HomeMy WebLinkAbout10-Zen Garden traffic mitigation PlanZen Garden-Renton Restaurant Addition Project Construction Mitigation Description Proposed Construction Dates: Construction will start upon approval of construction plans fall of 2016. Hours of Operation for Commercial Construction Site: Per City of Renton: Monday – Friday: 7am – 8pm Saturday: 9am – 8pm Sunday: None Proposed Hauling/Transportation Routes: All equipment materials and laborers will enter the site off 108 Ave. SE. A detailed haul route will be provided by the contractor selected to construct the improvements. It is anticipated that the haul route would be via I-405 to Exit 3 from. Follow I-405 S to Talbot Rd S in Renton. Take Benson Dr S to 108th Ave SE in Cascade-Fairwood. Measures to be implemented to minimize dust, traffic and transportation impacts, mud, noise, and other noxious characteristics Dust: Best management practices will be used to minimize dust on the construction site. Water trucks or metered fire hoses will be used as needed to wet down the areas used by construction equipment. Traffic: During road and building construction, the traffic entering and leaving the site will consist of subcontractors and deliveries. When arriving for work, the subcontractors will be travelling opposite the majority of traffic leaving the Neighborhood, and materials are primarily delivered at off peak hours during the day. None of these operations are anticipated to have a significant impact on the peak or non-peak hour traffic in the area. Any special hours proposed for construction or hauling There are no special hours proposed for construction or hauling without prior approval from the City of Renton. Preliminary Traffic Control Plan General access to the property will be from 108 Ave SE. It is anticipated that the existing roadway will remain open during construction and access to the properties along 108 Ave. SE will be maintained. Traffic Control is anticipated to consist of occasional single lane closures along 108 Ave. SE.