Request for Release of Funds U.S. Department of Housing OMB No. 2506-0087
and Urban Development (exp. 08/31/2023)
and Certification Office of Community Planning
and Development
This form is to be used by Responsible Entities and Recipients (as defined in 24 CFR 58.2) when requesting the release of funds, and
requesting the authority to use such funds, for HUD programs identified by statutes that provide for the assumption of the environmental
review responsibility by units of general local government and States. Public reporting burden for this collection of information is estimated
to average 36 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. This agency may not conduct or sponsor, and
a person is not required to respond to, a collection of information unless that collection displays a valid OMB control number.
Part 1. Program Description and Request for Release of Funds (to be completed by Responsible Entity)
1 Program Titles) R _ _` 2. HUD/State Identification Number 1 3. Recipient Identification Number
Section 8 Project Based Vouchers JJWA0'IT
o tional�
5. Name and address of
114.871
Mark Gr, information about this request, contact name& hone number 105 of Renton
6. For infor q contact (name ho „L _ City S. Grady Way
opper, (425) 226-1850 x223 a Renton, WA 9e057
8. HUD or State Agency and office unit to receive request 7. Name and address of recipient (if different than responsible entity)
HUD Seattle Region X Office Renton Housing Authority
909.1 st Avenue, Suite 200. PO Box 2316
Seattle, WA 98104 Renton, WA 98056
The recipient(s) of assistance under the program(s) listed above requests the release of funds and removal of environmental
grant conditions governing the use of the assistance for the following
(Renton Sunset Gardens
11. Program Activity/Project Description
10. Location (Street address, city, county,
2900 NE 10th Street, Renton, Washington
:The Renton Housing Authority is proposing to develop a mixed -use building at 2900 NE
10th Street in Renton, Washington. The proposed building will be four stories and will
!contain 76 affordable housing units with approximately 13,645 square feet of ground
floor space occupied by Renton Housing Authority services staff. The existing
y 13,416-square-foot Renton Housing Authority building will be removed.
I
Previous editions are obsolete form HUD-7015.15 (1/99)
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
Part 2. Environmental Certification (to be completed by responsible entity)
With reference to the above Program Activity(ies)/Project(s), I, the undersigned officer of the responsible entity, certify that:
1. The responsible entity has fully carried out its responsibilities for environmental review, decision -making and action pertaining
to the project(s) named above.
2. The responsible entity has assumed responsibility for and complied with and will continue to comply with, the National
Environmental Policy Act of 1969, as amended, and the environmental procedures, permit requirements and statutory obligations
of the laws cited in 24 CFR 58.5; and also agrees to comply with the authorities in 24 CFR 58.6 and applicable State and local
laws.
3. The responsible entity has assumed responsibility for and complied with and will continue to comply with Section 106 of the National
Historic Preservation Act, and its implementing regulations 36 CFR 800, including consultation with the State Historic Preservation
Officer, Indian tribes and Native Hawaiian organizations, and the public.
4. After considering the type and degree of environmental effects identified by the environmental review completed for the proposed
project described in Part 1 of this request, I have found that the proposal did ❑ did not ® require the preparation and
dissemination of an environmental impact statement.
5. The responsible entity has disseminated and/or published in the manner prescribed by 24 CFR 58.43 and 58.55 a notice to the public
in accordance with 24 CFR 58.70 and as evidenced by the attached copy (copies) or evidence of posting and mailing procedure.
6. The dates for all statutory and regulatory time periods for review, comment or other action are in compliance with procedures and
requirements of 24 CFR Part 58.
7. In accordance with 24 CFR 58.71(b), the responsible entity will advise the recipient (if different from the responsible entity) of
any special environmental conditions that must be adhered to in carrying out the project.
As the duly designated certifying official of the responsible entity, I also certify that:
I am authorized to and do consent to assume the status of Federal official under the National Environmental Policy Act of 1969
and each provision of law designated in the 24 CFR 58.5 list of NEPA-related authorities insofar as the provisions of these laws
apply to the HUD responsibilities for environmental review, decision -making and action that have been assumed by the responsible
entity.
I am authorized to and do accept, on behalf of the recipient personally, the jurisdiction of the Federal courts for the enforcement
of all these responsibilities, in my capacity as certifying officer of the responsible entity.
Signature of Certifying Officer of the Responsible Entity Title of Certifying Officer
,ERC Chair, Public Works Administrator
DOCUSigned by:
ErtinaPastucha
X668131FD98B449D...
