Loading...
HomeMy WebLinkAboutR-4091092 LEVEL BOTTOM M�1 1/\\�/\//�\/// 12" MIN. \ \\ f 2' MIN. SWALE SPACING DEPENDS ON SLOPE GRADIENT NOTES: 1. CONDITIONS OF USE 1.1. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELOW. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2A. FOR SLOPES STEEPER THAN 2H:1V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAY BE USED. THE DESIRED MEASURE MUST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP. 2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. 3.2. IF THE FACILITIES DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE INCREASED. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 217.10 URI DEPARTMENT PUBLIC WORKS INTERCEPTOR SWALE PFR D GAZ 9/28/2018 1 Public Works Administrator DATE r Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) AVERAGE SLOPE SLOPE PERCENT FLOW PATH LENGTH 20H:1 V (OR LESS) 3-5 % 300 FEET (10 TO 20)H:1V 5-10 % 200 FEET (4 TO 10)H:1V 10-25% 100 FEET (2 TO 4)H:1 V 25-50 % 50 FEET C!, :45 AS -BUILT NE 1/4 SECTION 14, TOWNSHIP 23 N, RANGE 5 E, W.M. MAPLE HIGHLANDS D O o°O O o°O B oO00oO0 FLOW vY oO00oO0 _ oo��o oo�oo 0 ' PLAN DITCH CHECK DAM (TYP.) ROCK MUST COMPLETELY COVER THE BOTTOM AND SIDES OF THE DITCH 6" MIN. 24" MIN. SECTION A 2"-4" ROCK 2 a2 L L =THE DISTANCE SUCH THAT POINTS B 18" MIN. //�//�//• //�//j//��/�/// // / A AND B ARE OF EQUAL ELEVATION \Z BOTTOM OF DITCH SECTION B NOTES: 1. CONDITIONS OF USE 1.1. WHERE THERE IS CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM SEDIMENT PONDS OR TRAPS. 1.2. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT. 2. MAINTENANCE STANDARDS 2.1. ANY SEDIMENT DEPOSITION OF MORE THAN 6 INCHES SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. 2.2. THE CHECK DAMS SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS. IF SCOURING AND EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET OR NET. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 217.40 PRIPUBLIC WORKS DITCH CHECK DAMS PPR D. DEPARTMENT GAZ 9/28/2018 1 Pubic Wu,ks Admmisnz DATE NO AS —BUILT INFORMA 710N ON THIS SHEET. "l CERTIFY THAT THE INFORMATION SHOWN HEREON WHICH WAS AS —BUILT BY D.R. STRONG, AND MAY INCLUDE LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND AS —BUILT COMMENTS, ACCURATELY REFLECTS EXlS71NG FIELD COND1710NS AS DETERMINED BY ME OR UNDER MY DIRECT SUPERVISION ON THIS DATE- 2/29/2024." D.R. STRONG CONSUL TING ENGINEERS ENGINEERS PLANNERS SURVEYORS 620 - 7th AVENUE K/RKLAND, WA 98033 0425.8273063 F 425.827.2423 N FINAL 1 :45 EROSION AND SE DIMEWr CONTROL (ESC) STANDARD PLAN NOTE THE FOLLCIWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INC ORPCRATED IN THE EROSION AND SEDIM�iEMT CONTROL {ESC PLAN SET ALL THE NOTES ON THE LIST WAY NOT PERTAAN TO EVERY PROJECT THE APPLICANT OR OWNER. HEREBY REFERRED 70AfSAPPLICA147. MAY STRIKE OUT IRRELEVANT NOTES IF NOT APP4iCAKF TQ THE PR]D_r=rT. HQ+Il r=VFR, THE APP[FiQAMET SHA4 NOT R�FaI�MKFt MDR EDITTkIF, RF6WNINO FATE$ IF ApiDiT*QNAL NQTESARE NGE DEO FQA SPEQFIC ASPECTS, THEY SHALL IRE ADDIED,AFTERTHE ESC STANDARD PLAN NOTES. 