Loading...
HomeMy WebLinkAboutR-409131V / r') z 17 0 LU -17 n Q r Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) X i X � � h X I IX 20 00 I 20+00 0-0-L. PI EC \O OF WAS;/ IF 7513� 23 ERE����\�� TONAL 813,21 lk 20+40 20+80 D.R. STRONG CONSUL TING ENGINEERS ENGINEERS PLANNERS SURVEYORS 620 - 7Ih AVENUE KIRKLAND, WA 98033 O 425.827.3063 F 425.827.2423 NE 9/4 SECTION 14, MAPL 21+20 21+60 TOWNSHIP 23 N. RANGE 5 E, W. M. PAUi78] 22+40 1 CITY COMMENTS 11.12.19 YLP 02.14.20 YLP SURVEYED: arc 2 INTAKE COMMENTS YLP 06.16.21 YLP DESIGNED: YLP 3 CITY COMMENTS 07.27.21 YLP 08.13.21 YLP DRAWN: GLB CHECKED: YLP N0. REVISION BY DATE APPR APPROVE 22+80 SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM 23+20 23+60 1� VRC TY OF RENTON VQW Planning/Building/Public Works Dept. SEWER MANHOLE NOTES: 1. SEWER MANHOLES PER COR STD PLAN 400.1 2. MANHOLE FRAME AND COVER PER COR STD PLAN 401. UTILITY CROSSING NOTE: O UTILITY CROSSING SEE UTILITY CROSSING TABLE ON SHEET C41 FOR MORE DETAILS NORTH GRAPHIC SCALE 0 10 20 40 1 INCH = 20 FT. HORIZONTAL 0 2.5 5 10 1 INCH = 5 FT VERTICAL R-409129 S-409104 M , �J H • H 00 Q J IN COMPLIANCE WITH CITY OF RENTON STANDARDS C/) 0 WASTEWATER UTILITY z Ann Fowler 09/30/2021 J 2 DEVELOPMENT ENGINEERING 0 njanders 10/01 /2021 LU J MAPLE HIGHLANDS DATE: 09.05.19 ROAD A SEWER PLAN AND PROFILE FIELDBOOK: PAGE: DRAWING 16210 SE 134TH STREET C31 RENTON, WASHINGTON 98059 SHEET 31 OF 41 DRS PROJECT NO. 17020