Address of Certifying Officer
Date signed _ _
p3/14/2022 2:40 PM PDT
1
Part 3. To be completed when the Recipient is not the Responsible Entity
The recipient requests the release of funds for the programs and activities identified in Part 1 and agrees to abide by the special
conditions, procedures and requirements of the environmental review and to advise the responsible entity of any proposed change in
the scope of the project or any change in environmental conditions in accordance with 24 CFR 58.71(b).
Signature of Authorized Officer of R nt Title of Authorized Officer
A h Executive Director, Renton Housing Authority
Date signed
03/09/2022
D
x
Warning: FJ6D will p�ute false claims and statements. Conviction may result in criminal and/or civil penalties. (18 U.S.C. 1001, 1010, 1012; 31 U.S.C.
3729, 380
Previous editions are obsolete form HUD-7015.15 (1/99)
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1FFFOA4CF3
JOINT NOTICES OF FINDING OF NO SIGNIFICANT IMPACT AND NOTICES
OF INTENT TO REQUEST RELEASE OF FUNDS
3/15/2022
City of Renton Planning Division
1055 S Grady Way, 6th Floor, Renton, WA 98057
Telephone Number (425) 430-7200
King County Dept. of Community and Human Services Housing, Homelessness
and Community Development Division 401 Fifth Avenue, Suite 500
Seattle, WA 98104
Telephone Number (206) 263-9105
3/15/2022
These notices shall satisfy two separate but related procedural requirements for activities to be
undertaken by the King County Department of Community and Human Services (DCHS),
HHCDD, and the City of Renton.
REQUEST FOR RELEASE OF FUNDS
On or about 3/31/2022, the King County DCHS/ HHCDD will submit a request to the
Department of Housing and Urban Development (HUD) for the release of HOME funds under
Title I I of the National Affordable Housing Act (NAHA) of 1990 as amended and for the release
of funds under Section 8 of the Housing Act of 1937, as amended Project Based Vouchers
which will be provided by HUD to the King County Housing Authority (KCHA) and the City of
Renton will submit a request to HUD for the release of funds under Section 8 of the Housing Act
of 1937, as amended, for Project Based Vouchers which will be provided by HUD to the Renton
Housing Authority (RHA) to undertake a project known as Sunset Gardens being proposed by
RHA for the purpose of providing housing to low-income seniors, the total of HUD funding is
approximately $1,340,940 The overall total cost of the project at 2900 NE 10th Street, Renton,
WA 98056 is $50,000,00.
The proposed project consists of professional services and constructions costs associated with
demolition of an existing 40-year-old, 13,416 SF building (former administrative offices of RHA)
and construction of 76 senior units in a single five story building along with construction of
ground floor administrative offices for RHA. 50% of the residents will be previously homeless
seniors.
King County and the City of Renton have completed environmental reviews of the described
project to which King County intends to award: HOME funds in the amount of $590,940.
Additional funds include: 38 Project Based VASH Vouchers from the King County Housing
Authority in the amount of approximately $380,000 annual value and $10,000 per unit and 37
Section 8 Vouchers from the Renton Housing Authority in the amount of approximately
$370,000 annual value and $10,000 per unit.
FINDING OF NO SIGNIFICANT IMPACT
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
The Environmental Review Record (ERR) documents the environmental review determinations
for the proposed project. The City of Renton and King County have determined Findings of No
Significant Impact (FONSI) on the human environment. Therefore, an Environmental Impact
Statement under the National Environmental Policy Act of 1969 (NEPA) is not required.
Additional project information is contained in the Environmental Review Record (ERR). The
ERR will be made available to the public electronically. The King County ERR can be accessed
online at the following website: https://www.kingcounty.gov/depts/community-human-
services/housing/services/community-development/cd-environmental-review.aspx The Renton
ERR can be accessed online at the following Website:
https://rentonwa.gov/cros/one.aspx?portalld=7922741 &pageld=9689817
PUBLIC COMMENTS
Any individual, group, or agency may submit written comments on the ERR to King County
Community Development Project/Program Manager Dave Mecklenburg via email at
dave.mecklenburg(a�kingcounty.gov, and Matthew Herrera, City of Renton via email at:
MHerrera(o)Rentonwa.gov. All comments received by March 30, 2022 will be considered by
HHCDD and the City of Renton prior to authorizing submission of a request for release of funds.
Comments should specify which Notice they are addressing.
ENVIRONMENTAL CERTIFICATION
HHCDD certifies to HUD that Jaclyn Moynahan in her capacity as Interim Division Director -
Housing, Homelessness and Community Development Division, and the City of Renton certifies
to HUD that the City of Renton Environmental Review Committee consent(s) to accept the
jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to
the environmental review process and that these responsibilities have been satisfied. HUD's
approval of the certification satisfies its responsibilities under NEPA and related laws and
authorities and allows the King County HHCDD, KCHA and RHA to use Program funds and
Project Based Vouchers.
