SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE
WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO
CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO
THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER,
SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY
THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION
FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL
THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT'S
CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL
UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A
CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY.
REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95 % MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND
MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL
BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92 % OF MAXIMUM DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE
APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE
DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION
MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND
220.20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN
204.10, 204.20, 204.30, 204.40, AND 204.50. STRUCTURES SHALL HAVE:
• RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY.
• ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE.
• ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM.
16. LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN.
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH.
UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (NTS)
AdaSTD. PLAN - 267.00
V
�•i PUBLIC WORKS SURFACE WATER STANDARD PLAN �68�,dby�I DEPARTMENT NOTES (1 OF 2) artin Pastucha8/13/2020
Martin Pas ha
8&'hH�3faId886iA4®D... DATE
1
SEE STANDARD PLANS 110, 110.1, 110.2, AND 111 FOR PAVEMENT
RESTORATION REQUIREMENTS
SURFACE RESTORATION AS
SPECIFIED IN CONTRACT DOCUMENTS
12" MIN. EXISTING PAVEMENT SURFACE
II
----Z
----------
NEAT LINE TRENCH
i" MIN., SEE NOTE 4
� X \ I
"CRUSHED SURFACING TOP COURSE" PER
WSDOT STD. SPEC 9-03.9(3), COMPACTED
TO 95% OF MAXIMUM DENSITY
"CRUSHED SURFACING TOP COURSE" PER
WSDOT STD. SPEC 9-03.9(3), "BANK RUN
GRAVEL FOR TRENCH BACKFILL" PER
WSDOT STD. SPEC 9-03.19, OR "GRAVEL
BORROW" PER WSDOT STD. SPEC 9-03.14(1),
COMPACTED TO 95 % OF MAXIMUM DENSITY
BENCH NEEDED FOR
SHORING
SYSTEM WHEN t /
DEPTH IS 4' OR GREATER
PIPE \\�
PIPE ZONE BEDDING AND BACKFILL
PER STD. PLANS 220.00 AND 220.10 )/A
SEE NOTE 1
UNPAVED AREAS I PAVED AREAS
NOTES:
1. SEE WSDOT/APWA STANDARD SPECIFICATIONS SECTION 2-09.4 FOR
MEASUREMENT OF TRENCH WIDTH.
2. EXCAVATIONS OVER 4' DEEP SHALL COMPLY WITH THE SAFETY STANDARD
DESCRIBED IN CHAPTER 295-155 PART N OF THE WAC.
3. MAXIMUM BACKFILL DEPTH ABOVE PIPE SHALL NOT BE EXCEEDED, AS
DETERMINED BY PIPE MANUFACTURER.
4. IN PAVED AREAS, IF PIPE HAS LESS THAN 3' OF COVER, USE "CRUSHED
SURFACING TOP COURSE" FOR THE ENTIRE BACKFILL DEPTH ABOVE PIPE ZONE.
5. SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 220.20
o PUBLIC WORKS TYPICAL TRENCH AND BACKFILL PR D. 9/28/2018 1
ter,` DEPARTMENT GAZ
Public Works Administrator DATE
SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT. THE APPLICANT OR OWNER HEREBY REFERRED TO AS APPLICANT MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT
AND SHALL MEET THE FOLLOWING SPECIFICATIONS:
• 4 - 81NCH ROCK / 40 - 70% PASSING;
• 2-4INCH ROCK l30-40%PASSING; AND
• LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT -LOCKING LID MARKED "STORM" OR "DRAIN" SHALL BE LOCATED AT THE
PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED
TO THE CITY PRIOR TO CONSTRUCTION.
22. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV
ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
PROJECT CURBS, GUTTERS AND/OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS COMPACTED GRADED LANDSCAPED ETC. OF THE DEVELOPMENT SITE TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL
EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN
264.00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY
CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM
SYSTEM PROVIDED DURING CONSTRUCTION.
26, ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF
THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED
RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT
STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.
27. PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER
PROTECTION REGULATIONS (RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF
STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A
SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NONSKID LID PER ADA REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE
PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO
CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE
PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE
MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE,
THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE
WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING
ASTM C1781.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 267.10
,�. PUBLIC WORKS SURFACE WATER STANDARD PLAN EVbWUW§Redby:
DEPARTMENT NOTES (2 OF 2) artin Pastuch�13/zozo
mania Pa:tacha DATE
IB®SA(dhF.098D...
CENTERLINE OF DRAINAGE STRUCTURE
MAY DIFFER FROM THE CENTERLINE
OFTHE FRAME AND GRATE
TRANSITION
1'-8"MIN.
BACK EDGE OF FRAME EVEN
WITH BACK FACE OF CURB
20 318"
19"
PLAN
ROLLED INLET
1Ik .y+
S+
2", 4", 6", 12", OR 24"
ONE #3 BAR HOOP FOR 6" HEIGHT
INCREMENT (SPACED EQUALLY),
SEE NOTE 1
RECTANGULAR ADJUSTMENT SECTION
�.
Sao'
E
ti6 5
A
#3 BAR EACH CORNER
�OTR�
#3 BAR EACH SIDE
a
#3 BAR EACH WAY
PRECAST BASE SECTION
#3 BAR HOOP
#3 BAR EACH
CORNER 18" MIN.
SEE NOTE 1
ALTERNATIVE PRECAST BASE SECTION
PUBLIC WORKS
DEPARTMENT
V I
NOTES
1. Bolt down capability is required on all frames, grates, and covers,
unless specified otherwise in the contract. Provide 2 holes in the
TRANSITION frame that are vertically aligned with the grate or cover slots.
1'- 6" MIN. The frame shall accept the 304 Stainless Steel (S.S.) 5/8" (in)
- 11 NC x 2" alien head cap screw by being tapped, or other
approved mechanism. Location of bolt -down holes varies
by manufacturer.
2. Refer to Standard Specification, Section 9-05.15 and
9-05.15(2) for additional requirements.
3. For Adjustment Section Details - See Standard Plan B-30.90.
4. Size and dimensions of drains vary by Manufacturer, but open
area shall be 1.5 square feet minimum.
TRANSITION
FRONT EDGE OF FRAME 4" R
FLUSH WITH STREET/
GUTTER SURFACE
I
MATCH ROADWAY SLOPE
I
r
17"
31"
SECTION O
I\►d
REVISION
27 3/16"
25 3/4"
SECTION gO
ISOMETRIC VIEW
��N OP NASx7 f
�oA f S TE4��
�SSIONAL
Julie Heilman
2020.09.01 07:51:27-07'00'
ROLLED CURB DRAIN
STANDARD PLAN B-30.05-00
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Dioally signed by Roark, Steve
Oar Steve D,to:2020.09.0909:49:t5-or00'
STALE DESIGN ENGINEER
washing- State Department of Tronap,nation
SURVEYED: XXX
DESIGNED: SHM
DRAWN: SES
CHECKED: ,SLH/V/
BY DATE APPR APPROVED: SHM
PIPE ALLOWANCES
MAXIMUM
PIPE MATERIAL
INSIDE
DIAMETER
REINFORCED OR PLAIN
12"
CONCRETE
ALL METAL PIPE
15"
CPSSP',
STD. SPEC. 9-05.20
12"
SOLID WALL PVC,
STD. SPEC. 9-05.12(1)
15"
PROFILE WALL PVC,
STD. SPEC. 9-05.12(2)
15"
' CORRUGATED POLYETHYLENE STORM
SEWER PIPE
NOTES:
1. AS ACCEPTABLE ALTERNATIVES TO THE REBAR SHOWN
IN THE PRECAST BASE SECTION, FIBERS (PLACED IN
ACCORDANCE WITH STANDARD SPECIFICATION
9-05.50(9)), OR WIRE MESH HAVING A MINIMUM AREA OF
0.12 SQUARE INCHES PER FOOT SHALL BE USED WITH
THE MINIMUM REQUIRED REBAR SHOWN IN THE
ALTERNATIVE PRECAST BASE SECTION. WIRE MESH
SHALL NOT BE PLACED IN THE KNOCKOUTS. AS AN
ACCEPTABLE ALTERNATIVE TO THE REBAR SHOWN IN
THE RECTANGULAR ADJUSTMENT SECTION, WIRE MESH
HAVING A MINIMUM AREA OF 0.12 SQUARE INCHES PER
FOOT MAY BE USED.
