Address:
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:NO Water Service Provided by:
If Yes, Provide Forest Practice Permit #:Sewer Service Provided by:
Abbreviated Legal
Description:
SE1/4, NW1/4, SEC. 10, TWP. 23 N., RGE. 5 E., W.M.
857 Field Avenue NE
PO Box 2170,########
21-000169 206.714.6707
1/26/2022
Prepared by:
FOR APPROVALProject Phase 1
shm@coredesigninc.com
Sheri Murata
41846
Core Design Inc.
12100 NE 195th St, Suite #300, Bothell, WA 98011
425.885.7877
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
KC WATER DISTRICT 90
CITY OF RENTON
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Clearing and Grading Utility Providers
N/A
Project Location and Description Project Owner Information
Hardy Short Plat
Renton, WA 98056
1437650040
Andrew Michael Construction, LLC
Page 1 of 14
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
10.1%
Total Estimated Construction Costs E
A + B + C + D 217,050.97$
Estimated Civil Construction Permit - Construction Costs2
Stormwater (Erosion Control + Drainage)C 102,583.47$
As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance.
Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees.
Roadway (Transportation)D 64,063.72$
Water A -$
Wastewater (Sanitary Sewer)B 50,403.78$
2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is:
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Page 2 of 14
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 7.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each
Catch Basin Protection ESC-3 145.00$ Each 4 580.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY
Ditching ESC-5 10.50$ CY
Excavation-bulk ESC-6 2.30$ CY 250 575.00
Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF 464 2,320.00
Fence, Temporary (NGPE)ESC-8 1.75$ LF
Geotextile Fabric ESC-9 3.00$ SY
Hay Bale Silt Trap ESC-10 0.60$ Each
Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY
Interceptor Swale / Dike ESC-12 1.15$ LF
Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY
Level Spreader ESC-14 2.00$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY
Piping, temporary, CPP, 6"ESC-17 13.75$ LF
Piping, temporary, CPP, 8"ESC-18 16.00$ LF
Piping, temporary, CPP, 12"ESC-19 20.50$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY
TESC Supervisor ESC-30 125.00$ HR 4 500.00
Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR
Unit
Reference #Price Unit Quantity Cost
8.00$ LF 110 880.00
EROSION/SEDIMENT SUBTOTAL:4,855.00
SALES TAX @ 10.1%490.36
EROSION/SEDIMENT TOTAL:5,345.36
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
Tree Protection Fence
WRITE-IN-ITEMS
Page 3 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 7.00$ CY
Backfill & Compaction- trench GI-2 10.25$ CY
Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY
Bollards - fixed GI-4 275.00$ Each
Bollards - removable GI-5 520.00$ Each
Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre 0.34 3,901.50
Excavation - bulk GI-7 2.30$ CY 90 207.00
Excavation - Trench GI-8 5.75$ CY 200 1,150.00
Fencing, cedar, 6' high GI-9 23.00$ LF
Fencing, chain link, 4'GI-10 44.00$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each
Fill & compact - common barrow GI-13 28.75$ CY 340 9,775.00
Fill & compact - gravel base GI-14 31.00$ CY
Fill & compact - screened topsoil GI-15 44.75$ CY
Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY
Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY
Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY
Grading, fine, by hand GI-19 2.90$ SY
Grading, fine, with grader GI-20 2.30$ SY 100 230.00 1662 3,822.60
Monuments, 3' Long GI-21 1,025.00$ Each
Sensitive Areas Sign GI-22 8.00$ Each
Sodding, 1" deep, sloped ground GI-23 9.25$ SY
Surveying, line & grade GI-24 975.00$ Day 0.5 487.50 0.5 487.50
Surveying, lot location/lines GI-25 2,050.00$ Acre 0.41 840.50
Topsoil Type A (imported)GI-26 32.75$ CY 70 2,292.50
Traffic control crew ( 2 flaggers )GI-27 137.75$ HR 4 551.00
Trail, 4" chipped wood GI-28 9.15$ SY
Trail, 4" crushed cinder GI-29 10.25$ SY
Trail, 4" top course GI-30 13.75$ SY
Conduit, 2"GI-31 5.75$ LF
Wall, retaining, concrete GI-32 63.00$ SF
Wall, rockery GI-33 17.25$ SF
SUBTOTAL THIS PAGE:1,931.00 2,780.00 19,034.10
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 4 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY
AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY
AC Removal/Disposal RI-4 40.00$ SY 122 4,880.00
Barricade, Type III ( Permanent )RI-5 64.25$ LF
Guard Rail RI-6 34.50$ LF
Curb & Gutter, rolled RI-7 19.50$ LF
Curb & Gutter, vertical RI-8 14.25$ LF 85 1,211.25 87 1,239.75
Curb and Gutter, demolition and disposal RI-9 20.50$ LF 85 1,742.50
Curb, extruded asphalt RI-10 6.25$ LF
Curb, extruded concrete RI-11 8.00$ LF
Sawcut, asphalt, 3" depth RI-12 3.00$ LF 432 1,296.00
Sawcut, concrete, per 1" depth RI-13 5.00$ LF
Sealant, asphalt RI-14 2.25$ LF 432 972.00
Shoulder, gravel, 4" thick RI-15 17.25$ SY
Sidewalk, 4" thick RI-16 43.50$ SY 33 1,435.50 15 652.50
Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY
Sidewalk, 5" thick RI-18 47.00$ SY 9 423.00
Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY
Sign, Handicap RI-20 97.00$ Each
Striping, per stall RI-21 8.00$ Each
Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF
Striping, 4" reflectorized line RI-23 0.55$ LF
Additional 2.5" Crushed Surfacing RI-24 4.15$ SY
HMA 1/2" Overlay 1.5" RI-25 16.00$ SY
HMA 1/2" Overlay 2"RI-26 20.75$ SY 310 6,432.50
HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY 155 4,998.75
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY
HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY
HMA Road, 4", 4.5" ATB RI-31 43.50$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY
Thickened Edge RI-34 10.00$ LF
SUBTOTAL THIS PAGE:11,960.25 652.50 12,671.00
(B)(C)(D)(E)
Page 5 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY
2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY
4" select borrow PL-3 5.75$ SY
1.5" top course rock & 2.5" base course PL-4 16.00$ SY
SUBTOTAL PARKING LOT SURFACING:
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1 220.00$ EA 2 440.00
Median Landscaping LA-2 45.00$ SY 76 3,420.00
Right-of-Way Landscaping LA-3 45.00$ SY 48 2,160.00
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:2,600.00 3,420.00
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System ( # of Poles)TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:
(B)(C)(D)(E)
WRITE-IN-ITEMS
Driveway Approach 36.00$ LF 16 576.00
AC Pavement Patching 21.00$ SY 122 2,562.00
SUBTOTAL WRITE-IN ITEMS:3,138.00
STREET AND SITE IMPROVEMENTS SUBTOTAL:19,629.25 3,432.50 35,125.10
SALES TAX @ 10.1%1,982.55 346.68 3,547.64
STREET AND SITE IMPROVEMENTS TOTAL:21,611.80 3,779.18 38,672.74
(B)(C)(D)(E)
Page 6 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 30.00$ SY
* (CBs include frame and lid)
Beehive D-2 103.00$ Each
Through-curb Inlet Framework D-3 460.00$ Each
CB Type I D-4 1,725.00$ Each 2 3,450.00 2 3,450.00
CB Type IL D-5 2,000.00$ Each
CB Type II, 48" diameter D-6 3,500.00$ Each 1 3,500.00 2 7,000.00
for additional depth over 4' D-7 550.00$ FT 4 2,200.00
CB Type II, 54" diameter D-8 4,075.00$ Each