OBJECTIONS TO RELEASE OF FUNDS
HUD will accept objections to its release of funds and the King County's & The City of Renton's
certification for a period of fifteen days following the anticipated submission date or its actual
receipt of the request (whichever is later) only if they are on one of the following bases: (a) the
certification was not executed by the Certifying Officer of HHCDD or City of Renton; (b) the
HHCDD or City of Renton has omitted a step or failed to make a decision or finding required by
HUD regulations at 24 CFR part 58; (c) the grant recipient or other participants in the
development process have committed funds, incurred costs or undertaken activities not
authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another
Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the
project is unsatisfactory from the standpoint of environmental quality. Objections must be
prepared and submitted in accordance with the'required procedures (24 CFR Part 58, Sec.
58.76) and shall be addressed to HUD Region X Community Planning and Development (CPD)
office at SEACPDRROF(a)hud.gov regarding HOME funds and the HUD Seattle Office of Public
Housing at Seattlepublichousing(a)-hud.gov for comments related for Project Based Voucher
funds. Potential objectors should contact HUD via email to verify the actual last day of the
objection period.
Environmental Review Committee — City of Renton
Jaclyn Moynahan — Interim Director— King County Housing, Homelessness and Community
Development Division
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
PPZMENTOF
oG IIIIII� Q�14.
9e,N DENE��
U.S. Department of Housing and Urban Development
451 Seventh Street, SW
Washington, DC 20410
www.hud.gov
espanol.hud.gov
Environmental Assessment
Determinations and Compliance Findings for HUD -assisted Projects
24 CFR Part 58
Proiect Information
Project Name: Renton Sunset Gardens
Responsible Entity: City of Renton
Grant Recipient (if different than Responsible Entity): Renton Housing Authority
State/Local Identifier: Washington
Preparer: Alyssa Johnson, Chloe Gore, Amy Maule and Steven Quarterman; Landau
Associates, Inc.
Certifying Officer Name and Title: Martin Pastucha, chair of the Environmental Review
Committee
Grant Recipient (if different than Responsible Entity): Renton Housing Authority
Consultant (if applicable): Landau Associates, Inc.
Direct Comments to:
Matt Herrera, AICP
Current Planning Manager
Department of Community & Economic Development
City of Renton
1055 South Grady Way
Renton, WA 98057
MHerreraARentonwa.gov
(425) 430-6593
March 10, 2022 Page 1 of 15
DocuSign Envelope ID: 81)B92C85-6390-4496-13773-BA1 FFFOA4CF3
Environmental Assessment: Renton Sunset Gardens
Project Location:
2900 NE IOth Street, Renton, Washington
Description of the Proposed Project [24 CFR 50.12 & 58.32; 40 CFR 1508.25]:
DRAFT
The Renton Housing Authority is proposing to develop a mixed -use building at 2900 NE 10t1i
Street in Renton, Washington (project). The proposed building will be four stories and will
contain 76 affordable housing units with approximately 13,645 square feet of ground floor space
occupied by Renton Housing Authority services staff. The existing 13,416-square-foot Renton
Housing Authority building will be removed.
Statement of Purpose and Need for the Proposal [40 CFR 1508.9(b)]:
The project purpose is to provide affordable housing and improve Renton Housing Authority
administration office space within the Sunset Area of the City. The project will provide 76
affordable housing units, and the community service facility space will be used to provide
services to residents of Sunset Gardens, as well as other community residents. These services,
including rental administration assistance, low-income housing management and development,
and resident services, are expected to improve the quality of life for community residents. Sunset
Gardens is a component of the Sunset Area, which was subject to planned action that includes
redevelopment to meet changing community needs and market demand. The Sunset Area was
developed as publicly funded housing to support workers in defense -related industries during
World War II and grew to include multi -family housing, schools, shopping areas, and civic
buildings. For several decades, the Sunset Area was a stable neighborhood, but over time
homeownership declined, housing maintenance was deferred, and social support systems
decreased. Revitalization plans were initiated by the City of Renton starting in 2006, and are
ongoing.
Existing Conditions and Trends [24 CFR 58.40(a)]:
The project site is existing Renton Housing Authority administration offices within the Sunset
Area Planned Action area. As detailed in the 2011 Sunset Area Community Planned Action
Environmental Impact Statement, redevelopment in the 269-acre Planned Action Study Area
would occur over a 20-year period. Public service infrastructure investments in the Planned
Action Study Area include: planned or anticipated upgrades to NE Sunset Boulevard and other
local streets, stormwater drainage systems, neighborhood parks and recreation facilities, and
neighborhood community facilities.
Funding Information
Grant No.