1 00 ANY GUNSTRVCTmDN OR 0EVELOPMEN7 ACTWItYO IFS. A PRL-U0N5fRX11I4N MEVING SHALL BE 1ittU AMONG tHIE 017Y CIR REN70N. I-*m5Y REFERRED TO.ASTFIE CI1 '_THE APPLICAhJT, AbM THE APPLICAW SCOWT'RAC•TOR 2 THE APPLICANT LS RESPON51BLE FOROBTAIKIW5 THE WA.SENNGTON STATE QER1�RrWNT OF ECOLOGY (ECOL�F4 OGY)STRUCTIOM STORMI ATER GENERALPERMIT, IF IT II$ REQLF�RED FCR THE PF�JEQT TFIF APPLiC NT SHALL PRt)vt�E THE CITY COPIES 4F ALL A oNiTQFUF REPORTS PAQVIQF0 TO E00430Y ASS ULTED WITH THE COMSTRUG7101� STORFaIW TER GENERAL PERMIT. 3. 'THE E5C PLAN SET SHALL INCLUDE AN ESG GONLP 9TRCTBON 5EOUENCE DETAILING THE ORAERED 5TE.P5 THAT SHALL IBE FOLLOWED FROM OONSTRl1CT1OM COMIMIEN,ICEM ENT TO POST-PRChIECT CLEAHUP IN ODDER TO FULFILL PROJECT ESC REOr< RE MEATS. 4. THE BOUNDARIES OF THECLEARIN,�G LILTS, SENSITTIfEAREA,S ANO THEIR BUFFERS.aAND AREAS OF VEGETATION PRESERVATION AND TREE RETENTfON AS PRE N RWEII ON THE PLAN(S) SHALL BE d1LEA-KILT M{,INEATEO 13Y FENCIN5AND PI901ECTI`D IN If HE P*LU 3N:ACMHDANDf WITH APPENCIIX D DF THE0'ry R:ENTON SURFACE WATER DESIGN MANUAL (AEI TOE; SWDMj PRIOR TO THE START OE ISTRUCTION DuRiNGTFE CGNSTIRUCTION PGRIGD, NO DISTURBAkCE BEYOND THE CLEARING LIMITS SHALL BE VERMIITTED. THE CLEARING LIMITS SHALL BE MAJNTAIF�D BY THE APPLICANTESC SUPERVISOR FOR THE IDURhTION OF GONSTRUGTION. 5. STABILIZED CONSTRUCTION ElfrRANCES SHALL 9E INSTALLIED AT THE BEGINNING OF CONSTRUCTION AND FAAINTAMEa FOR THE DURATION OF THE PROJECT. A❑UrrIONAL ME LPRES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE RECiJHRED TO ENSURE THAT AIL PAVED AREAS ARE KEPT CLIE N AND 1 RA�CF,OuY TO MAO H113 t OF vvAY GOES. NOT DDCLIA FOR rKE uLiptAf IoN CIF rvF* PnoAcr. 1$ECIhiw 15 'LRAICI[ED OFFR r�. PU*LIC 08 SHALI- BE �i€ANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEA,TNER AS NECE€ SARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. $ W�A$HsOLPT FROM -CQ PETIE TROCKS SHALL � PERFQRWEDOFF41TE OR IN OE$IGNATE-DGGI AETE WAWQIJT APZ �LV, 00 T UVA,SH OUT CONCIRETE TRL1 S OF�TO THE MOLIND, OR TO STORM CRAJNaS OR OPEN DKTQWES. ON-SfM DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATEID NCRETE WASHOUT AREAS. F ,ALL R€DULLED E" BA PS $HA4L Qt $TAUf'TED AND mm QPE RATIQN PRiDR TD LAND CLEARINQ AN>14)R CQNSTRUUMN TQ PF1;EVEHT T�ANSPOPTATION CI= SEDIMENT TO SURFACE WATER, DRAM kAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNT1t SUCH TIME THAT CLEARING ANDOR{ONSTRUCTIOR ISCOM PiErE AND POTENTIAL FOR OWSITE EROSICM HAS PASSED. ALL ESC BMPS SHALL BE FEMKWMAFTER CONGTRuOPO + 1� 00MPLET'EL3 A10'rHE SITE HAS:DEC-m STASILCE0 TOENSuRE ParENTIAL FOR OwSiTE EROSION DOES NOT EXICT THE ImPLEMENT&TIQN. MAINTENANCE R€PLALEMENT, ENHANCEMENT, AND LREMCNAL OF ESC &LAPS SHALL BE THE RESPONSIBILITY-DF THE APPLICANT. -5 ANY HA?AROOUS MATERIALS OR LIQUID FCC UCF5 THAT HAVE THE F�OrENTIAL TO -POLLUTE NUNOrF S*fALL BE D19PO5ED OF PROPERLY. 