for additional depth over 4'D-9 570.00$ FT
CB Type II, 60" diameter D-10 4,225.00$ Each
for additional depth over 4'D-11 690.00$ FT
CB Type II, 72" diameter D-12 6,900.00$ Each
for additional depth over 4'D-13 975.00$ FT
CB Type II, 96" diameter D-14 16,000.00$ Each
for additional depth over 4'D-15 1,050.00$ FT
Trash Rack, 12"D-16 400.00$ Each
Trash Rack, 15"D-17 470.00$ Each
Trash Rack, 18"D-18 550.00$ Each
Trash Rack, 21"D-19 630.00$ Each
Cleanout, PVC, 4"D-20 170.00$ Each
Cleanout, PVC, 6"D-21 195.00$ Each
Cleanout, PVC, 8"D-22 230.00$ Each
Culvert, PVC, 4" D-23 11.50$ LF
Culvert, PVC, 6" D-24 15.00$ LF 30 450.00
Culvert, PVC, 8" D-25 17.00$ LF
Culvert, PVC, 12" D-26 26.00$ LF 318 8,268.00
Culvert, PVC, 15" D-27 40.00$ LF
Culvert, PVC, 18" D-28 47.00$ LF
Culvert, PVC, 24"D-29 65.00$ LF
Culvert, PVC, 30" D-30 90.00$ LF
Culvert, PVC, 36" D-31 150.00$ LF
Culvert, CMP, 8"D-32 22.00$ LF
Culvert, CMP, 12"D-33 33.00$ LF
SUBTOTAL THIS PAGE:6,950.00 21,368.00
(B)(C)(D)(E)
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Page 7 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 40.00$ LF
Culvert, CMP, 18"D-35 47.00$ LF
Culvert, CMP, 24"D-36 64.00$ LF
Culvert, CMP, 30"D-37 90.00$ LF
Culvert, CMP, 36"D-38 150.00$ LF
Culvert, CMP, 48"D-39 218.00$ LF
Culvert, CMP, 60"D-40 310.00$ LF
Culvert, CMP, 72"D-41 400.00$ LF
Culvert, Concrete, 8"D-42 48.00$ LF
Culvert, Concrete, 12"D-43 55.00$ LF
Culvert, Concrete, 15"D-44 89.00$ LF
Culvert, Concrete, 18"D-45 100.00$ LF
Culvert, Concrete, 24"D-46 120.00$ LF
Culvert, Concrete, 30"D-47 145.00$ LF
Culvert, Concrete, 36"D-48 175.00$ LF
Culvert, Concrete, 42"D-49 200.00$ LF
Culvert, Concrete, 48"D-50 235.00$ LF
Culvert, CPE Triple Wall, 6" D-51 16.00$ LF
Culvert, CPE Triple Wall, 8" D-52 18.00$ LF
Culvert, CPE Triple Wall, 12" D-53 27.00$ LF
Culvert, CPE Triple Wall, 15" D-54 40.00$ LF
Culvert, CPE Triple Wall, 18" D-55 47.00$ LF
Culvert, CPE Triple Wall, 24" D-56 64.00$ LF
Culvert, CPE Triple Wall, 30" D-57 90.00$ LF
Culvert, CPE Triple Wall, 36" D-58 149.00$ LF
Culvert, LCPE, 6"D-59 69.00$ LF
Culvert, LCPE, 8"D-60 83.00$ LF
Culvert, LCPE, 12"D-61 96.00$ LF
Culvert, LCPE, 15"D-62 110.00$ LF
Culvert, LCPE, 18"D-63 124.00$ LF
Culvert, LCPE, 24"D-64 138.00$ LF
Culvert, LCPE, 30"D-65 151.00$ LF
Culvert, LCPE, 36"D-66 165.00$ LF
Culvert, LCPE, 48"D-67 179.00$ LF
Culvert, LCPE, 54"D-68 193.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 8 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 206.00$ LF
Culvert, LCPE, 72"D-70 220.00$ LF
Culvert, HDPE, 6"D-71 48.00$ LF
Culvert, HDPE, 8"D-72 60.00$ LF
Culvert, HDPE, 12"D-73 85.00$ LF
Culvert, HDPE, 15"D-74 122.00$ LF
Culvert, HDPE, 18"D-75 158.00$ LF
Culvert, HDPE, 24"D-76 254.00$ LF
Culvert, HDPE, 30"D-77 317.00$ LF
Culvert, HDPE, 36"D-78 380.00$ LF
Culvert, HDPE, 48"D-79 443.00$ LF
Culvert, HDPE, 54"D-80 506.00$ LF
Culvert, HDPE, 60"D-81 570.00$ LF
Culvert, HDPE, 72"D-82 632.00$ LF
Pipe, Polypropylene, 6"D-83 96.00$ LF
Pipe, Polypropylene, 8"D-84 100.00$ LF
Pipe, Polypropylene, 12"D-85 100.00$ LF
Pipe, Polypropylene, 15"D-86 103.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 119.00$ LF
Pipe, Polypropylene, 30"D-89 136.00$ LF
Pipe, Polypropylene, 36"D-90 185.00$ LF
Pipe, Polypropylene, 48"D-91 260.00$ LF
Pipe, Polypropylene, 54"D-92 381.00$ LF
Pipe, Polypropylene, 60"D-93 504.00$ LF
Pipe, Polypropylene, 72"D-94 625.00$ LF
Culvert, DI, 6"D-95 70.00$ LF
Culvert, DI, 8"D-96 101.00$ LF
Culvert, DI, 12"D-97 121.00$ LF
Culvert, DI, 15"D-98 148.00$ LF
Culvert, DI, 18"D-99 175.00$ LF
Culvert, DI, 24"D-100 200.00$ LF
Culvert, DI, 30"D-101 227.00$ LF
Culvert, DI, 36"D-102 252.00$ LF
Culvert, DI, 48"D-103 279.00$ LF
Culvert, DI, 54"D-104 305.00$ LF
Culvert, DI, 60"D-105 331.00$ LF
Culvert, DI, 72"D-106 357.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 9 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Specialty Drainage Items
Ditching SD-1 10.90$ CY
Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF
French Drain (3' depth)SD-4 30.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.40$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each
Pond Overflow Spillway SD-7 18.25$ SY
Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each
Riprap, placed SD-11 48.20$ CY
Tank End Reducer (36" diameter)SD-12 1,375.00$ Each
Infiltration pond testing SD-13 143.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 60,000.00$ Each 1 60,000.00
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:60,000.00
(B)(C)(D)(E)
Page 10 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
WI-1
WI-2
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:6,950.00 81,368.00
SALES TAX @ 10.1%701.95 8,218.17
DRAINAGE AND STORMWATER FACILITIES TOTAL:7,651.95 89,586.17
(B) (C) (D) (E)
Page 11 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 3,400.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF
Gate Valve, 4 inch Diameter W-7 1,225.00$ Each
Gate Valve, 6 inch Diameter W-8 1,350.00$ Each
Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each
Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each
Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each
Fire Hydrant Assembly W-12 5,000.00$ Each
Permanent Blow-Off Assembly W-13 1,950.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each
WATER SUBTOTAL:
SALES TAX @ 10.1%
WATER TOTAL:
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 12 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
CED Permit #:########
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,150.00$ Each 3 3,450.00
Grease Interceptor, 500 gallon SS-2 9,200.00$ Each
Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each
Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF 189 20,790.00
Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF 122 14,640.00
Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF
Manhole, 48 Inch Diameter SS-11 6,900.00$ Each 1 6,900.00
Manhole, 54 Inch Diameter SS-13 6,800.00$ Each
Manhole, 60 Inch Diameter SS-15 7,600.00$ Each
Manhole, 72 Inch Diameter SS-17 10,600.00$ Each
Manhole, 96 Inch Diameter SS-19 16,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF
Outside Drop SS-24 1,700.00$ LS
Inside Drop SS-25 1,150.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:21,540.00 24,240.00
SALES TAX @ 10.1%2,175.54 2,448.24
SANITARY SEWER TOTAL:23,715.54 26,688.24
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 13 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name:Project Name:
PE Registration No:CED Plan # (LUA):
Firm Name:CED Permit # (C):
Firm Address:Site Address:
Phone No.Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b)(b)45,327.34$
Future Public Improvements Subtotal (c)3,779.18$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)97,238.12$
(e)
(f)
Site Restoration
Civil Construction Permit
Maintenance Bond 29,268.93$
Bond Reduction 2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead, profit, and taxes.
EST1
((b) + (c) + (d)) x 20%
-$
MAINTENANCE BOND */**
(after final acceptance of construction)
5,345.36$
45,327.34$
165,229.13$
5,345.36$
-$
97,238.12$
-$
170,574.49$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
1/26/2022
Sheri Murata
41846
Core Design Inc.