HUD Program
Funding Amount
14.871
HUD-VASH
$380,000 / year
14.871
HUD -Section 8
$370,000 / year
March 10, 2022 Page 2 of 15
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
M-21-DC-53-0200 I HOME 2021 $590,940
Estimated Total HUD Funded Amount:
$590,940 (HOME) + $750,000 annual funding
Estimated Total Project Cost (HUD and non -HUD funds) [24 CFR 58.32(d)]:
$50,000,000
Compliance with 24 CFR 50.4, 58.5, and 58.6 Laws and Authorities
Record below the compliance or conformance determinations for each statute, executive order,
or regulation. Provide credible, traceable, and supportive source documentation for each
authority. Where applicable, complete the necessary reviews or consultations and obtain or note
applicable permits of approvals. Clearly note citations, dates/names/titles of contacts, and page
references. Attach additional documentation as appropriate.
Are Formal
Compliance Factors:
Compliance
Statutes, Executive Orders,
Steps or
and Regulations listed at 24
Mitigation
CFR §58.5 and §58.6
Required?
Compliance Determinations
STATUTES, EXECUTIVE ORDERS,
AND REGULATIONS
LISTED AT 24 CFR 50.4
and 58.6
Airport Hazards
Yes No
The site is not within 2,500 feet of a civil
24 CFR Part 51 Subpart D
❑ ®
airport or 15,000 feet of a military airport.
Refer to Appendix A.
Coastal Barrier Resources
Yes No
Washington is not a state within units of the
Coastal Barrier Resources Act,
❑ ®
Coastal Barrier Resources System. Refer to
as amended by the Coastal
Appendix B.
Barrier Improvement Act of
1990 [16 USC 3501 ]
Flood Insurance
Yes No
The site is not within a mapped floodplain,
Flood Disaster Protection Act
❑ ®
nor are there abutting waterbodies. Refer to
of 1973 and National Flood
Appendix C.
Insurance Reform Act of 1994
[42 USC 4001-4128 and 42
USC 5154a]
STATUTES, EXECUTIVE ORDERS, AND REGULATIONS LISTED AT 24 CFR 50.4
& 58.5
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1FFFOA4CF3
Clean Air
Yes No
The project is located within the Seattle -
Clean Air Act, as amended,
®
Tacoma maintenance area for carbon
particularly Sections 176(c) &
monoxide (CO) and ozone (0), both of
(d); 40 CFR Parts 6, 51, 93
which ended in 2016. The project is not
located within any other currently active
non -attainment or maintenance status
districts. Refer to Appendix D.
Coastal Zone Management Yes No The project does not require state review at
Coastal Zone Management ❑ ® this stage. Concurrence from Ecology for
Act, sections 307(c) & (d) Coastal Zone Management (CZM) is no
longer required under a Part 58 or Part 50
Environmental Review in Washington State.
However, at the time of project
development, the activity may trigger review
if it falls under other parts of the Coastal
Zone Management Act regulations for
federal agency activities (Title 15 CFR Part
930, Subpart C), or consistency for activities
requiring a federal license or permit (Title 15
CFR Part 930, Subpart D) and will be
subject to all enforceable policies of the
CZM Program. It is during the local
permitting process that a project might be
subject to CZM and further review by
Ecology. Refer to Appendix E.
Contamination and Toxic
Substances
24 CFR Part 50.3(i) &
58.5(i)(2)
Yes No A Phase I Environmental Site Assessment
® (ESA) completed in September 2019 did not
identify onsite or nearby toxic, hazardous, or
radioactive substances that could affect the
health and safety of project occupants or
conflict with the intended use of the
property.
As required prior to any beginning any
building renovation or demolition activity, a
Hazardous Building Materials Survey
(HBMS) of the office building slated for
demolition was completed in September
2021. The survey found asbestos -containing
flooring mastic and mercury -containing
fluorescent lamps. No evidence of lead was
found in paint coatings, and no evidence of
polychlorinated biphenyls was observed in
light fixture ballasts. Recommended
measures and applicable laws will be
followed during demolition to identify,
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
remove, and dispose of known and
previously unknown hazardous building
materials. While asbestos- and mercury -
containing materials are commonly
encountered building components, they are
considered non -scope items during the Phase
I ESA review process and would not
represent "contamination," per se, of the
project site. Refer to Appendix F.
Endangered Species
Yes No
The project satisfies the US Fish & Wildlife
Endangered Species Act of
❑ ®
Service Table A no effect determination
1973, particularly Section 7;
criteria. NMFS has provided verification that
50 CFR Part 402
the project complies with HUD
Programmatic Biological Opinion. Refer to
Appendix G.
