HomeMy WebLinkAboutAdmin Report
Mayor’s Office
Memorandum
DATE: February 28, 2022
TO: Ryan McIrvin, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• City Hall is open for in-person services at our Finance and Police Counters, Monday
through Wednesday, 9 a.m. to 3 p.m. Our Municipal Court counter is open Thursday
and Friday, 8:30 a.m. to 4:30 p.m., while hearings are conducted via zoom. For more
information, please visit our website.
• Renton History Museum will open its newest exhibit, With This Ring, on Wednesday,
March 2. Using objects and photos from the Museum’s collection, With This Ring
takes a historical look at marriage in Renton, from finding a partner to weddings to
working partnerships to same-sex unions. The exhibit is the product of many years
of research into Renton’s varied unions and their remarkable stories. On exhibit
from March 2, 2022 through October 19, 2022.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, February 28 through Friday, March 4, 8:00 am to 3:00 pm. Asphalt
repair in curb lane, north side of South Second Street, between Morris Ave South
and Shattuck Ave South, weather permitting.
Monday, February 28 through Friday, March 4, 8:30 am to 3:00 pm. Single
intermittent lane closures on Lind Avenue SW at NE 27th Street due to small cell
installation. Questions may be directed to Joel McCann, 425-757-9595.
Monday, February 28 through Friday, March 4, 8:30 am to 3:00 pm. Single
intermittent lane closures on Park Avenue South between N 10th Street and N
8th Street due to small cell installation. Questions may be directed to Joel
McCann, 425-757-9595.
Ryan McIrvin, Council President
Members of Renton City Council
Page 2 of 2
February 28, 2022
Windsor Hills Utility Improvements Project. Beginning in March 2022, BHC
Consultants will perform the design work for the water system and storm system
improvements in the Windsor Hill neighborhood. Survey work will be done on
weekdays from 8 a.m. to 4 p.m. and will take several weeks to complete.
Downtown Utility Improvement Project. Several roadway closures and detours
are required between now and project completion in 2022. For more
information on current upcoming road closures and traffic impacts or to sign up
for email or text alerts visit the project website at https://rentonwa.gov/duip.
Duvall Avenue Northeast Project: Continuous right lane closure on Northbound
Duvall Avenue Northeast between Northeast 7th and Northeast 10th Street
through estimated project completion in February 2023.
On-going Street Closure through October 4, 2023 (City of Renton Resolution
No. 4446). FULL STREET CLOSURE on Sunset Lane NE between NE 10th Street
and Harrington Place NE in support the Solera Development Project (LUA20-
000305). Questions may be directed to Brad Stocco, 425-282-2373.