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by:Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
425.885.7877
shm@coredesigninc.com
Hardy Short Plat
21-000169
857 Field Avenue NE
1437650040
FOR APPROVAL
########
12100 NE 195th St, Suite #300, Bothell, WA 98011
Page 14 of 14
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 1/26/2022
2016 KING COUNTY SURFACE WATER DESIGN MANUAL, REFERENCE D
4/24/2016
Page 1
STORMWATER FACILITY SUMMARY SHEET DPER Permit No.___________________
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)Date ___________________
OVERVIEW:NPDES Permit No.___________________
Project Name
Parcel No.____________________________
Project Location Retired Parcel No.____________________________
Downstream Drainage Basins:Project includes Landscape Management Plan?yes
Major Basin Name ______________________________________________(include copy with TIR as Appendix)no
Immediate Basin Name ______________________________________________
GENERAL FACILITY INFORMATION: Leachable Metals
Infiltration Impervious Surface Limit
Type # of Type # of Type # of facilities Flow Control BMPs
Ponds ______ Ponds ______ Ponds ______ Basic Clearing Limit
Vaults ______ Tanks ______ Vaults ______ Conservation Drainage Facility
Tanks ______ Trenches _____ Tanks ______ Flood Problem Landscape Management Plan
If no flow control facility, check one:
Project qualifies for KCSWDM Exemption (KCSWDM 1.2.3):
Basic Exemption (Applies to Commercial parcels only)Area % of Total
Redevelopment projects
Cost Exemption for Parcel Redevelopment projects
Direct Discharge Exemption
Other _____________________ Total impervious surface served by
Project qualifies for 0.1 cfs Exception per KCSWDM 1.2.3 flow control facility(ies) (sq ft)
Impervious surface served by flow
KCSWDM Adjustment No. ___________________control facility(ies) designed
1990 or later (sq ft)
approved KCSWDM Adjustment No. __________________ Impervious surface served by
Shared Facility Name/Location: _________________________ pervious surface absorption (sq ft)
No flow control required (other, provide justification): Impervious surface served by approved
____________________________________________________ water quality facility(ies) (sq ft)
Flow Control
Performance Std
Declarations of Covenant Recording No.
Water QualityDetention
TREATMENT SUMMARY FOR TOTAL IMPERVIOUS SURFACES
-----
Total Impervious Acreage (ac)
No flow control required per approved
Flow control provided in regional/shared facility per approved
PROVIDE FACILITY DETAILS AND FACILITY SKETCH FOR EACH FACILITY ON REVERSE. USE ADDITIONAL SHEETS AS NEEDED FOR ADDITIONAL FACILITIES
Impervious Surface Exemption for Transportation Total Acreage (ac)
1437650040
857 Field Avenue NE
Cedar River/Lake Washington
Lower Cedar River
TBD
1
Hardy Short Plat
4
4
1
2016 KING COUNTY SURFACE WATER DESIGN MANUAL, REFERENCE D
4/24/2016
Page 2
STORMWATER FACILITY SUMMARY SHEET DPER Permit No.___________________
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Project Name Downstream Drainage Basins:
Major Basin Name _______________________________
Project Location Immediate Basin Name ___________________________
FLOW CONTROL FACILITY:Basin:
Facility Name/Number _______________________________________ New Facility Project Impervious
Facility Location ____________________________________________ Existing Facility Acres Served ________
UIC? □ yes □ no UIC Site ID:% of Total Project Impervious
cu.ft.Volume Factor Acres Served ________
_____________ ac.ft.____________of Safety _______No. of Lots Served ________
Control Structure location: _______________________________________________
Type of Control Structure:No. of Orifices/Restrictions __________
Riser in vault Size of Orifice/Restriction (in.) No.1 ______ cu.ft.
Riser in Type II CB (numbered starting with lowest No.2 ______ ac.ft.
Weir in Type II CB orifice): No.3 ______
(inches in decimal format)No.4 ______
WATER QUALITY FACILITIES Design Information
Indicate no. of water quality facilities/BMPs for each type:Water Quality design flow (cfs)
_______Flow dispersion Water Quality treated volume (sandfilter) (cu.ft.)
_______Filter strip Water Quality storage volume (wetpool) (cu.ft.)
_______Biofiltration swale regular, wet or Landscape management plan Farm management plan
continuous inflow
_______Wetvault combined w/detention ______High flow bypass structure (e.g., flow-splitter catch basin)
_______Wetpond basic large combined w/detention ______Oil/water separator baffle coalescing plate
_______Pre-settling pond ______Storm filter
_______Stormwater wetland ______Pre-settling structure (Manufacturer:______________________)
_______Sand filter basic large Sand bed depth ______Catch basin inserts (Manufacturer:________________________)
regular linear vault (inches)______________Source controls _________________________________________
● Is facility lined? yes no If so, what marker is used above liner?_____________________________________________________
Facility Summary Sheet Sketch: All detention, infiltration and water quality facilities must include a detailed sketch (11"x17" reduced size plan sheets preferred).
Dam Safety Regulations (WA State Dept of
Ecology):
Reservoir Volume
above natural grade
Depth of Reservoir
above natural grade (ft)
Live Storage
Volume
Live Storage
Depth (ft)
Cedar River/Lake WashingtonHardy Short Plat
Lower Cedar River
857 Field Avenue NE
on Lot 1 0.41
63%
4,084 6.63 1.08 2
west end of vault
N/A
4
4
4
4
4 .44
.44
.25
.31
N/A
Core Design, Inc. HARDY SHORT PLAT Page 10-1
10. OPERATIONS AND MAINTENANCE
The operations and maintenance information from Appendix A of the 2017 RSWDM are provided in this
section.
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016 A-1
APPENDIX A
MAINTENANCE REQUIREMENTS FOR
STORMWATER FACILITIES AND ON-SITE
BMPS
This appendix contains the maintenance requirements for the following typical stormwater flow control
and water quality facilities and on-site BMPs (ctrl/click the title to follow the link):
No. 1 – Detention Ponds
No. 2 – Infiltration Facilities
No. 3 – Detention Tanks and Vaults
No. 4 – Control Structure/Flow Restrictor
No. 5 – Catch Basins and Manholes
No. 6 – Conveyance Pipes and Ditches
No. 7 – Debris Barriers (e.g., trash racks)
No. 8 – Energy Dissipaters
No. 9 – Fencing
No. 10 – Gates/Bollards/Access Barriers
No. 11 – Grounds (landscaping)
No. 12 – Access Roads
No. 13 – Basic Bioswale (grass)
No. 14 – Wet Bioswale
No. 15 – Filter Strip
No. 16 – Wetpond
No. 17 – Wetvault
No. 18 – Stormwater Wetland
No. 19 – Sand Filter Pond
No. 20 – Sand Filter Vault
No. 21 – Proprietary Facility Cartridge Filter Systems
No. 22 – Baffle Oil/Water Separator
No. 23 – Coalescing Plate Oil/Water Separator
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-2
No. 24 – Catch Basin Insert (not allowed in the city for oil control)
No. 25 – Drywell BMP
No. 26 – Gravel Filled Infiltration Trench BMP
No. 27 – Gravel Filled Dispersion Trench BMP
No. 28 – Native Vegetated Surface/Native Vegetated Landscape BMP
No. 29 – Perforated Pipe Connections BMP
No. 30 – Permeable Pavement BMP
No. 31 – Bioretention BMP
No. 32 – RainWater Harvesting BMP
No. 33 – Rock Pad BMP
No. 34 – Sheet Flow BMP
No. 35 – Splash Block BMP
No. 36 – Vegetated Roof BMP
No. 37 – Rain Garden BMP
No. 38 – Soil Amendment BMP
No. 39 – Retained Trees
No. 40 – Filterra System
No. 41 – Compost Amended Vegetated Filter Strip (CAVFS)
No. 42 – Media Filter Drain (MFD)
No. 43 – Compost-Amended Biofiltration Swale
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-6
NO. 3 – DETENTION TANKS AND VAULTS
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Site Trash and debris Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public.
Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where City personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Excessive growth of grass/groundcover Grass or groundcover exceeds 18 inches in height. Grass or groundcover mowed to a height no greater than 6 inches.
Tank or Vault Storage Area Trash and debris Any trash and debris accumulated in vault or tank (includes floatables and non-floatables).
No trash or debris in vault.