Explosive and Flammable
Yes No
The project location is beyond the required
Hazards
❑ ®
separation distance from all tanks covered by
24 CFR Part 51 Subpart C
24 CFR 51C. Refer to Appendix H.
Farmlands Protection
Yes No
The site is in Renton's city limits in a
Farmland Protection Policy
❑ ®
designated urban growth area under
Act of 1981, particularly
Washington's Growth Management Act. The
Sections 1504(b) and 1541; 7
site is developed. There are no agricultural
CFR Part 658
uses on site. Refer to Appendix 1.
Floodplain Management
Yes No
The project is located in an area of minimal
Executive Order 11988,
❑ ®
flood hazard (i.e., outside of floodplain). See
particularly Section 2(a); 24
Appendix I
CFR Part 55
Historic Preservation
Yes No
Consultation has been completed with the
National Historic Preservation
❑ ®
Department of Archaeology and Historic
Act of 1966, particularly
Preservation (DAHP) and affected Tribes.
Sections 106 and 110; 36 CFR
DAHP has concurred with determination of
Part 800
no historic properties affected. No responses
were received from the Tribes. Refer to
Appendix K.
Noise Abatement and
Yes No
The outdoor day/night noise level at the
Control
❑ ®
project site was calculated to be 65 decibels,
Noise Control Act of 1972, as
which is below the "acceptable" noise limit.
amended by the Quiet
No noise abatement is required. Refer to
Communities Act of 1978; 24
Appendix L.
CFR Part 51 Subpart B
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1FFFOA4CF3
Sole Source Aquifers
Yes No
The project is located within the Cedar
Safe Drinking Water Act of
❑ ®
Valley Aquifer Sole Source Aquifer, but
1974, as amended, particularly
consists of new construction of a multi -use
Section 1424(e); 40 CFR Part
building that meets all applicable local/state
149
groundwater regulations and is served by
public water and sewer. Stormwater plans
include infiltration biofilter planting and
onsite Filterra® system. Covenants will be in
place that prohibit the use of leachable
metals in building materials, and require
inspection, maintenance, and best
management practices of drainage facilities.
No injection wells will be used. Refer to
Appendix M.
Wetlands Protection
Yes No
The site is developed and no wetlands are
Executive Order 11990,
❑ ®
documented on site on National Wetlands
particularly Sections 2 and 5
Inventory mapping. Refer to Appendix N.
Wild and Scenic Rivers
Yes No
The nearest wild and scenic river is 20 miles
Wild and Scenic Rivers Act of
❑ ®
from the project location. Refer to
1968, particularly Sections
Appendix O.
7(b) and (c)
ENVIRONMENTAL JUSTICE
Environmental Justice
Yes No
The site is designated for low-income
Executive Order 12898
❑ ®
households and Renton Housing Authority
administration offices. The residential units
will provide quality living environments. No
adverse environmental impacts have been
identified. Refer to Appendix P.
Environmental Assessment Factors [24 CFR 58.40; Reff, 40 CFR 1508.8 &1548.27]. Recorded
below are the qualitative and quantitative significance of the effects of the proposal on the
character, features and resources of the project area. Each factor has been evaluated and
documented, as appropriate and in proportion to its relevance to the proposed action. Verifiable
source documentation has been provided and described in support of each determination, as
appropriate. Credible, traceable, and supportive source documentation for each authority has
been provided. Where applicable, the necessary reviews or consultations have been completed
and applicable permits of approvals have been obtained or noted. Citations, dates/names/titles of
contacts, and page references are clear. Additional documentation is attached, as appropriate.
All conditions, attenuation, or mitigation measures have been clearly identified.
Impact Codes: Use an impact code from the following list to make the determination of impact
for each factor.
(1) Minor beneficial impact
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1FFFOA4CF3
(2) No impact anticipated
(3) Minor Adverse Impact — May require mitigation
(4) Significant or -potentially significant impact requiring avoidance or modification, which may
require an Environmental Impact Statement
Environmental
Impact
Assessment Factor
Code
Impact Evaluation
LAND DEVELOPMENT
Conformance with
1
This high -density residential development is compatible
Plans / Compatible
with the purpose of the Center Village Zone in which it is
Land Use and
located, which is "to provide an opportunity for
Zoning / Scale and
concentrated mixed -use residential and commercial
Urban Design
redevelopment designed to urban rather than suburban
development standards that supports transit -oriented
development and pedestrian activity" and allow
"complementary, high -density residential development."
Refer to Appendix Q.