4-4. THE ESC RMPS DEPICTED Old THIS DRAWING ARE INTEND E❑ TO BE UIUIMaUki IR€QLnRfMA NTS TOUEET ANTICAPATED SITE DONDdTIONS, AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SBkSON L ODMDITfONS IIICTATE, THE FT APPUCAWr SHALL AWNPATE THAT MORE ESC BWS WILL BE NECESSARY TO ENSURE COMRLIETI= 2510ATION CONTROL CN THE PFfi0�7SEO 6IFE bumisirz rHE COURSE OF!CON�tdqU0YI0,N. IT SHALL BE tFW= 0(�LI TION AND RE5F`ON51151L111Y OF THE APPLICANT 70 ADDRESS ANY NEW �Q%MTCNG THAT MAV BE CREATED BY THE AfTIVITIE9 AND TO PROVIDE ADDITIONAL ESC OMPS, OVER AND ABOVE MINIMUM REQUIREMENTS. AS MAY BE NEEDED. TO PROTECTADJ,ACENTPROPERTRESAND WATER QUALITYMAL OF THE REC€IANG DRAINAGE SYSTE 1� .�N� AL � THIS PLAN 1� P0k ESC I)NLY. jr DOES NOT CONSTkUlE AN APPROVAL 0P STORiA� 6A #kAi3E DE N. NOR L OK 710!kPIPES, RESrPt1 F(q, CHANNELS. ORSTORMJ6�iATER FACILITIES. 11 ANY DEYYATEVN4G SYSTEM NECESSARY FOR THE �NSTRUCT10HOF STDR1k WATER FACIDTdES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND AP43RUVAL 12. AW APEASOF EXPOSED SOILS, &CLUMNO ROADWAY EMBANKM ENT,% THAT WILL NOT BE DISTURBEGFOR TWO DAYS DLI GTHE WET SEASON �QGTOB€R 1ST THROUGH ,4PRIL.30THI OR SEVEN DAYS DURING THE DRY SEASON {MAY 1STTFWOUGH SEFTEMBER3aTHI SMALL BE IMMEDIATELY STABILIZED WrrH THE APPROVED ESC COVER METHOM (E.Cx . SEEQINEItMCi O MULCAMG. PLASTIC OOVI. ErC � IN Cf)NFORIkAWI` WITH ENOW D OF'T�* HE N N SWDMi 11 WET SEASON ESC REQUI EMEWS APPLY TO ALL CONSTRUCTION SrrES BETWEEN OCTOBER TSTAND APRIL'3DTH, UNLESS OTHERWISE ADPRO�D BY THE CITY 14 ANY AREA NEEDIN13 pM1111IONAL IES NEA45URE5. NOT REQLIIFRIhIU IMMEDIATE AT7ENT+ON, SHALL BE A0aRESSE11 WITHIN SEVEN 47) DAT5 15. 'THE ESC E4dPS CIN INACTIVE SITES SHALL BE INSPECTED AND 1WAINTAINEEt AT A.MiNtMUM OF O*CE,� MC1NTH OR WITHIN 24 HOLWS FOLLOWING A STCIFN EVENT INSPECTAON AND MARITENAFN'E SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY 1C B€FORMi E COM�M€F,�M r=NT OF ANrr' CONSTRUCTION ACTIVITY CATCH BASIN INSERTS PER THE CrTY STANOAPM PLAF+ 2i6 l)S� HALL RE PRID€OfQRALi STORM DRAIN INLETS 0CMNSLOPE AND WITHIN 500 FEET OF A OE TUBBED OP.0 STRUCTION AREA. UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONS/EYED TO A SEDIMENT P'0NP' O OR TRAP. ALL CATCH 5A5Qd INSERTS SHALL BE PERIODICALLY INSPECTED AND F3E"CED AS NECE5�A 3RY TO ENSURE FULLY FUNCTIONING NDITiON 17. AT NO TIME SHALL SEDIMENT A/CCUMULAMON EXCEED 213OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED F'WR TO PAViNo. YHE CLEAHM4 UP;ERCA'TICN SHILL NOT FLUSH 5EDIMIENT-LADEN WATER INTO THE ' N5TREAM 9YSrEM. 