Loading...
HomeMy WebLinkAboutP_KCWD90 Plan Approval Memo_20220228_v1 14432 SE Eastgate Way Suite 400 Bellevue Washington 98007 Telephone: 425.519.6500 Facsimile: 425.519.5361 DATE: August 11, 2021 TO: Yoshio L. Piediscalzi, P.E. D.R. STRONG Consulting Engineers Inc. 620 7th Avenue Kirkland, WA 98033 FROM: Craig Christensen, PE – District Engineer SUBJECT: Plan Review Comments #5 PROJECT: KCOX0W90-2003 Maple Highlands DE CC: Josh Drummond (King County Water District No. 90); Tim Johnson (King County Water District No. 90); Mary Dahl (DEA) Yoshio, Below and attached please find the redlines, listed by sheet number for clarity, for the fifth DE plan review of this project per King County Water District No. 90 (District) standards. Next Steps / Additional Items Needed 1. The District will sign the approved plans and return to you once a preconstruction meeting is set. 2. Please submit the complete civils (sewer, storm, grading and such) for District records when construction starts. 3. Bonding fees submitted 4. Insurance submitted 5. Coordination with City of Renton required before connection Please contact me at craig.christensen@deainc.com or 206-930-5191 if you require additional information or have any questions. After making these changes, please resubmit a revised PDF plan set via email with any other questions or comments. If they are approved by me then I will forward to the District for final review and approval. Thank you. Attachments/Enclosures: 5- KCOX0W90-2003-Maple Highlands DE-Plans-Approved.pdf File Path: P:\K\KCOX0W902003\0600INFO\5- KCOX0W90-2003-Maple Highlands DE-Plan Review Memo.docx