Soil Suitability/
2
A geotechnical report was developed for the project site
Slope / Erosion /
by Otto Rosenau & Associates, Inc. (ORA) in October
Drainage / Storm
2021. ORA's infiltration testing confirmed that the
Water Runoff
proposed infiltration facilities are feasible to treat surface
water for the proposed building. ORA also presented
recommendations to ensure soil suitability is maintained
during construction and associated with the completed
project. Recommendations in the geotechnical report will
be followed in project construction plans. Refer to
Appendix R.
Hazards and
2
No hazards or nuisances will result from this project.
Nuisances including
Construction will be conducted in compliance with all
Site Safety and
relevant requirements for safety and noise regulations.
Noise
Energy
2
The proposed project will be provided electricity. The
Consumption
completed facility will be weatherized/insulated and will
include energy -efficient lighting and appliances where
practicable.
VEnvironmental Impact
Assessment Factor Code Impact Evaluation
SOCIOECONOMIC
Employment and 1 This project will provide affordable housing and maintain
Income Patterns office space for use by the Renton Housing Authority. The
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1FFFOA4CF3
proposed project will support residents who are in a lower
income category. The project will provide some
employment opportunities during construction and after
completion.
Demographic 1 The project is located in a developed urban area near
Character Changes, businesses. The project would not displace any current
Displacement residents and conforms to applicable zoning. This project
will provide affordable housing, which will assist residents
who face higher likelihood of displacement from rising
costs to remain in the city; and will maintain office use by
the Renton Housing Authority.
Environmental
Impact
Assessment Factor
Code
Impact Evaluation
COMMUNITY FACILITIES AND SERVICES
Educational and
2
Because the proposed project will increase residential
Cultural Facilities
housing capacity, a demand for educational and cultural
services and facilities may be associated with residents.
However, services provided by educational facilities will not
e adversely affected due to the size of the project and its
conformance with zoning requirements, and it is expected
that the incremental increase in demand can be met by the
existing capacity.
Commercial
1
Yhe site is located close to commercial facilities, and new
Facilities
residents may have a small, but positive, impact on local
commercial businesses.
Health Care and
2
Because the proposed project may increase residential
Social Services
population slightly, a demand for health care and social
services and facilities may increase. However, it is expected
that the incremental increase in demand can be met by
existing capacity.
Solid Waste
2
The site has onsite garbage pickup and is in conformance
Disposal / Recycling
with applicable zoning. Solid waste services will not be
adversely affected. Waste created by construction and by the
completed project will be hauled off site and disposed of at
permitted facilities. Because the proposed project may
slightly increase residential population, a demand for
recycling services and facilities may be associated with
rogram participants. However, recycling services will not
e adversely affected due to the size of the project and its
conformance with zoning requirements, and it is expected
that the incremental increase in demand can be met by the
existing capacity.
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
Waste Water /
2
ccess to municipal waste water/sanitary sewer service will
Sanitary Sewers
be provided to the proposed project. Waste water/sanitary
ewer services will not be adversely affected because the
project is in conformance with existing zoning, and it is
expected that the incremental increase in demand will be
et by the existing system capacity.
Water Supply
2
Access to City water supply will be provided to the
proposed project. Water supply will not be adversely
affected as the project is in conformance with existing
zoning, and it is expected that water needs at the site will be
et by the existing water supply capacity.
Public Safety —
2
A demand for public safety services, including police, fire,
Police, Fire and
and emergency medical services, may increase slightly with
Emergency Medical
his project increasing housing supply. However, public
safety services will not be adversely affected due to the size
f the project and its conformance with zoning
requirements, and it is expected that the incremental
increase in demand can be met by the existing capacity.
Parks, Open Space
2
The proposed project may slightly increase demand on local
and Recreation
parks and open space, and it is expected that the incremental
increase in demand can be met by the existing capacity. The
project provides a plaza for passive recreation/open space.
Transportation and
2
The project area is served by several King County Metro
Accessibility
bus routes within walking distance. The closest stop is
Route 111 at NE 10t' Street & Index Avenue NE,
approximately 80 feet from the project site.
Residents/employees using the completed project may use
public transit and it is expected that the incremental increase
in demand can be met by the existing capacity. No adverse
impact to transit or other transportation networks is
nticipated. The project is on land that was already
developed, so the project will not affect public access to
neighboring facilities, businesses, or service facilities.
Therefore, the project will have no adverse effects to
ccessibility.
Environmental
Assessment Factor
Impact
Code
Impact Evaluation
NATURAL FEATURES
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
Unique Natural
2
The proposed project is located in an urban setting and
Features,
there are no unique natural features or agricultural lands in
Water Resources
the project vicinity. The proposed project will not
discharge or draw from any groundwater. No surface
waters occur in the project area, and stormwater runoff
ill be managed as necessary to avoid adverse impact to
urface waters. Covenants will be in place that prohibit use
f leachable metals in building materials, and require
inspection, maintenance, and best management practices
f drainage facilities. Therefore, no adverse effects on
atural features or water resources are anticipated.