Sediment accumulation Accumulated sediment depth exceeds 10% of the diameter of the storage area for ½ length of storage vault or any point depth exceeds 15% of diameter. Example:
72-inch storage tank would require cleaning when sediment reaches depth of 7 inches for more than ½ length of tank.
All sediment removed from storage area.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of shape Any part of tank/pipe is bent out of shape more than 10% of its design shape. Tank repaired or replaced to design.
Gaps between sections, damaged
joints or cracks or tears in wall
A gap wider than ½-inch at the joint of any tank sections or any evidence of soil
particles entering the tank at a joint or through a wall.
No water or soil entering tank through joints or walls.
Vault Structure Damage to wall, frame, bottom, and/or top slab
Cracks wider than ½-inch, any evidence of soil entering the structure through cracks or qualified inspection personnel determines that the vault is not structurally sound.
Vault is sealed and structurally sound.
Inlet/Outlet Pipes Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged inlet/outlet pipes Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Any open manhole requires immediate maintenance.
Manhole access covered.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-7
NO. 3 – DETENTION TANKS AND VAULTS
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Access Manhole (cont.) Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs of lift. Cover/lid can be removed and reinstalled by one maintenance person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or
cracks.
Ladder meets design standards. Allows
maintenance person safe access.
Large access
doors/plate
Damaged or difficult
to open
Large access doors or plates cannot be
opened/removed using normal equipment.
Replace or repair access door so it can
opened as designed.
Gaps, doesn't cover completely Large access doors not flat and/or access opening not completely covered. Doors close flat; covers access opening completely.
Lifting rings missing, rusted Lifting rings not capable of lifting weight of door or plate. Lifting rings sufficient to lift or remove door or plate.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-8
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Structure Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the structure opening or is blocking capacity of the structure by more than 10%.
No Trash or debris blocking or potentially blocking entrance to structure.
Trash or debris in the structure that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents.
Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the structure to the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section or is
within 6 inches of the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section.
Sump of structure contains no sediment.
Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering structure through cracks, or maintenance person judges that structure is unsound.
Structure is sealed and structurally sound.
Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or
any evidence of soil particles entering structure through cracks.
No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe.
Settlement/ misalignment Structure has settled more than 1 inch or has rotated more than 2 inches out of alignment.
Basin replaced or repaired to design standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of inlet/outlet pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Ladder rungs missing or unsafe Ladder is unsafe due to missing rungs, misalignment, rust, cracks, or sharp edges. Ladder meets design standards and allows maintenance person safe access.
FROP-T Section Damaged FROP-T T section is not securely attached to
structure wall and outlet pipe structure should support at least 1,000 lbs of up or down pressure.
T section securely attached to wall and
outlet pipe.
Structure is not in upright position (allow up to 10% from plumb). Structure in correct position.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-9
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
FROP-T Section (cont.) Damaged FROP-T (cont.) Connections to outlet pipe are not watertight or show signs of deteriorated grout.
Connections to outlet pipe are water tight; structure repaired or replaced and works as designed.
Any holes—other than designed holes—in
the structure.
Structure has no holes other than designed
holes.
Cleanout Gate Damaged or missing cleanout gate Cleanout gate is missing. Replace cleanout gate.
Cleanout gate is not watertight. Gate is watertight and works as designed.
Gate cannot be moved up and down by one maintenance person. Gate moves up and down easily and is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as designed.
Orifice Plate Damaged or missing
orifice plate
Control device is not working properly due
to missing, out of place, or bent orifice plate.
Plate is in place and works as designed.
Obstructions to orifice plate Any trash, debris, sediment, or vegetation blocking the plate. Plate is free of all obstructions and works as designed.
Overflow Pipe Obstructions to
overflow pipe
Any trash or debris blocking (or having the
potential of blocking) the overflow pipe.
Pipe is free of all obstructions and works
as designed.
Deformed or damaged lip of overflow pipe
Lip of overflow pipe is bent or deformed. Overflow pipe does not allow overflow at an elevation lower than design
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged inlet/outlet
pipe
Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the
joint of the inlet/outlet pipe.
Metal Grates (If applicable) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more
than 20% of grate surface.
Grate free of trash and debris. footnote to
guidelines for disposal
Damaged or missing grate Grate missing or broken member(s) of the grate. Grate is in place and meets design standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-10
NO. 5 – CATCH BASINS AND MANHOLES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Structure Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin.
Sump of catch basin contains no sediment.
Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%.
No Trash or debris blocking or potentially blocking entrance to catch basin.
Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin.
No trash or debris in the catch basin.
Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane).
No dead animals or vegetation present within catch basin.
Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents.
Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch
basin is unsound.
Catch basin is sealed and is structurally sound.
Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks.
No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe.
Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment.
Basin replaced or repaired to design standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of inlet/outlet pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and non-floatables).
No trash or debris in pipes.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-11
NO. 5 – CATCH BASINS AND MANHOLES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Inlet/Outlet Pipe (cont.) Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris. footnote to guidelines for disposal
Damaged or missing grate Grate missing or broken member(s) of the grate. Any open structure requires urgent maintenance.
Grate is in place and meets design standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-12
NO. 6 – CONVEYANCE PIPES AND DITCHES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes.
Vegetation/root growth in pipe Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate.
No contaminants present other than a surface oil film.
Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe.
Pipe repaired or replaced.
Damaged pipes Any dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches.
Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public.
Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where City personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Excessive vegetation growth Vegetation that reduces free movement of water through ditches. Water flows freely through ditches.
Erosion damage to
slopes
Any erosion observed on a ditch slope. Slopes are not eroding.
Rock lining out of place or missing (If applicable)
One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil.
Replace rocks to design standards.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-40
NO. 28 – NATIVE VEGETATED SURFACE/NATIVE VEGETATED LANDSCAPE BMP
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Site Trash and debris Trash and debris accumulated on the native vegetated surface/native vegetated landscape site.
Native vegetated surface site free of any trash or debris.
Vegetation Insufficient vegetation Less than two species each of native
trees, shrubs, and groundcover occur in the design area.
A minimum of two species each of native
trees, shrubs, and groundcover is established and healthy.
Poor vegetation
coverage
Less than 90% if the required vegetated
area has healthy growth.
A minimum of 90% of the required
vegetated area has healthy growth.
Undesirable
vegetation present
Weeds, blackberry, and other undesirable
plants are invading more than 10% of vegetated area.
Less than 10% undesirable vegetation
occurs in the required native vegetated surface area.
Vegetated Area Soil compaction Soil in the native vegetation area
compacted.
Less than 8% of native vegetation area is
compacted.
Insufficient vegetation Less than 3.5 square feet of native vegetation area for every 1 square foot of impervious surface.
A minimum of 3.5 square feet of native vegetation area for every 1 square foot of impervious surface.
Excess slope Slope of native vegetation area greater than 15%. Slope of native growth area does not exceed 15%.
NO. 29 – PERFORATED PIPE CONNECTIONS BMP
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Preventive Blocking, obstructions Debris or trash limiting flow into perforated pipe system or outfall of BMP is plugged or otherwise nonfunctioning.
Outfall of BMP is receiving designed flows from perforated pipe connection.
Inflow Inflow impeded Inflow into the perforated pipe is partially or fully blocked or altered to prevent flow from
getting into the pipe.
Inflow to the perforated pipe is unimpeded.
Pipe Trench Area Surface compacted Ground surface over the perforated pipe trench is compacted or covered with impermeable material.
Ground surface over the perforated pipe is not compacted and free of any impervious cover.
Outflow Outflow impeded Outflow from the perforated pipe into the
public drainage system is blocked.
Outflow to the public drainage system is
unimpeded.
Outfall Area Erosion or landslides Existence of the perforated pipe is causing or exasperating erosion or landslides. Perforated pipe system is sealed off and an alternative BMP is implemented.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-41
NO. 30 – PERMEABLE PAVEMENT BMP
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Preventive Surface cleaning/ vegetation control Media surface vacuumed or pressure washed annually, vegetation controlled to design maximum. Weed growth suggesting sediment accumulation.
No dirt, sediment, or debris clogging porous media, or vegetation limiting infiltration.
Porous Concrete, Porous Asphaltic Concrete, and Permeable Pavers
Trash and debris Trash and debris on the pavement interfering with infiltration; leaf drop in fall season.
No trash or debris interfering with infiltration.
