Loading...
HomeMy WebLinkAboutAdden 6AMENDMENT NO. 6 TO AGREEMENT FOR CAG-20-338 THIS AMENDMENT, dated for reference purposes only as January 6, 2021, is by and between Transpo Group a Washington corporation. The City and the Consultant are referred to collectively in this Amendment executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-338, dated September 30, 2020, to provide necessary services for the Safe Routes to Transit Design Services CAG-20-338 Whereas, the Parties wish to amend the Agreement to change the scope of work, in order to provide support for grant funding applications for two project sites, as described in the Scope of Work, and change the compensation in order to complete the tasks requested to support grant funding applications. NOW THEREFORE, It is mutually agreed upon that CAG-20-338 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-6, which is attached and incorporated herein. 2. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $19,600from $164,340 to $183,940. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B-6 of the Agreement. 3.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. CAG-20-338, Adden #6-22 PAGE 2 OF 2 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Martin Pastucha Public Works Administrator Kevin Collins, PE Principal _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Maloney City Attorney Contract Template Updated 06/17/2021 N/A Approved by Cheryl Beyer via 1/28/2022 email Transpo - Renton Access to Transit Projects Scope - Amendment No. 6.docx Client Name: City of Renton Project Name: Safe Routes to Transit Program Supplement 6 Exhibit Dated: January 6, 2022 TG: 1.20204.00 Scope of Services Transpo Group USA, Inc. (Transpo) will provide supplemental services to the City of Renton (City) to support grant funding applications for the construction of projects defined and developed under the original agreement and Supplements. llowing scope. Refer to the original agreement and Supplement for project locations and project element descriptions. For Supplement 6, the projects in the original agreement identified as Project 02 and Project 04 are combined under the title The Consultant work program is supplemented with the following amended tasks: Task 11 NEPA Documentation Task 12 Federal Design Update (Optional) The Consultant has developed this scope with the assumption of modifications to the project elements identified in the Project Definition Section of the original Scope and Supplement based on the results of the changes prepared in Task 10, Grant Support to develop the Veterans Memorial Improvements as a standalone, federally grant-funded project. The Consultant assumes, for the purposes of Task 12, that the City intends on pursuing the federally funded construction of the Veterans Memorial Improvements For Task 11, the Consultant will prepare NEPA Categorial Exclusion documentation, including conducting a kickoff and follow up meetings with WSDOT on behalf of the City, with City personnel in attendance, to complete the required environmental documentation for the Veterans Memorial Improvements. The Consultant anticipates the following tasks to support the NEPA documentation: Conduct a kickoff meeting with WSDOT Local Programs and Environmental staff to notify WSDOT of the project and any preliminary environmental findings Preparation of an Area of Potential Effect map and documentation memo Preparation of a draft NEPA Categorical Exclusion, including mapping, database exhibits, and census data as attachments. Submittal of the Draft NEPA Categorical Exclusion to WSDOT Response to WSDOT comments on the Draft NEPA documentation and preparation of the Final NEPA documentation. Consultant Deliverables Area of Potential Effect memo Draft and Final NEPA Categorical Exclusion document with attachments Transpo - Renton Access to Transit Projects Scope - Amendment No. 6.docx **Task 12 is included herein, but may be suspended via written notice by the City of Renton if federal grant funding for the Veterans Memorial Improvements is not successful.** For Task 12, the Consultant will update the previously prepared construction-ready plans for the Veterans Memorial Improvements (Supplement 2, Task 8) to meet the requirements of a federally funded project, and to add elements, as requested by the City for Task 10 Grant Support (Supplement 5) and included in Revised project elements include: Additional markings and shur-curb at the southwest corner of Main Avenue S and S 3rd Street Upgrades to four existing illumination poles on the north side of Houser Way S and west side of Mill Ave S Conversion of asphalt walkway improvements on the southeast corner of Mill Ave S and Houser Way S to either an at-grade concrete walkway, or concrete curb, gutter, and sidewalk The Consultant anticipates the following tasks: Updating of previously completed (Task 8) construction-ready plan set to remove Sunset and Edmonds intersection, including revisions to cover sheet, index, included sheets and standard details, and create a standalone Veterans Memorial Improvements project sheet set Revision of the channelization plans for revised elements noted Revision of the demolition and paving plans at Houser and Mill for revised elements noted Development of illumination plans to upgrade the four existing luminaires to meet the current City standards Updating of the construction cost estimate Updating of the special provisions to reflect modified project elements and requirements for federally funded projects, in accordance with the WSDOT Local Programs checklist Coordination with WSDOT on behalf of the City of Renton, to obtain approval for the project specifications Submittal of all plans, estimate and specifications to the City of Renton as draft and one round of comment and revision prior to final submittal and signing of plans Assumptions No foundation design will be performed for the new illumination poles. Similar language requiring the contractor to obtain geotechnical No additional survey will be collected The City of Renton will provide Division 1 specifications and bid documents Consultant Deliverables Draft plans, estimate and specifications for City review and comment Final signed and sealed design plans for the Veterans Memorial Improvements Final cost estimate for the Veterans Memorial Improvements Final special provisions for the Veterans Memorial Improvements