Loading...
HomeMy WebLinkAbout0895.06 E 02222022.pdfEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 0895.06 Page 1 of 2 Report ID 0895.06 E 02222022 Date Tue 2/22/2022 Weather Overcast, 40’s Arrival/Departure Time(s) 9:15 / 10:00 3:00 / 3:20 Travel Time (hr) 1.25 Project Name Weatherly Inn Location 4500 Talbot Road S., Renton ESNW Rep. & Phone Trevor Healy | 206-468-9751 Client Info/Contact RJ Development | Duane Meyer General Contractor Info/Contact Johannsen | Brad Permit No(s). Reviewed By LAC Initials/Date SSR Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Per client request, ESNW rep arrived onsite at the Weatherly Inn development to observe and document wall subgrade excavation and slope conditions. While onsite the following was observed: Cast-In-Place Wall Excavation Observations: ESNW rep arrived onsite per request to continue observation and documentation of ongoing cast in place wall construction within the central areas of the Weatherly Inn development. Upon arrival, ESNW rep observed the contractor was onsite and continuing progressive excavation and export of spoils material. ESNW rep observed that the contractor had reached and graded the wall subgrade elevation along the eastern portion of the excavation, with near vertical slope conditions of approximately 13-14’ in height. The excavation faces consisted of suitable very dense brown/grey SP-SM cemented glacial tills, observed to be stable and unchanging in their current configuration. ESNW rep utilized a ½” diameter steel footing probe to probe the completed areas of wall subgrade and observe very dense soils conditions in the locations probed. These conditions are considered suitable for the support of the proposed cast in place wall footing. Upon return at the end of day, ESNW rep observed that the contractor was ending excavation and export for the day, and beginning to place anchored plastic sheeting coverage along the excavation cut faces. The slopes of the excavation were observed to be stable and unchanging in its current temporary configuration, however it is the responsibility of the contractor to perform all necessary safety measures in accordance with state and federal regulations. It is recommended that the contractor inform ESNW if any changes in the slope conditions occur. Please refer to the attached plan detail and photo documentation provided below. ESNW rep will return per request of the client. Report ID 0895.06 E 02222022 Page 2 of 2 Earth Solutions NW, LLC Figure 1: Plane detail of the Weatherly Inn development. Please note that locations noted above are approximate. Area of wall excavation observations Figure 2: Excavation of previous footing wall backfill and condition of excavation