HomeMy WebLinkAboutSumary_Preapp_Mtg_PRE12-000083i:\rtimmons\preapps\12-083 (cd chamber of commerce, lot size, bnsf).doc
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:November 8, 2012
TO:Pre-application File No. 12-083
FROM:Rocale Timmons, Associate Planner
SUBJECT:Chamber of Commerce Short Plat (625 S 4th St)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other
design changes required by City staff or made by the applicant. The applicant is encouraged to
review all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall
or online at www.rentonwa.gov
Project Proposal: The subject property is located within the BNSF right –of-way, adjacent to
Houser Way S, between Burnett Ave S and Shattuck Ave S. The project site totals 516,594 SF
(11.86 acres) in area and is zoned Center Downtown (CD). The proposal is to short plat the
existing lot into 3 lots. Proposed Lot 1 would contain the existing Renton Chamber of
Commerce Administration Building (formerly known as the Renton Depot Building). Proposed
Lot 2 would contain the existing Rain City Catering building. Proposed Lot 3 would contain an
existing parking area. No improvements are proposed at this time. There appears to be no
critical areas on site.
Current Use: There are two existing structures on site which are proposed to remain.
Zoning: The subject property is located within the Center Downtown (CD) zoning classification.
In addition, the proposal would be subject to the Design District “A” standards and guidelines.
Development Standards
The project would be subject to RMC 4-2-120B, “Development Standards for Commercial Zoning
Designations” effective at the time of complete application (noted as “CD standards” herein).
The table below notes the current standards for the CD zone.
Chamber of Commerce
Page 2 of 4
November 7, 2012
i:\rtimmons\preapps\12-083 (cd chamber of commerce, lot size, bnsf).doc
Type of Standard Minimum Standard
Lot Standards
Lot Size None
Lot Width None
Lot Depth None
Density
Minimum/Maximum
Density
Minimum Density: 25 du/ac
Maximum Density 100 du/ac
Setbacks
Min Front Yard None
Max Front Yard 15 ft. – for buildings 25 ft. or less in height.
None – for that portion of a building over 25 ft. in height
Side Yard None
Rear Yard None, unless the CD lot abuts a residential zone, RC, R-1, R-4, R-8,
R-10, R-14, or RM-T, then there shall be a 15 ft. landscaped strip or
a 5 ft. wide sight-obscuring landscaped strip and a solid 6 ft. high
barrier used along the common boundary
Side Yard Along-A-
Street
None
Building Standards
Building Coverage
Ratio
None
Maximum Gross Floor
Area
None
Height 95 ft Maximum Building Height When a Building Is Abutting7 a Lot
Designated as Residential 20 ft. more than the maximum height
allowed in the abutting residential zone.
Parking
Vehicular –
Commercial Uses in
the CD zoning
classification
A maximum of 1/ 1,000 square feet.
Location All parking shall be provided in the rear portion of the yard, with
access taken from an alley, when available. Parking shall not be
located in the front yard, nor in a side yard facing the street nor
Chamber of Commerce
Page 3 of 4
November 7, 2012
i:\rtimmons\preapps\12-083 (cd chamber of commerce, lot size, bnsf).doc
rear yard facing the street. Parking may be located off-site or
subject to a joint parking requirement
Bicycle 10 % of the number of required parking spaces.
Landscaping
On-Site Street
Frontage
10 ft
*Except for walk and driveways. In those cases, 10' of landscaping
shall be required where buildings are not located.
Tree Retention 5 % of significant trees
Minimum Lot Size, Width and Depth – Not applicable.
Density Requirements – Not applicable.
Setbacks –The front yard setbacks of the existing structures are not proposed to be altered as
part of the short plat. No other setback requirements are applicable in this zone at this location.
Parking – The pre-application materials did not indicate the number of parking stalls within
proposed Lot 3. A parking analysis meeting the requirements in RMC 4-8-120D.12, shall be
submitted at the time of formal land use application. If the proposal provides more or less
parking than required by code, a request for a parking modification would need to be applied
for and granted. This detailed written request should be submitted by the applicant along with
the formal land use application.
Joint use of parking facilities may be authorized for those uses that have dissimilar peak-hour
demands or when it can be demonstrated that the parking facilities to be shared are
underutilized. A parking agreement ensuring that joint use parking is available for the
duration of the uses shall be approved by the Development Services Director, following review
by the City Attorney.
The proposal would be required to incorporate bicycle parking based on the number of
required spaces.
Landscaping – If more than $50,000 of improvements are made to the site the applicant would
be required to place a 10-foot landscape strip on street.
Fences – If the applicant intends to install any fences as part of this project, the location must be
designated on the landscape plan. A fence detail should also be included on the plan as well.
Building Design Standards
Compliance with Urban Design Regulations District A standards shall be required if any façade
modifications are proposed. See RMC 4-3-100. The applicant will be required to complete a
Design District Checklist (see attached).
Critical Areas
There appears to be no critical areas on site. It is the applicant’s responsibility to ascertain
whether additional critical areas are present on the site. If so, the proposal would need to be
revised accordingly.