2. THE KNOCKOUT DIAMETER SHALL NOT BE GREATER
THAN 20". KNOCKOUTS SHALL HAVE A WALL THICKNESS
OF 2" MINIMUM TO 2.5" MAXIMUM. PROVIDE A 1.5"
MINIMUM GAP BETWEEN THE KNOCKOUT WALL AND THE
OUTSIDE OF THE PIPE. AFTER THE PIPE IS INSTALLED,
FILL THE GAP WITH JOINT MORTAR IN ACCORDANCE WITH
STANDARD SPECIFICATION 9-04.3.
3. THE MAXIMUM DEPTH FROM THE FINISHED GRADE TO
THE LOWEST PIPE INVERT SHALL BE 5 FEET.
4. THE FRAME AND GRATE MUST BE INSTALLED WITH THE
FLANGE DOWN.
5. THE PRECAST BASE SECTION MAY HAVE A ROUNDED
FLOOR, AND THE WALLS MAY BE SLOPED AT A RATE OF
1 H:24V OR STEEPER.
6. THE OPENING SHALL BE MEASURED AT THE TOP OF THE
PRECAST BASE SECTION.
7. ALL PICKUP HOLES SHALL BE GROUTED FULL AFTER THE
INLET HAS BEEN PLACED. USE GROUT TYPE 2 FOR
NON -SHRINK APPLICATIONS IN ACCORDANCE WITH
STANDARD SPECIFICATION 9-20.3(2).
8. ALL GRADE RINGS AND CASTINGS SHALL BE SET IN
MORTAR IN ACCORDANCE WITH STANDARD
SPECIFICATION 9-04.3. THEN APPLY MORTAR TO INSIDE
AND OUTSIDE OF ALL JOINTS, RINGS, RISERS, AND
FRAMES.
9. MORTAR SHALL BE MIXED AND APPLIED PER
MANUFACTURER'S DIRECTIONS.
10. FRAME SHALL BE ADJUSTED TO PAVEMENT GRADE BY
TAPPING UNTIL FRAME IS FLUSH WITH PAVEMENT AS
DETERMINED WITH A STRAIGHT EDGE OF SUFFICIENT
LENGTH.
11. ALL MORTAR JOINTS SHALL BE TRIMMED FLUSH AND
REMAIN VISIBLE UPON COMPLETION.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 200.00
APPR ED:
CATCH BASIN TYPE 1 GqZ 9/28/2018 1
Public Works Administrator DATE
4-26-2023
SCALE:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
4" MIN.
28" MAX. 16" MAX.
FF
48", 54", 60", 72", 84",
96", 120" OR 144"
15' M I . FOR
CATCH BASIN FRAME AND VANED
GRATE PER STD. PLAN 204.00
RECTANGULAR OR CIRCULAR ADJUSTMENT
SECTION (TWO SECTIONS MAX.)
- MORTAR, (TYP.), SEE NOTE 5
FLAT SLAB TOP
SEE NOTE 6, TYP.
MAINTENANCE
STEPS OR
LADDER
12" (TYP.)
YMAX',.
1"MIN"O"RING
24"
2.5" MAFORCING
STEEL, (TYP.)
MIN. 12"aGRAVEL
BACKFILL FOR PIPE ZONE
BEDDING PER WSDOT STD.
