HomeMy WebLinkAboutItem 9 - Construction MitMead Short Plat NE 5th Place / Ilwaco Place NE 8 Single Family Residence CONSTRUCTION MITIGATION Proposed Construction Dates (begin and end dates): Start of construction is proposed for the summer of 2016 with clearing and grading of the property and installation of utilities/frontage improvements along abutting streets. Project is proposed to be completed by winter 2016. Hours and days of operation: 7:30 am to 3:30 pm, Monday through Friday or as otherwise allowed by City of Renton. Proposed Hauling/ Transportation routes: Materials and labor to the site are proposed off of NE 5th Street using the existing gravel parking area on the property. Construction parking and material storage will occur on the NE 5th Street side of the project (south). Proposed additional materials to the project (such as backfill, gravel base, pipe, bedding, etc.) will be hauled to the site using the access off of NE 5th Street. Haul routes to the site will be from Hoquiam Avenue NE. Measures to minimize construction activities: The construction activities proposed are to provide the necessary public and private improvements for the project. In an effort to minimize disruption of the public, frontage improvements of half-street widening is necessary along three sides of the property. These improvements can be made from the property side of the frontage. This will allow for construction to occur and minimizing disturbance of the existing roadway. Temporary closures of the frontage streets may be necessary to make utility crossings. Special hours: No special hours are necessary to complete construction. Weekend work may be necessary to complete the project on schedule; this will be determined by owner, contractor, and City of Renton. Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be necessary to minimize disruption to traffic around the property for water main connections and curb, gutter, and sidewalk installation. Once a contractor is selected, a traffic control plan will be submitted and approved prior to the pre-construction meeting with the City of Renton. This plan will be implemented prior to any construction activities.