Vegetation, Wildlife
2
The proposed project is located within a developed urban
corridor. Seven significant trees are set to be removed on
he site, but new landscaped areas are planned around the
perimeter of the building and in the open plaza, including
new tree plantings in all planned landscape areas.
Other Factors
2
None identified.
Additional Studies Performed:
EMG. 2019. Phase I Environmental Site Assessment, Proposed Sunset Gardens, 2900 NE 1 Oth
Street, Renton, Washington 98056. EMG Corporation. September 6.
KPFF. 2021. Renton Sunset Gardens Technical Information Report, Civil Construction Permit.
KPFF Consulting Engineers. October.
PBS. 2021. Hazardous Materials Survey Report, Sunset Gardens Commercial Office Building.
PBS Engineering and Environmental Inc. September 9.
Transportation Solutions, Inc. 2020. Trip Generation and Project Scoping, Sunset Gardens.
December 17.
Transportation Solutions, Inc. 2021. Sunset Gardens Traffic Impact Analysis. April.
ORA. 2021. Geotechnical Engineering Report, Proposed Affordable Housing Development,
Sunset Gardens, 2900 NE l Oth Street, Renton, Washington. Otto Rosenau & Associates, Inc.
October 18.
Field Inspection (Date and completed by):
EMG Corporation, August 28, 2019
Otto Rosenau & Associates, Inc., August 27, 2020
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
List of Sources, Agencies and Persons Consulted [40 CFR 1508.9(b)]:
AirportIQ 5010. 2022. https://www.aiMortig50lO.com/501OWeb/. Accessed January 28, 2022.
Barnard Dunkelberg & Company. King County International Airport FAR Part 150, Boeing
Field/King County International Noise Contour Map.
httys://kingcounty.gov/—/media/services/airport/documents/Vart- I 50/bfi-part-1 50-complete-
04.ashx?la7--en. 2002.
Barnes Sr., Chris. Transportations Operations Manager for City of Renton. "RE: Sunset Blvd and
10"' Street Traffic Data." Email correspondence to Amy Maule at Landau Associates. January
10, 2022.
City of Auburn/Century West. 2015. Auburn Airport Master Plan. https://centurywest.com/wp-
content/uploads/2018/08/Part-2a-Auburn-AMP-final-report di ital-sm12df/. May.
City of Renton. 2021. Environmental Review Committee Memo.
City of Renton. 2022. City of Renton COR Maps: Land Use and Zoning.
https://maps.rentonwa.gov/Html5viewer/Index.html?viewer=cormapss. Accessed January 20,
2022.
City of Renton. 2021. Declaration of Covenant Prohibiting Use of Leachable Metals, Renton
Housing Authority. December 12.
City of Renton. 2021. Declaration of Covenant For Inspection and Maintenance of Drainage
Facilities and On -Site BMPs, Renton Housing Authority. October 19.
City of Renton. Renton Municipal Airport Noise Contour Map.
https://rentonwa.gov/city hall/public works/renton municipal airport/master plan/. 2018.
City of Renton. 2010. Sunset Area Community Planned Action, Environmental Impact
Statement, Volume 1. December.
Ecology website. 2021. "What's in My Neighborhood" app.
https://Wps.ecology.wa.gov/neighborhood/. Washington State Department of Ecology. Accessed
January 3, 2022.
Ecology. 2019. Tacoma Smelter Plume Model Remedies Guidance. Washington State
Department of Ecology. July.
EMG. 2019. Phase I Environmental Site Assessment, Proposed Sunset Gardens, 2900 NE 101
Street, Renton, Washington 98056. EMG Corporation. September 6.
FAA. 2013. Port of Seattle — Sea-Tac International Airport Noise Contour Map.
hops://www.faa.aov/airports/environmental/airport noise/noise exposure maps/. December 13.
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1FFFOA4CF3
FEMA Flood Map Service Center. https://msc.fema.gov/portal/home. Federal Emergency
Management Agency. Accessed December 24, 2021.
Google, Inc. Google Earth Pro. Accessed January 7, 2022.
HUD. 2020. Acceptable Separation Distance Electronic Assessment Tool.
https•//www hudexchange.info/programs/environmental-review/asd-calculator/. US Department
of Housing and Urban Development. Accessed January 7, 2022.
HUD. 2022. HUD Day/Night Noise Level Calculator.
https•//www.hudexchange.info/environmental-review/dnl-calculator/. US Department of
Housing and Urban Development. Accessed January 7, 2022.
