Loading...
HomeMy WebLinkAboutMFP22000197.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22000197 IVR Number: 22000197 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:01/13/2022Application Date:3344500210Parcel Number: 2301 JONES AVE NE Permit Type:03/01/2022Issue Date:Franchise Permit Work Class:03/01/2023Expiration Date:Minor Utility Job Number: 106363640Franchise Type:Natural Gas Description: PSE Gas CREW TO INSTALL NEW 1 1/8" PE GAS SERVICE AT MAIN, APPROX 15' IN ROW. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date PUGET SOUND ENERGY - GAS 106363640 CORRIE RYDBERG 253-905-5031 CORRIE.RYDBERG@PSE.COM 2301 JONES AVE NE 106363640 CREW TO INSTALL NEW 1 1/8" PE GAS SERVICE AT MAIN, APPROX 15' IN ROW. 1: 3'X5' HS CUT ANTICIPATED. PLEASE SEE ATTACHED 4 4 4 4 INFRASOURCE 253-234-6410 INFRASL871C2 BL036742 MFP22000197 Scott Warlick 3/1/2022 RESTORATION PER CITY OF RENTON STANDARDS DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 106363640 2301 JONES AVE NE Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED INFRASOURCE 425 892 0416 SARA HYACINTHE SARA.HYACINTHE@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP22000197 Scott Warlick CED 3/1/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 1800 1801 1650 2312 2306 1713 1719 1712 2408 17321726 2301 2300 1509 2219 2100 2033 2124 2115 2125 2116 2132 2209 2120 2100 2134 2202 1829 1833 2208 2216 1711 1717 1813 2217 1705 1725 2216 2300 2224 2225 1601 1607 2304 1635 2207 2115 2121 2237 2231 2225 2219 2213 2109 2103 1512 2407 2406 1904 18302400 I-405I-405I-405JONES AVE NEHIGH AVE NENE 23RD STMEAD OW AVE NNE 24TH ST JONES AVE NEunset28'S 2" MPE IP 14'S 107021639-2005 JT 2" MPE IP 265'E 107021639-2005 JT2" STW IP 14'S-N PL 69E5112" MPE IP 107030134-20072" MPE 33'E2" STW IP 14'S 6876-1964 2" STW IP 12'W 69E4802" M P E IP 51'R 1 070 2 0159 -2004 JT 2" MPE IP 14'N 107021639-2005 JT 1 1/8" MPE2012-E 1 1/8" MPE2018-E 5/8" MPE1995 5/8" MPE2010-E 5/8" PE1990 5/8" MPE1995 3/4" STW-U1966 1 1/8" MPEI2012-E 1 1/8" MPE2014-E 5/8" MPE1997 5/8" MPEI2005 1/2" STW-U19725/8" PE19881 1/8" MPE2014-E 1/2" STW-U1969 1 1/8" MPE2010-E 5/8" MPE2005 5/8" MPE2005 5/8" PE1980 5/8" MPEI2005 5/8" MPE2006 5/8" PE1972 5/8" MPEI2005 5/8" MPEI2005 5/8" MPEI2005 5/8" MPE2005 1/2" STW-U1970 5/8" MPE1995 5/8" MPE1995 3/4" STW-U1964 3/4" STW-U1965 3/4" STW-U1965 5/8" MPEI2005 5/8" MPE2001 5/8" MPE2001 5/8" MPE2001 5/8" MPE2001 5/8" MPEI2005 5/8" MPEI2008-E 5/8" MPE2002 5/8" MPE2001 5/8" MPEI2005 5/8" MPEI2005 5/8" MPEI2000 5/8" PE1990 5/8" MPE2001 5/8" MPEI2005 1 1/8" MPE2015-E TF12'WTF 14'S TF33'N 27'E30'S110'E309'S 131'N 81'E340'S 175'E444'E206'E 372'W163'E133'E123'E110'N 438'S 350'N 612'S 584'S 705'S 302'N 472'S 520'S 275'W97'W218'E196'E278'E30'S 285'E316'E140'S 55'E118'S159'E519'N 459'S 343'N 73'S 159'W 840'S 205'S 16351607 ATL12'WTL14'S T20'S 14'S 206'E74'N278'W535'S105'N845'S121'ST T T 26'W265'ET B 27'S B346'N No electric grid information availableS204080, Q204082 The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“ 12-17-2021 Scale 1:1519 Lat\Long=47.512, -122.1967 MFP22000197 Est. Start Date: & & & & & KNT FLT - Kent of CL of CL 0 Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:6" W.C.Traffic Signal:Bus Stop:No 25 No Parks #:0 Meter Loc:08 - OR Trolley Lines:No Mtr Hoods #:0 Meter:A425 Speed Limit: New Residential Svc EFV:1-1/8" - 2600 - 9996743 Police #:0 TCP:No Diameter:1-1/8" PE Flaggers #:0 Arterial:Yes Tie-In Fitting of CL Service Information Street Information Job Type of CL of CL of CL of CL of CL JONES AVE NE 3 X 5 X 3 A of CL 190'SOUTH of CL NE 24TH ST 12'WEST ROW Permit:Yes Customer:STEPHAN JURGENS 206-661-1761 Work Location Size of Cut Surface Type Job Description New Construction: Yes Construction Method All Scat / Trenchless PLAT Map:204.082 N Project Scope: INSTALL 1 1/8" PE SERVICE TO NEW ADDITION OF HOME. 15' SCAT STUB W/ 2600 EFV - 135' SCAT EXT - SET A425 MSA OUT RIGHT Steel - 1" Serv x 1/8" PE Outlet (MOP) - 125 (3/4" Cutter)9997039 Job #:106363640 Date:12/17/21 Address:2301 JONES AVE NE Puget Sound Energy Gas Pre-Inspect Form 2/15/21 PM / Inspector:SARA HYACINTHE 253-395-6342 Est. Duration:1 Day (8 Hours) Jurisdiction:RENTON City / Zip:RENTON , 98056 NEW ADDITION A425 2"stw ip 12' w 69e48060' rowjones ave neNE 24TH ST MFP22000197 RESTORATION PER CITY OF RENTON STANDARDS 2301 Jones Ave NE Renton WA 98056 USA 15 151313 1010NE 24TH ST NE 23RD STJONES AVE NESTOP FLAGGER STOP FLAGGER W20-7AW20-4ONE LANEROAD AHEAD 100'100'100'ROAD WORK AHEAD W20-1W20-7ASTOP FLAGGERW20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7A W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1 14 14 WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 190' SCL of NE 24th St @ 12' WCL of Jones Ave NE Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 12/29/2021 106363640 0 2301 Jones Ave NE, Renton, WA Kaitlynn Davis 209-456-0264 kaitlynn.davis@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP22000197