Loading...
HomeMy WebLinkAboutPlan Review PRE12-053 comments DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M   DATE: June 29, 2012     TO: Gerald Wasser, Planner     FROM: Kayren Kittrick, Development Engineering Supervisor     SUBJECT: Atkinson Dock 3401 Lake Washington Blvd PRE12-053      NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and may be subject to modification and/or concurrence by official city decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal for (project info here). The following comments are based on the pre-application submittal made to the City of Renton by the applicant. Water If the project is going to provide water service to the dock, an appropriate back flow device will be required. Sanitary Sewer There is an existing shallow 8-inch diameter sanitary sewer line in the water at this location. Locate and mark carefully. No post, piling or footing shall be installed directly on or above the sanitary sewer.