SPECIFICATION SECTION 9-03.12(3)
6"
6"
SEPARATE 1AS1E INTEGRAL BASE
PRECAST
PRECAST WITH RISER
NOTES:
1. NO STEPS ARE REQUIRED WHEN HEIGHT IS W OR LESS.
2. THE BOTTOM OF THE PRECAST CATCH BASIN MAY BE
SLOPED TO FACILITATE CLEANING.
3. THE RECTANGULAR FRAME AND GRATE MUST BE
INSTALLED WITH THE FLANGE DOWN. THE FRAME MAY BE
CAST INTO THE ADJUSTMENT SECTION.
4. KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2"
MINIMUM TO 2.5" MAXIMUM. PROVIDE A 1.5" MINIMUM GAP
BETWEEN THE KNOCKOUT WALL AND THE OUTSIDE OF THE
PIPE. AFTER THE PIPE IS INSTALLED, FILL THE GAP WITH
JOINT MORTAR IN ACCORDANCE WITH STANDARD
SPECIFICATION 9-04.3.
5. ALL GRADE RINGS, RISERS, AND CASTINGS SHALL BE SET
IN MORTAR IN ACCORDANCE WITH STANDARD
SPECIFICATION 9-04.3.
6. WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE
CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE
ADAPTER OR APPROVED EQUAL). WHEN CONNECTING TO
AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF
THE SAME MATERIAL AS THE CONNECTING PIPE.
7. MORTAR SHALL BE MIXED AND APPLIED PER
MANUFACTURER'S DIRECTIONS.
8. FRAME SHALL BE ADJUSTED TO PAVEMENT GRADE BY
TAPPING UNTIL FRAME IS FLUSH WITH PAVEMENT AS
DETERMINED WITH A STRAIGHT EDGE OF SUFFICIENT
LENGTH.
9. ALL MORTAR JOINTS SHALL BE TRIMMED FLUSH AND
REMAIN VISIBLE UPON COMPLETION.
CATCH BASIN DIMENSIONS
CATCH BASIN
DIAMETER
MIN. WALL
THICKNESS
MIN. BASE
THICKNESS
MAXIMUM
KNOCKOUT SIZE
MINIMUM
DISTANCE
BETWEEN
KNOCKOUTS
48"
4"
6"
36"
8"
54"
4.5"
8"
42"
8"
60"
5"
8"
48"
8"
72"
6"
8"
60"
12"
84"
8"
12"
72"
12"
96"
8"
12"
MI.
12"
120"
10"
12"
96"
12"
144"
1 12"
12"
108"
12"
PIPE ALLOWANCES
CATCH BASIN
PIPE MATERIAL WITH MAXIMUM INSIDE DIAMETER
DIAMETER
CONCRETE
ALL METAL
CPSSP t
SOLID WALL
PVC 2
PROFILE WALL
PVC 3
48"
24"
30"
24"
30"
30"
54"
30"
36"
30"
36"
36"
60"
36"
42"
36"
42"
42"
72"
42„
54"
42„
48"
48"
84"
54"
60"
54"
48"
48"
96"
60"
72"
60"
48"
48"
120"
66"
84"
60"
48"
48"
144"
78"
96"
60"
48"
48"
CORRUGATED POLYETHYLENE STORM SEWER PIPE (STD. SPEC. 9-05.20)
2 STD. SPEC. 9-05.12(1)
s STD. SPEC. 9-05.12(2)
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 201.00
• PUBLIC WORKS CATCH BASIN TYPE 2 PR
'1` DEPARTMENT [62-
GAZ 9/28/2018 1
Public Works Administrator DATE
PROJECT NO. 21019
coffCIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
PLANNING
�ZDESIGN SURVEYING
12100 NE 195th St, Suite 300 Bothell, Washington 98011 425.885.7877
HORIZONTAL: NAD 1983/1991 CITY OF
RENTON
DATU M
Planning/Building/Public Works Dept.
RECORD DRAWING R-41931 1
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
UTILITY DETAILS
Nov 2021
FIELDBOOK:
PAGE:
DRAWING NO:
C4.32
SHEEr: if