Environmental Review
The proposal would be SEPA exempt.
Chamber of Commerce
Page 4 of 4
November 7, 2012
i:\rtimmons\preapps\12-083 (cd chamber of commerce, lot size, bnsf).doc
Permit Requirements:
The proposed subdivision would require Administrative Short Plat Approval. All land use
permits would be processed within an estimated time frame of 6-8 weeks. The Short Plat
Review application fee is $1,400. A 3% technology fee would also be assessed at the time of
land use application. Detailed information regarding the land use application submittal is
provided in the attached handouts.
A handout listing all of the City’s Development related fees in attached for your review.
Expiration: The preliminary short plat approval is valid for two years with a possible one-year
extension.
NAD_1983_HARN_StatePlane_Washington_
North_FIPS_4601
LUA12-083 Chamber of Commerce Short Plat
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
4,551
THIS MAP IS NOT TO BE USED FOR NAVIGATION
1:
Notes
None
Legend
379 0 190 379 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
10/31/2012
Jurisdiction Boundaries
Other
City of Renton
Parcels
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:November 13, 2012
TO:Rocale Timmons, Planner
FROM:Arneta Henninger, Plan Review
SUBJECT:Chamber of Commerce Short Plat
625 S. 4TH ST
PRE 12-083
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official city decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal for the northwest corner of
the intersection of S. 4th St and Smithers Ave S. in Section 18, Township 23N, Range 5E, which proposes
a to subdivide the parcel into three separate tax lots. The following comments are based on the pre-
application submittal made to the City of Renton by the applicant for a short plat.
Water
1. This site is located in the City of Renton Water service area.
2. It is located in the 196 Water Pressure Zone.
3. It is not located in the Aquifer Protection Zone.
4. There is an existing 6” CI water main located in S. 4th St. See City of Renton water drawing
W1156 for detailed plans.
5. There is an existing 12” CI water main located in Morris Ave S. See City of Renton water drawing
W0596 for detailed plans.
6. There is an existing 8” DI water main located in Houser Way S. See City of Renton water drawing
W2960 for detailed plans.
7. Separation of the existing water meter so that it only serves one lot will be required.
8. Construction of a commercial building will trigger a separate review.
9. The Renton Fire Department does not have any comments on this proposed project.
10. System Development Charges for water are based on the size of any and all water meters.
These fees are collected at the time the construction permit is issued.
Sanitary Sewer
1. There is an existing 8” sanitary sewer main located in S. 4
th St.
2. There is an existing 8”sanitary sewer in the alley east of Smithers Ave S.
Chamber of Commerce – PRE 12-083
Page 2 of 2
November 13, 2012
H:\CED\Planning\Current Planning\PREAPPS\12-083.Rocale\Plan Review Comments PRE 12-083.doc
3. There is an 8”existing sanitary sewer in the alley between Morris Ave S. and Smithers Ave S.
4. The short plat will be required to separate the dual side sewer. Installation of separate new side
sewers from the main onto each individual lot, so each lot will have its own existing sewer
service from the main onto each individual lot, is required.
5. A commercial building permit will trigger a separate review.
6. System Development Charges for sanitary sewer are based on the size of any and all domestic
water meters. These fees are collected at the time the construction permit is issued.
Storm Drainage
1. There are storm drainage facilities in Burnett Ave S., S. 4
th St, and S. 5th St.
2. A commercial building permit will trigger a separate review.
3. A conceptual drainage plan and report is required to be submitted with the formal application
for a commercial project. The project shall comply with the City of Renton Amendments to the
2009 King County Surface Water Design.
4. The project will be required to pay the Surface Water System Development Charges of $.405 per
square foot of new impervious area, but not less than $1012.00. This fee is collected prior to
the issuance of the construction permit.
Street Improvements
1. Per City of Renton code, street improvements to include curb, gutter, and sidewalk are required
to be installed prior to recording the short plat. In the downtown area, these improvements are
12’ from face of curb to the back of sidewalk (no planter).
2. Additional right-of-way will be required to be dedicated.
General Comments
1. All required utility, drainage, and street improvements will require separate plan submittals
prepared according to City of Renton drafting standards by a licensed Civil Engineer.
2. All plans shall be tied to a minimum of two of the City of Renton Horizontal and Vertical Control
Network.
3. Permit application must include an itemized cost estimate for these improvements. Half of the
fee must be paid upon application for building and construction permits, and the remainder
when the permits are issued. There will be additional fees for water service related expenses.
See Drafting Standards.
PREAPPLICATION MEETING FOR
Chamber of Commerce
625 S 4th St
PRE 12-083
CITY OF RENTON
Department of Community & Economic Development
Planning Division
November 8, 2012
Contact Information:
Planner: Rocale Timmons, 425.430.7219
Public Works Plan Reviewer: Arneta Henninger, 425.430.7298
Fire Prevention Reviewer: Corey Thomas, 425.430.7024
Building Department Reviewer: Craig Burnell, 425.430.7290
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).