Loading...
HomeMy WebLinkAboutRenton Land Use response letter-f Atlas Group LLC. Phone: (206) 488-3688 Email:gengtan@gmail.com LAND USE REVIEW COMMENTS RESPNSES: LUA16-000230,ECF,SA-A Application Date: April 5, 2016 Name: Restaurant Addition to Mcdonalds Land Use Permit Review: 1. The submitted documents do not provide sufficient information to complete a thorough review of the project. The civil plans and technical information Report (TIR)shall follow all requirements as outlined in Section 2 of the City of Renton Amendments to the 2009 King County Stormwater Design manual. IN order to review the land use application submittal, the following minimum items will be required: See Civil Response letter. 2. A modification of street frontage improvement must be requested for right-of-way improvements that do not match city standards. See Civil Response letter. 3. The trash enclosure is located within the 15-foot setback and will need to be relocated. Response: Site plan has been revised to relocate trach enclosure outside of the 15-foot setback zone, see sheet A1.1.