1.9. ANY PERM ANENT STOIaMINATER FACkUTY LOCATION USED A4SATEMPORARYSETTLING 2AS114 SHALL BE MODIFIED WITH THE NECESSARY ESC�MPSA�kND SHALL PROVIDE ADEOUAL7E STORAGE CAPAkCITY. IF THE TEMPORARY FACILITY 15 TO UtTIMAITELY FUNCTION AS AN INFILTRATION SYSTEM W ITS PERMANENT STATE, THE IEMpOl�ARY PAICCITY SHALL SE ROUIGH 13F E0$0 1HAI THE BOTTOM AND SINES �E A7 LEASt 1HREE �EE'1 AB E IHf FINAL CF E 0E 1HE PERMANENT FACILITY'. 19. AREAS DE53GNiATEO ON TW PLAN(S) CONTAINING EXISTINGSTORM�'YA,TER FACILITIES OR Off -SITE BMFS rAMENDEU SOILS. SIORERENTION, PERMEABLE RAVEMENI ETO,) SHALL BE i%EAPtLV FENCED AND MGTEOTEP USING E IBNFS TO AVOID S,EDIMEN FATION AND PAP TIOIH NPINO COWTFruGTION 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1STkALL DISTUPBED AB,€ASSHA�LL BE MNSPECTEDTO IDENTIFY WHICH ONES SHA L BE SODDED OR SEEDED ffiI PREF}ARATION FOR THE YYINT-ER FUUNS. 1115TURREDAREAS SHALL EE SODDED OR SEEDED WITHIN ONE V E15K-OF THE 16EGIMMING OF THE WET 5ER5CN AN EYflaBIT OF THD3GE AREAS TO BE SODDED QA SEEDED AND THOSE Afi�STO R€MAJN IUNOIDVERED $HALL RE4IB DMITTEDTQ THE CITY FOR REVIEWM 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STAEYLIZETTO PREVENT SEDIMENT;-4DEN WATER FROM LEAVWG THE PROJECT SITL. ALL E LAMPS SHALL BE RE MOVED. ANP Si oHmvvArER Cr, NvEYANCE S rEmS. I=ACIL I r IES. AND 41'1-SI 1 E INMG r P$ SHALL BE RESTOmE0 7HEIR I•UILy FUNCTIONNNG CONDITION. ALL DISTURBED AREAS OFTi-IE P1RO.3I£CT SITE SHALL BE v€OETATEDOR OTHERWISE PER MANEMTLYSTAIWLIZED. AT A MINIMUM DISTURBED AREAS SHALL BE SODDED OR -SEEDED QUID MULCHED TO ENSURE THATSUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING 15 ADEOUA.TE FOR AREA5 TO EVE LANDSCAPED BEFOI� OCTOBER 15F. 22. ROCKERIES ARE CONS3DERED TO BE A METHOD OF @M K STABILIZATION AND ERDSJ-DN CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN C17 ROAD RIGHT&OF-WAYSHALL BE CONSTRUCTED IN ACCCIRDANCE 4 ITTICITY STANDARDS. ROCKERIES OUTSIDE OF � RUAD I�IGHTSF-WAY SHALL ISE C I5T3 VOTEQ "'I ACCORDANCE WItH tF*E INTE�IA7�NAL BUILDING CODE AS—BUILTS COMMENTS 2.28.24 YLP 02.28.24 YLP SURVEYED: SCALE: DJ`` VERTICAL: NAVD 1988 DESIGNED: AS NOTED HORIZONTAL: NAD 1983/1991 YLP DRAWN: GLB ONE INCH DATUM CHECKED: AT FULL SCALE , v YLP IF NOT ONE INCH REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY YLP uNLESS 9MLF WiS1 NWM, -UpAYoNG 13 NOT 7.0 SL aLE ImIS) STD, PLAN - Z6$,00 PUBLIC WORKS EROSION AND SEDIMENT CONTROL PPp {D: 1)EPARTMENT STANDARE) PLAN NOTE GAZ 9/29/2018 Yr ti •c•�tixwr, I)A rL • 'R C TY OF RENTON Planning/Building/Public Works Dept. R-409109 IN COMPLIANCE WITH CITY OF RENTON STANDARDS MAPLE HIGHLANDS TESC NOTES AND DETAILS 16210 SE 134TH STREET RENTON WASHINGTON 98059 DATE: 09.05.19 PAGE: C9 I 9 41 DRS PROJECT NO. 17020 U Q J Cn z a J W J 5a L