HomeMy WebLinkAboutWetlands-Partner-Worksheet.pdfOMB No. 2506-0177
(exp.9/30/2021)
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
WASHINGTON, DC 20410-1000
This Worksheet was designed to be used by those “Partners” (including Public Housing Authorities, consultants,
contractors, and nonprofits) who assist Responsible Entities and HUD in preparing environmental reviews, but legally
cannot take full responsibilities for these reviews themselves. Responsible Entities and HUD should use the RE/HUD
version of the Worksheet.
Wetlands (CEST and EA) – Partner
https://www.hudexchange.info/environmental-review/wetlands-protection
1. Does this project involve new construction as defined in Executive Order 11990, expansion of a
building’s footprint, or ground disturbance?
The term "new construction" includes draining, dredging, channelizing, filling, diking, impounding,
and related activities and construction of any structures or facilities.
☐ No → If the RE/HUD agrees with this recommendation, the review is in compliance with
this section. Continue to the Worksheet Summary below.
☒ Yes → Continue to Question 2.
2. Will the new construction or other ground disturbance impact a wetland as defined in E.O.
11990?
☒ No → If the RE/HUD agrees with this recommendation, the review is in compliance with
this section. Continue to the Worksheet Summary below. Provide a map or any other
relevant documentation to explain your determination.
☐ Yes → Work with HUD or the RE to assist with the 8-Step Process. Continue to Question 3.
3. Does Section 55.12 state that the 8-Step Process is not required?
☐ No, the 8-Step Process applies.
This project will require mitigation and may require elevating structure or structures. See the
link to the HUD Exchange above for information on HUD’s elevation requirements.
→ Work with the RE/HUD to assist with the 8-Step Process. Continue to Worksheet Summary.
☐ 5-Step Process is applicable per 55.12(a).
Provide the applicable citation at 24 CFR 55.12(a) here.
Click here to enter text.
→ Work with the RE/HUD to assist with the 5-Step Process. This project may require mitigation
or alternations. Continue to Worksheet Summary.
☐ 8-Step Process is inapplicable per 55.12(b).
Provide the applicable citation at 24 CFR 55.12(b) here.
Click here to enter text.
→ If the RE/HUD agrees with this recommendation, the review is in compliance with this
section. Continue to Worksheet Summary.
☐ 8-Step Process is inapplicable per 55.12(c).
Provide the applicable citation at 24 CFR 55.12(c) here.
Click here to enter text.
→ If the RE/HUD agrees with this recommendation, the review is in compliance with this
section. Continue to Worksheet Summary.
Worksheet Summary
Provide a full description of your determination and a synopsis of the information that it was based on,
such as:
• Map panel numbers and dates
• Names of all consulted parties and relevant consultation dates
• Names of plans or reports and relevant page numbers
• Any additional requirements specific to your program or region
Include all documentation supporting your findings in your submission to HUD.
The proposed project includes replacement of fill and sod in existing landscaped areas and regrade
below perimeter fencing; however, US Fish and Wildlife Service (USFWS) National Wetlands Inventory
mapping shows that the project does not overlap any wetland areas.
Reference:
USFWS. Wetlands Mapper. https://www.fws.gov/wetlands/data/mapper.html. Accessed December 24,
2021.