Sediment accumulation Sediment accumulation on the pavement interfering with infiltration; runoff from adjacent areas depositing sediment/debris on pavement.
Pavement infiltrates as designed; adjacent areas stabilized.
Insufficient infiltration rate Pavement does not infiltrate at a rate of 10 inches per hour. Pavement infiltrates at a rate greater than 10 inches per hour.
Excessive ponding Standing water for a long period of time on the surface of the pavement. Standing water infiltrates at the desired rate.
Broken or cracked pavement Pavement is broken or cracked. No broken pavement or cracks on the surface of the pavement.
Settlement Uneven pavement surface indicating settlement of the subsurface layer. Pavement surface is uniformly level.
Moss growth Moss growing on pavement interfering with infiltration. No moss interferes with infiltration.
Inflow restricted Inflow to the pavement is diverted,
restricted, or depositing sediment and debris on the pavement.
Inflow to pavement is unobstructed and not
bringing sediment or debris to the pavement.
Underdrain not freely flowing Underdrain is not flowing when pavement has been infiltrating water. Underdrain flows freely when water is present.
Overflow not
controlling excess water
Overflow not controlling excess water to
desired location; native soil is exposed or other signs of erosion damage are present.
Overflow permits excess water to leave the
site at the desired location; Overflow is stabilized and appropriately armored.
Permeable Pavers Broken or missing pavers Broken or missing paving blocks on surface of pavement. No missing or broken paving blocks interfering with infiltration.
Uneven surface Uneven surface due to settlement or scour of fill in the interstices of the paving blocks. Pavement surface is uniformly level.
Compaction Poor infiltration due to soil compaction
between paving blocks.
No soil compaction in the interstices of the
paver blocks limiting infiltration.
Poor vegetation growth (if applicable) Grass in the interstices of the paving blocks is dead. Healthy grass is growing in the interstices of the paver blocks.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016 A-47
NO. 38 – SOIL AMENDMENT BMP
MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED
Soil Media Unhealthy vegetation Vegetation not fully covering ground surface or vegetation health is poor.
Yellowing: possible Nitrogen (N) deficiency. Poor growth: possible
Phosphorous (P) deficiency. Poor flowering, spotting or curled leaves, or weak roots or stems: possible Potassium
(K) deficiency.
Plants are healthy and appropriate for site conditions
Inadequate soil nutrients and
structure
In the fall, return leaf fall and shredded woody materials from the landscape to the
site when possible
Soil providing plant nutrients and structure
Excessive vegetation growth Grass becomes excessively tall (greater than 10 inches); nuisance weeds and other
vegetation start to take over.
Healthy turf- “grasscycle” (mulch-mow or leave the clippings) to build turf health
Weeds Preventive maintenance Avoid use of pesticides (bug and weed killers), like “weed & feed,” which damage
the soil
Fertilizer needed Where fertilization is needed (mainly turf and annual flower beds), a moderate
fertilization program should be used which relies on compost, natural fertilizers or slow-release synthetic balanced fertilizers
Integrated Pest Management (IPM) protocols for fertilization followed
Bare spots Bare spots on soil No bare spots, area covered with
vegetation or mulch mixed into the underlying soil.
Compaction Poor infiltration due to soil compaction
• To remediate compaction, aerate
soil, till to at least 8-inch depth, or further amend soil with compost and
re-till
• If areas are turf, aerate compacted areas and top dress them with 1/4 to
1/2 inch of compost to renovate them
• If drainage is still slow, consider investigating alternative causes (e.g.,
high wet season groundwater levels, low permeability soils)
• Also consider site use and protection
from compacting activities
No soil compaction
Poor infiltration Soils become waterlogged, do not appear to be infiltrating. Facility infiltrating properly
Erosion/Scouring Erosion Areas of potential erosion are visible Causes of erosion (e.g., concentrate flow entering area, channelization of runoff) identified and damaged area stabilized (regrade, rock, vegetation, erosion control
matting).For deep channels or cuts (over 3 inches in ponding depth), temporary
erosion control measures in place until
permanent repairs can be made
Grass/Vegetation Unhealthy vegetation Less than 75% of planted vegetation is
healthy with a generally good appearance.
Healthy vegetation. Unhealthy plants
removed/replaced. Appropriate vegetation planted in terms of exposure, soil and soil
moisture.
Noxious Weeds Noxious weeds Listed noxious vegetation is present (refer to current County noxious weed list). No noxious weeds present.
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual A-48
NO. 39 – RETAINED TREES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Tree Dead or declining Dead, damaged, or declining Tree replaced per planting plan or acceptable substitute
NO. 40 – FILTERRA SYSTEM
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
In addition to the specific maintenance criteria provided below, all manufacturer’s requirements shall be followed.
Facility – General Requirements Life cycle Once per year, except mulch and trash removal twice per year Facility is re-inspected and any needed maintenance performed
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries, or paint
Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate.
No contaminants present other than a surface oil film.
Inlet Excessive sediment or trash accumulation Accumulated sediments or trash impair free flow of water into system Inlet should be free of obstructions allowing free distributed flow of water into system
Mulch Cover Trash and floatable debris accumulation Excessive trash and/or debris accumulation Minimal trash or other debris on mulch cover. Mulch cover raked level.
“Ponding” of water on mulch cover “Ponding” in unit could be indicative of clogging due to excessive fine sediment accumulation or spill of petroleum oils
Stormwater should drain freely and evenly through mulch cover
Proprietary Filter Media/ Vegetation Substrate
“Ponding” of water on mulch cover after mulch cover has been maintained
Excessive fine sediment passes the mulch cover and clogs the filter media/vegetative substrate
Stormwater should drain freely and evenly through mulch cover. Replace substrate and vegetation when needed
Vegetation Plants not growing or in poor condition Soil/mulch too wet, evidence of spill, incorrect plant selection, pest infestation,
and/or vandalism to plants
Plants should be healthy and pest free
Media/mulch too dry Irrigation is required
Plants absent Plants absent Appropriate plants are present
Excessive plant growth Excessive plant growth inhibits facility function or becomes a hazard for pedestrian and vehicular circulation and safety
Pruning and/or thinning vegetation maintains proper plant density. Appropriate plants are present.
Structure Structure has visible cracks Cracks wider than ½ inch
Evidence of soil particles entering the structure through the cracks
Structure is sealed and structurally sound
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.56
Program License Number: 200210008
Project Simulation Performed on: 01/13/2022 2:52 PM
Report Generation Date: 01/13/2022 2:52 PM
—————————————————————————————————
Input File Name: Vault Sizing 65%.fld
Project Name: Hardy Short Plat
Analysis Title: Vault Sizing
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 16
Full Period of Record Available used for Routing
Precipitation Station : 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961044 Puget East 44 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 3
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.406 0.406
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 0.406 0.406
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 0.366
Impervious 0.040
----------------------------------------------
Subbasin Total 0.406
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Grass 0.152
Impervious 0.254
----------------------------------------------
Subbasin Total 0.406
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: Vault
Link Type: Structure
Downstream Link: None
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 456.59
Riser Crest Elevation (ft) : 463.22
Max Pond Elevation (ft) : 463.72
Storage Depth (ft) : 6.63
Pond Bottom Length (ft) : 43.0
Pond Bottom Width (ft) : 14.0
Pond Side Slopes (ft/ft) : Z1= 0.00 Z2= 0.00 Z3= 0.00 Z4= 0.00
Bottom Area (sq-ft) : 602.
Area at Riser Crest El (sq-ft) : 602.
(acres) : 0.014
Volume at Riser Crest (cu-ft) : 3,991.
(ac-ft) : 0.092
Area at Max Elevation (sq-ft) : 602.
(acres) : 0.014
Vol at Max Elevation (cu-ft) : 4,292.