KPFF. 2021. Renton Sunset Gardens Road & Paving Plan, 2900 NE 1 Oth St. Renton,
Washington. KPFF Consulting Engineers. October 19.
National Wild and Scenic Rivers System. https://www.rivers. og v/map.php. Accessed December
24, 2021.
NEPAssist Website: https://ngpassisttool.0a. og v/nepassist/nepamap.aspx Accessed January 7,
2022.
Renton Housing Authority website. "Redevelopment."
https://www.rentonhousing.org-/redevelgpment-1. Accessed January 13, 2022.
SMR Architects/Fazio Associates, Inc. 2021. Groundplane Landscape Plan. October 19.
HUD Environmental Guidance website.
https://www.hud.gov/states/shared/working/rI0/environment. US Department of Housing and
Urban Development. Accessed July 22, 2021.
USFWS. Wetlands Mapper. https://www.fws.gov/wetlands/data/mapper.html. US Fish &
Wildlife Service. Accessed December 24, 2021.
Ecology. https•//ecology wa og v/Regulations-Permits/Plans-policies/State-implementation-
plans/Maintenance-SIPS. Washington State Department of Ecology. Accessed January 4, 2022.
List of Permits Obtained:
Planned Action Approval, City of Renton Environmental Review Committee
Public Outreach [24 CFR 50.23 & 58.43]:
The following meeting was held:
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
Event
Public Hearing
Date
August 17, 2021
Location
Zoom
Participants
Public Meeting
Cumulative Impact Analysis [24 CFR 58.32]:
The proposed project will not cause any adverse environmental impacts and will not result in a
significant impact on the quality of the environment.
Alternatives [24 CFR 58.40(e); 40 CFR 1508.9]:
An initial site plan was conceptualized to determine the feasibility of the project for the funding
application. Subsequent site plans were developed as a result of an iterative design process
between the project's experts, project partners, and community to accurately assess and
determine the needs of the community. The project sought design input from the public and the
City of Renton. The site plan has been refined based on the community feedback, and
modifications may occur until the final site plan is complete and approved for permitting.
No Action Alternative [24 CFR 58.40(e)]:
If no action is taken at the site, the parcel would continue to be used as offices for City of Renton
Housing Authority or eventually redeveloped with commercial businesses or other uses
compatible with current zoning. There would continue to be a demand for affordable housing in
this area in the absence of the proposed project.
Summary of Findings and Conclusions:
The proposed project will not cause any adverse environmental impacts and will not result in a
significant impact on the quality of the environment. The project will provide affordable housing
that is needed in the community.
MitiLation Measures and Conditions [40 CFR 1505.2(c)]
Summarize below all mitigation measures adopted by the Responsible Entity to reduce, avoid, or
eliminate adverse environmental impacts and to avoid non-compliance or non-conformance with
the above -listed authorities and factors. These measures/conditions must be incorporated into
project contracts, development agreements, and other relevant documents. The staff responsible
for implementing and monitoring mitigation measures should be clearly identified in the
mitigation plan.
Law, Authority, or Factor Mitigation Measure
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
Soil Suitability/ Slope/ Erosion/
Drainage/ Storm Water Runoff
Implementing geotechnical engineering
recommendations.
Contamination and Toxic
Substances
Recommended measures and applicable laws will be
followed during demolition in identifying, removing,
and disposing of known and previously unknown
hazardous building materials.
DocuSign Envelope ID: 8DB92C85-6390-4496-B773-BA1 FFFOA4CF3
Determination:
® Finding of No Significant Impact [24 CFR 58.40(g)(1); 40 CFR 1508.27]
The project will not result in a significant impact on the quality of the human environment.
❑ Finding of Significant Impact [24 CFR 58.40(g)(2); 40 CFR 1508.27]
The project may significantly affect the quality of the human environment.
Preparer Signature:
Ih
DocuSigned by:
Matt Herrera
3E6107AB1 FC0424...
Name/Title/Organization:
Date: 3/14/2022 1 2:40 PM PDT
City of Renton Environmental Review Committee (ERC)
DocuSigned by:
Date:3/14/2022 1 2:40 PM PDT Martin Pastucha
Signature. BBS131FDM"9D...
Chair
DocuSigned by:
E'Anjela Barton
Signature. C4DOD9BD92A64AO...
DocuSigned by:
E(Chip Vincent
Signature:4O D B 37 7706 AO477...
uSigned by:
C�elly Beyrner
SignatureC1 E23C7044F7...
This original, signed document and related supporting material must be retained on file by the
Responsible Entity in an Environmental Review Record (ERR) for the activity/project (ref: 24
CFR Part 58.38) and in accordance with recordkeeping requirements for the HUD program(s).