HomeMy WebLinkAboutShoreline Tracking Worksheet - 1 - 09/23
C:\Users\Rob\Dropbox\Projects\Joos_Paul Dock 2016\Documents\Permits\City Forms\Shoreline Tracking Worksheet.docx
City of Renton Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
The City of Renton is required by the Washington State Department of Ecology to track and evaluate the
effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with
respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline
Master Program report every eight years to comply with the Shoreline Management Act requirements.
SHORELINE STABILIZATION
1. Is there currently a bulkhead on your site? Yes No; If yes, fill out table below.
If no, see “Site Conditions”, Section 2 below.
What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard
Materials:
Rock and concrete 128’ (+/-)
Linear Feet of Soft
Materials:
Examples of Types of Bulkheads: Hard (e.g. rocks, wood; Soft (e.g. sand, plants);
Combination-soft materials at the water with hard materials furtherer inland, or a
combination of hard and soft materials at the water.
SITE CONDITIONS
2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g.
2,000 sq. ft. house, 125 sq. ft. greenhouse).
1,790 square feet.
3. List distance (in feet) from the water to the closest point of each structure. List each
building separately (e.g. shed, dock, carport).
The house is approximately 79 feet away from the water (+/-)
4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area,
walkway, patio).
SHORELINE TRACKING
WORKSHEET
- 2 - 09/23
C:\Users\Rob\Dropbox\Projects\Joos_Paul Dock 2016\Documents\Permits\City Forms\Shoreline Tracking Worksheet.docx
House: 1,790 square feet.
Driveway: 2078 square feet (+/-)
(No formal impervious surface assessment has been performed. Information obtained from a
survey, field measurements, and King County Parcel Viewer. We are not surveyors and cannot
guarantee a great level of accuracy.)
5. List distance (in feet) from the water to the closest point of each impervious surface (hard
surface.
House: 79 feet (+/-)
Driveway: 117 (+/-)
6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in
square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care
or grown for decorative purposes) should not be counted.
The site contains small non-native shrubs and grasses in the nearshore area. The site also
has invasive Himalayan Blackberry and English Holly which will be removed in the project
area.
7. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in
square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care
or grown for decorative purposes) should not be counted.
The applicant is proposing a native mitigation planting plan for this project. Please see
mitigation planting plan page of the plan set for more details.
8. Will the project require any added fill? If so, how many cubic yards will be added:
The proposed project include the installation of fifty cubic yards of 2” minus spawning
gravel as mitigation ( 1½” minus gravel may be substituted if 2” minus is not obtainable).
IN WATER AND OVER WATER STRUCTURES
- 3 - 09/23
C:\Users\Rob\Dropbox\Projects\Joos_Paul Dock 2016\Documents\Permits\City Forms\Shoreline Tracking Worksheet.docx
9. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring
piles, boatlifts)? Yes No; If yes, fill out the table below.
Describe the in and over water structures on your site
Type
(e.g. dock, float, bridge,
mooring pile, boat lift, etc.)
Surface Area
(in square feet, if
applicable)
Light Penetrating Materials
(the percentage of the
surface area that is made of
material that allows light to
reach the water)
Existing
structures
to remain
Bulkhead
Approximately 128
linear feet (+/-)
N/A
Existing
structures
that will
be
removed
Rock and concrete portions
of the existing bulkhead
will be removed after
shoreline stabilization
occurs behind the OHWL.
Please see plans for more
details.
Proposed
structures
The proposed project
entails the construction of
a pier, two mooring piles,
the installation of a
freestanding boatlift, and a
freestanding platform lift.
Dock: 951 Square
feet
Platform lift 80
square feet
Dock and platform lift will be
completely grated with Thru-
Flow plastic grated decking.