(ac-ft) : 0.099
Hydraulic Conductivity (in/hr) : 0.00
Massmann Regression Used to Estimate Hydralic Gradient
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 12.00
Common Length (ft) : 0.000
Riser Crest Elevation : 463.22 ft
Hydraulic Structure Geometry
Number of Devices: 4
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 456.59
Diameter (in) : 0.44
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Control Elevation (ft) : 460.30
Diameter (in) : 0.44
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 461.65
Diameter (in) : 0.25
Orientation : Horizontal
Elbow : Yes
---Device Number 4 ---
Device Type : Circular Orifice
Control Elevation (ft) : 462.05
Diameter (in) : 0.31
Orientation : Horizontal
Elbow : Yes
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
********** Subbasin: Subbasin 1 **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs)
======================================
2-Year 0.115
5-Year 0.153
10-Year 0.183
25-Year 0.233
50-Year 0.294
100-Year 0.364
200-Year 0.372
500-Year 0.382
********** Link: Vault ********** Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
======================================
1.05-Year 458.413
1.11-Year 458.742
1.25-Year 459.063
2.00-Year 459.939
3.33-Year 460.455
5-Year 460.959
10-Year 461.925
25-Year 462.863
50-Year 463.233
100-Year 463.238
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 69.628
_____________________________________
Total: 69.628
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 19.577
Link: Vault 0.000
_____________________________________
Total: 19.577
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.441 ac-ft/year, Post Developed: 0.124 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: Vault **********
Basic Wet Pond Volume (91% Exceedance): 1406. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 2109. cu-ft
2-Year Discharge Rate : 0.009 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.04 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 164.83
Inflow Volume Including PPT-Evap (ac-ft): 164.83
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 164.82
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: Vault
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.086E-02 2-Year 9.454E-03
5-Year 2.991E-02 5-Year 1.478E-02
10-Year 3.755E-02 10-Year 1.902E-02
25-Year 5.051E-02 25-Year 2.477E-02
50-Year 5.877E-02 50-Year 4.799E-02
100-Year 6.410E-02 100-Year 5.652E-02
200-Year 8.825E-02 200-Year 7.147E-02
500-Year 0.121 500-Year 9.140E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -32.0% PASS
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -1.1% PASS
Maximum Excursion from Q2 to Q50 (Must be less than 10%): -3.8% PASS
Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): 205.0% FAIL
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): 337.8% FAIL
-------------------------------------------------------------------------------------------------
LID DURATION DESIGN CRITERIA: FAIL
-------------------------------------------------------------------------------------------------
Lake
Desire
Shady
Lake (Mud
Lake)
Panther
Lake Lake
Youngs
Lake
Washington
B l ack Ri v e r
Gr ee n Ri
ver
Ce
darRi v erUV900
UV167
UV515
UV169
UV900
UV169
UV167BN IncBN IncBBNNIInnccSSEE
RReennttoonn IIssssaaqquuaahh RR dd
RReennttoonnMMaapplleeVVaalllleeyyRRdd
MMaapplleeVVaalllleeyyHHwwyy
110088tthhAAvveeSSEESSWW SSuunnsseettBBllvvdd RRaaii
nnii
eerrAAvveeNNNE 3rd S
t
NE 3rd S
t
SW 43rd StSW 43rd St SSEE CC aarrrrRR dd
NE 4th StNE 4th St
SSEERReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN
SR 515SR 515PPaarrkkAAvveeNNOOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNNEE
DDuuvvaallllAAvveeNNEEI-405 FWYI-405 FWY II--440055FFWWYYSR 167SR 1671144
00tthh
WWaayy
SS
EENNEE2277tthh SStt
115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St
N 8th StN 8th St
PP uuggeettDD rrSSEE
RR
ee
nnttoo
nnAAvvee SS
SSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEESE 128th StSE 128th St
II
nntt
eerr
uurr
bbaannAA
vvee
SS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeett
rr
oovvii
tt
sskkyyRRddEEVVaalllleeyyHHwwyySE 192nd StSE 192nd St
SE 60th StSE 60th St
TTaallbboottRRddSSRRee
nn
tt
oo
nn
AAvveeSS116644tthhAAvveeSSEESE 208th StSE 208th St
SE 72nd StSE 72nd St
RR
aaiinniieerr
AAvvee
SS 111166tthhAAvveeSSEES 128th StS 128th St
NNeewwccaassttllee WWaayy
SS 221122tthh SStt
SS118800tthh SStt CCooaall
CCrreeeekkPPkkwwyySSEESW 41st StSW 41st St
114400tthhAAvveeSSEE112288tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt
NE 12th StNE 12th St
BBeeaacc
oonn
AAvv
ee
SSFFoorreesstt DDrr SSEE
SSEE 116644tthh SStt 114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyyRRdd
SS EE JJoonneess RRdd
SS EE 22 00 44 tthh WW aayySW 34th StSW 34th St
SE 144th StSE 144th St
114488tthhAAvveeSSEE115544tthhPPllSSEELL
aa
kk
ee
WWaa
sshhii
nnggtt
oonnBBll
vvddNNEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEEEMM eerrcceerrWWaayyWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405
,§-405
,§-405
µ0 1 2
Miles
Flow Control Application Map
Reference 1-A
Date: 01/09/2014
Flow Control Standards
Peak Rate Flow Control Standard (Existing Site Conditions)
Flow Control Duration Standard (Existing Site Conditions)
Flow Control Duration Standard (Forested Conditions)
Flood Problem Flow
Unincorporated King County Flow Control Standards
Renton City Limits
Potential Annexation Area
PROJECT SITE
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLind Ave SWMainAveSS 132nd St
Factory
PlN
Tal
bot
Rd
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
In
t
e
r
u
r
b
a
n
A
v
e
S WilliamsAveNBronsonWa y N
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySESW 41st St
Ta
y
l
o
r
P
l
NW NESunsetBlvdWellsAveNUnionAveNENE 3rd St
Hardie
Av
eSWS180th St
Maple
V
a
l
l
e
y
H
w
y
140thAveSES G ra d y W ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE 168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSES E 183rdStBe
n
s
on
D
r
S
S124th StS 43rd St
Airport Way
S W G ra dyW a y
SE J o n es RdSunsetBlvdN
Puget Dr SESE 204th
Way
SW 34th StMo
n
sterRdSW SE 142nd Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNS Carr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRaini
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WM ercerWayWMercer
W
ay LakemontBl
vdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of Renton
Sensitive Areas
0 0.5 10.25
Miles
Information Technology - GIS
mapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteed
to survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended for
City display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Aquifer Protection
Zone 1
Zone 1 Modified
Zone 2
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
PROJECT SITE
RentonKent
Newcastle
King CountyTukwilaMercer Island
Bellevu
e
Lake Washington
Lake Youngs
Panther Lake
Lake Boren
Cedar RiverBlack River
May Creek
Springbrook Creek
Cougar MountainCougar Mountain
Coal Creek ParkCoal Creek Park
Cedar River Natural ZoneCedar River Natural Zone
May Creek ParkMay Creek Park
Soos Creek Park and TrailSoos Creek Park and Trail
Black River Riparian ForestBlack River Riparian Forest
McGarvey Open SpaceMcGarvey Open Space
Maplewood Community ParkMaplewood Community Park
ValleyValley
BensonBenson
HighlandsHighlands
West HillWest Hill
East PlateauEast Plateau
SE 192ND STTALBOT RD S140TH AVE SERAI
N
I
E
R
A
V
E
S
EAST VALLEY RDSE 168TH ST
RENTON A
V
E
S116TH AVE SENE 12TH STE M ERCER WAY148TH AVE SENE 7TH S T84TH AVE SHOQUIAM AVE NENEWCASTLE WAY
W
M
E
RCER WAY
S 128TH ST
SW 41ST ST PARK AVE N128TH AVE SESE JONES R D
E VALLEY HWYSE 72ND ST
SE 164TH ST NILE AVE NEN 10TH S T
SE 183RD S
TUNION AVE NE156TH AVE SEUNION AVE SENE 2ND ST 148TH AVE SESE 164TH STLIND AVE SWUNION AVE NE116TH AVE SESW 7TH ST
N 8TH ST EDMONDS AVE NEPUGET DR S E
NE 27TH ST
156TH AVE SERENTON AVE S
BENSON RD SMONROE AVE NE116TH AVE SENE 4TH ST
SR
515
SUNS E T B LV D N E
PARK AVE NMAPLE VALLEY HWY
SW 43RD ST
NE 3RD STLOGAN AVE NSW SU
NSET BLVD
SW GRADY W
A
Y
N 3RD STRAINIER AVE N
140TH WAY SESR 167108TH AVE SEN 6TH ST
S 2ND ST
108TH AVE SESR 515[^405
[^405
Effective FEMA Flood
Insurance Rate Map
µ
Legend
Renton City Limits
Zone AE, A, AH, AO - Regulatory
Zone X - Non Regulatory
0 0.5 10.25 Miles
Public Works - Surface Water UtilityPrint Date: 11/05/2012
Data Sources: City of Renton, FEMA FIRM revised May 16, 1995.Cedar River flood hazard area updated with FEMA Cedar RiverLOMR (Case No. 06-10-B569P) approved December 4, 2006.
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
PROJECT SITE
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLind Ave SWMainAveSS 132nd St
Factory
PlN
Tal
bot
Rd
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
In
t
e
r
u
r
b
a
n
A
v
e
S WilliamsAveNBronsonWa y N
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySESW 41st St
Ta
y
l
o
r
P
l
NW NESunsetBlvdWellsAveNUnionAveNENE 3rd St
Hardie
Av
eSWS180th St
Maple
V
a
l
l
e
y
H
w
y
140thAveSES G ra d y W ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE 168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSES E 183rdStBe
n
s
on
D
r
S
S124th StS 43rd St
Airport Way
S W G ra dyW a y
SE J o n es RdSunsetBlvdN
Puget Dr SESE 204th
Way
SW 34th StMo
n
sterRdSW SE 142nd Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNS Carr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRaini
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WM ercerWayWMercer
W
ay LakemontBl
vdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of Renton
Sensitive Areas
0 0.5 10.25
Miles
Information Technology - GIS
mapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteed
to survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended for
City display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Coal Mine HazardsSeverity
HIGH
MODERATE
UNCLASSIFIED
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
PROJECT SITE
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLind Ave SWMainAveSS 132nd St
Factory
PlN
Tal
bot
Rd
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
In
t
e
r
u
r
b
a
n
A
v
e
S WilliamsAveNBronsonWa y N
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySESW 41st St
Ta
y
l
o
r
P
l
NW NESunsetBlvdWellsAveNUnionAveNENE 3rd St
Hardie
Av
eSWS180th St
Maple
V
a
l
l
e
y
H
w
y
140thAveSES G ra d y W ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE 168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSES E 183rdStBe
n
s
on
D
r
S
S124th StS 43rd St
Airport Way
S W G ra dyW a y
SE J o n es RdSunsetBlvdN
Puget Dr SESE 204th
Way
SW 34th StMo
n
sterRdSW SE 142nd Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNS Carr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRaini
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WM ercerWayWMercer
W
ay LakemontBl
vdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of Renton
Sensitive Areas
0 0.5 10.25
Miles
Information Technology - GIS
mapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteed
to survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended for
City display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Erosion HazardSeverity
High
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
PROJECT SITE
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLind Ave SWMainAveSS 132nd St
Factory
PlN
Tal
bot
Rd
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
In
t
e
r
u
r
b
a
n
A
v
e
S WilliamsAveNBronsonWa y N
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySESW 41st St
Ta
y
l
o
r
P
l
NW NESunsetBlvdWellsAveNUnionAveNENE 3rd St
Hardie
Av
eSWS180th St
Maple
V
a
l
l
e
y
H
w
y
140thAveSES G ra d y W ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE 168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSES E 183rdStBe
n
s
on
D
r
S
S124th StS 43rd St
Airport Way
S W G ra dyW a y
SE J o n es RdSunsetBlvdN
Puget Dr SESE 204th
Way
SW 34th StMo
n
sterRdSW SE 142nd Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNS Carr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRaini
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WM ercerWayWMercer
W
ay LakemontBl
vdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of Renton
Sensitive Areas
0 0.5 10.25
Miles
Information Technology - GIS
mapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteed
to survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended for
City display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Landslide Hazard
Severity
Very High
High
Moderate
Unclassified
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
PROJECT SITE
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLind Ave SWMainAveSS 132nd St
Factory
PlN
Tal
bot
Rd
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
In
t
e
r
u
r
b
a
n
A
v
e
S WilliamsAveNBronsonWa y N
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySESW 41st St
Ta
y
l
o
r
P
l
NW NESunsetBlvdWellsAveNUnionAveNENE 3rd St
Hardie
Av
eSWS180th St
Maple
V
a
l
l
e
y
H
w
y
140thAveSES G ra d y W ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE 168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSES E 183rdStBe
n
s
on
D
r
S
S124th StS 43rd St
Airport Way
S W G ra dyW a y
SE J o n es RdSunsetBlvdN
Puget Dr SESE 204th
Way
SW 34th StMo
n
sterRdSW SE 142nd Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNS Carr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRaini
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WM ercerWayWMercer
W
ay LakemontBl
vdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of Renton
Sensitive Areas
0 0.5 10.25
Miles
Information Technology - GIS
mapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteed
to survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended for
City display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Steep SlopesPercent Range
>15% & <=25%
>25% & <=40%
>40% & <=90%
>90%Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
PROJECT SITE
Cobalt Geosciences, LLC
P.O. Box 82243
Kenmore, Washington 98028
www.cobaltgeo.com (206) 331-1097
November 22, 2021
Mr. Bob Wenzl
Tuscany Homes
RE: Geotechnical Addendum
Proposed Residence
857 Field Avenue NE
Renton, Washington
In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to
discuss our plan review. We have reviewed the civil plan sheet C4.01 by Core Design which
shows the planned building/road layout and detention system.
While large-scale infiltration systems are not feasible, permeable pavements may be utilized for
driveway and/or walkway areas provided the following recommendations are incorporated:
Subgrades should be stripped of topsoil to expose the weathered glacial till
Subgrades should not be compacted or driven on by equipment until area is completed
with pavement or concrete
Geotechnical engineer to verify soil conditions and grading prior to rock placement to
verify gradients and density
Minimum 8 inch thick base rock over subgrade (5/8 inch clean angular rock)
Minimum 5 inch thick asphalt or concrete, although 6 to 8 inches is more common
We can provide additional input upon request. Please notify us if new or existing buildings have
basement levels, so that we may provide an underdrain recommendation.
Closure
The information presented herein is based upon professional interpretation utilizing standard
practices and a degree of conservatism deemed proper for this project. We emphasize that this
report is valid for this project as outlined above and for the current site conditions and should not
be used for any other site.
Sincerely,
Cobalt Geosciences, LLC
Phil Haberman, PE, LG, LEG
Principal
Cobalt Geosciences, LLC
P.O. Box 82243
Kenmore, Washington 98028
www.cobaltgeo.com (206) 331-1097
January 6, 2021
Mr. Bob Wenzl
Tuscany Homes
RE: Stormwater Feasibility Evaluation
Proposed Residence
857 Field Avenue NE
Renton, Washington
Dear Mr. Wenzl,
In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to
discuss the results of our stormwater feasibility evaluation at the referenced site.
The purpose of our evaluation was to determine the feasibility of utilizing infiltration devices for
stormwater runoff management.
Site and Project Description
The site is located at 857 Field Avenue NE in Renton, Washington. The site consists of one
rectangular parcel (No. 1437650040) with a total area of about 15,130 square feet.
The eastern portion of the property is developed with a residence and driveway. The remainder of
the property is undeveloped and vegetated with grasses, bushes/shrubs, and variable diameter
evergreen and deciduous trees.
The site slope gently downward from east to west at magnitudes of 5 to 10 percent and total relief
of about 12 feet.
The property is bordered to the north, west, and south by residential parcels and to the east by
Field Avenue NE.
The project includes subdivision of the property followed by construction of a new residence. We
anticipate that the existing residence will remain in place. Stormwater management may include
dispersion, detention, or infiltration facilities depending on feasibility.
Area Geology
The Geologic Map of King County indicates that the site is underlain by Vashon Glacial Till.
Vashon Glacial Till is typically characterized by an unsorted, non-stratified mixture of clay, silt,
sand, gravel, cobbles and boulders in variable quantities. These materials are typically dense and
relatively impermeable. The poor sorting reflects the mixing of the materials as these sediments
were overridden and incorporated by the glacial ice.
Soil & Groundwater Conditions
As part of our evaluation, we excavated two test pits to determine the shallow soil and
groundwater conditions, where accessible.
January 6, 2021 Page 2 of 3 Stormwater Feasibility Evaluation
www.cobaltgeo.com (206) 331-1097
The test pit encountered approximately 6 inches of topsoil and vegetation underlain by
approximately 2.5 to 3 feet of loose to medium dense, silty-fine to medium grained sand with
gravel (Weathered Glacial Till). These materials were underlain by dense, silty-fine to medium
grained sand with gravel (Glacial Till), which continued to the termination depths of the test pits.
Groundwater was not encountered in the test pits. Groundwater could be present seasonally
perched on the underlying glacial till.
Stormwater Management Feasibility
The site is underlain by weathered and unweathered glacial till. Unweathered glacial till is nearly
impermeable and not suitable for widespread infiltration of stormwater runoff.
We performed an infiltration test in TP-1 at a depth of about 3 feet below grade. Following
saturation, testing, and application of correction factors for site variability (0.8), influent control
(0.9), and testing (0.5), the infiltration rate was 0.2 inches per hour. This is lower than what is
considered to be feasible for widespread infiltration. We do not recommend the use of infiltration
systems at this site. We recommend either dispersion trenches with vegetated flowpaths or direct
connection to City infrastructure.
Rain gardens and permeable pavements may be feasible depending on the location and elevation
of these systems. We can provide additional input upon request.
We should be provided with final plans for review to determine if the intent of our
recommendations has been incorporated or if additional modifications are needed.
Erosion and Sediment Control
Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to
wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment
control measures should be implemented, and these measures should be in general accordance
with local regulations. At a minimum, the following basic recommendations should be
incorporated into the design of the erosion and sediment control features for the site:
Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance
of the site soils, to take place during the dry season (generally May through September).
However, provided precautions are taken using Best Management Practices (BMP’s), grading
activities can be completed during the wet season (generally October through April).
All site work should be completed and stabilized as quickly as possible.
Additional perimeter erosion and sediment control features may be required to reduce the
possibility of sediment entering the surface water. This may include additional silt fences, silt
fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration
systems.
Any runoff generated by dewatering discharge should be treated through construction of a
sediment trap if there is sufficient space. If space is limited other filtration methods will need
to be incorporated.
January 6, 2021 Page 3 of 3 Stormwater Feasibility Evaluation
www.cobaltgeo.com (206) 331-1097
Closure
The information presented herein is based upon professional interpretation utilizing standard
practices and a degree of conservatism deemed proper for this project. We emphasize that this
report is valid for this project as outlined above and for the current site conditions, and should not
be used for any other site.
Sincerely,
Cobalt Geosciences, LLC
1/6/21
Phil Haberman, PE, LG, LEG
Principal
PH/sc
Proposed Residences
857 Field Avenue NE
Renton, Washington
N
SITE PLAN
FIGURE 1
Cobalt Geosciences, LLCP.O. Box 82243 Kenmore, WA 98028
(206) 331-1097
www.cobaltgeo.com
cobaltgeo@gmail.com
Subject
Property
TP-1
TP-2
PT
Well-graded gravels, gravels, gravel-sand mixtures, little or no fines
Poorly graded gravels, gravel-sand mixtures, little or no fines
Silty gravels, gravel-sand-silt mixtures
Clayey gravels, gravel-sand-clay mixtures
Well-graded sands, gravelly sands, little or no fines
COARSE
GRAINED
SOILS
(more than 50%
retained on
No. 200 sieve)
Primarily organic matter, dark in color,
and organic odor Peat, humus, swamp soils with high organic content (ASTM D4427)HIGHLY ORGANIC
SOILS
FINE GRAINED
SOILS
(50% or more
passes the
No. 200 sieve)
MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION
Gravels
(more than 50%
of coarse fraction
retained on No. 4
sieve)
Sands
(50% or more
of coarse fraction
passes the No. 4
sieve)
Silts and Clays(liquid limit lessthan 50)
Silts and Clays
(liquid limit 50 or
more)
Organic
Inorganic
Organic
Inorganic
Sands with
Fines(more than 12%fines)
Clean Sands
(less than 5%fines)
Gravels with
Fines
(more than 12%
fines)
Clean Gravels
(less than 5%
fines)
Unified Soil Classification System (USCS)
Poorly graded sand, gravelly sands, little or no fines
Silty sands, sand-silt mixtures
Clayey sands, sand-clay mixtures
Inorganic silts of low to medium plasticity, sandy silts, gravelly silts,
or clayey silts with slight plasticity
Inorganic clays of low to medium plasticity, gravelly clays, sandy clays,
silty clays, lean clays
Organic silts and organic silty clays of low plasticity
Inorganic silts, micaceous or diatomaceous fine sands or silty soils,
elastic silt
Inorganic clays of medium to high plasticity, sandy fat clay,
or gravelly fat clay
Organic clays of medium to high plasticity, organic silts
Moisture Content Definitions
Grain Size Definitions
Dry Absence of moisture, dusty, dry to the touch
Moist Damp but no visible water
Wet Visible free water, from below water table
Grain Size Definitions
Description Sieve Number and/or Size
Fines <#200 (0.08 mm)
Sand
-Fine
-Medium
-Coarse
Gravel
-Fine
-Coarse
Cobbles
Boulders
#200 to #40 (0.08 to 0.4 mm)
#40 to #10 (0.4 to 2 mm)
#10 to #4 (2 to 5 mm)
#4 to 3/4 inch (5 to 19 mm)
3/4 to 3 inches (19 to 76 mm)
3 to 12 inches (75 to 305 mm)
>12 inches (305 mm)
Classification of Soil Constituents
MAJOR constituents compose more than 50 percent,
by weight, of the soil. Major constituents are capitalized
(i.e., SAND).
Minor constituents compose 12 to 50 percent of the soil
and precede the major constituents (i.e., silty SAND).
Minor constituents preceded by “slightly” compose
5 to 12 percent of the soil (i.e., slightly silty SAND).
Trace constituents compose 0 to 5 percent of the soil(i.e., slightly silty SAND, trace gravel).
Relative Density Consistency
(Coarse Grained Soils) (Fine Grained Soils)
N, SPT, Relative
Blows/FT Density
0 - 4 Very loose
4 - 10 Loose
10 - 30 Medium dense
30 - 50 Dense
Over 50 Very dense
N, SPT, Relative
Blows/FT Consistency
Under 2 Very soft
2 - 4 Soft4 - 8 Medium stiff8 - 15 Stiff15 - 30 Very stiff
Over 30 Hard
Cobalt Geosciences, LLCP.O. Box 82243Kenmore, WA 98028(206) 331-1097
www.cobaltgeo.com
cobaltgeo@gmail.com
Soil Classification Chart Figure C1
Test Pit
Logs
Cobalt Geosciences, LLCP.O. Box 82243 Kenmore, WA 98028
(206) 331-1097
www.cobaltgeo.com
cobaltgeo@gmail.com
Proposed Residence
857 Field Avenue NE
Renton, Washington
Test Pit TP-1
Date: December 4, 2020
Contractor: Client provided
Depth: 5.5’
Elevation: Logged By: PH Checked By: SC
Groundwater: None
Material Description
Moisture Content (%)PlasticLimit Liquid
Limit
10 20 30 400 50
DCP Equivalent N-Value
10
Test Pit TP-2
Date: December 4, 2020
Contractor: Client provided
Depth: 5.5’
Elevation: Logged By: PH Checked By: SC
Groundwater: None
Material Description
Moisture Content (%)PlasticLimit Liquid
Limit
10 20 30 400 50
1
2
3
4
5
6
DCP Equivalent N-Value
7
8
9
10
Loose to medium dense, silty-fine to medium grained sand with gravel,
reddish brown to yellowish brown, moist.
(Weathered Glacial Till)
SM
End of Test Pit 5.5’
Dense, silty-fine to medium grained sand with gravel,
grayish brown, moist. (Glacial Till) -Locally cemented
SM
Topsoil/Grass
Material Description
Moisture Content (%)Plastic
Limit
Liquid
Limit
10 20 30 400 50
1
2
3
4
5
6
DCP Equivalent N-Value
7
8
9
Loose to medium dense, silty-fine to medium grained sand with gravel,
reddish brown to yellowish brown, moist.
(Weathered Glacial Till)
SM
End of Test Pit 5.5’
Dense, silty-fine to medium grained sand with gravel,
grayish brown, moist. (Glacial Till) -Locally cemented
SM
Topsoil/Grass