Loading...
HomeMy WebLinkAboutShoreline Tracking Worksheet - 1 - 09/23 C:\Users\Rob\Dropbox\Projects\Joos_Paul Dock 2016\Documents\Permits\City Forms\Shoreline Tracking Worksheet.docx City of Renton Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site?  Yes  No; If yes, fill out table below. If no, see “Site Conditions”, Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: Rock and concrete 128’ (+/-) Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood; Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials furtherer inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). 1,790 square feet. 3. List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). The house is approximately 79 feet away from the water (+/-) 4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). SHORELINE TRACKING WORKSHEET - 2 - 09/23 C:\Users\Rob\Dropbox\Projects\Joos_Paul Dock 2016\Documents\Permits\City Forms\Shoreline Tracking Worksheet.docx House: 1,790 square feet. Driveway: 2078 square feet (+/-) (No formal impervious surface assessment has been performed. Information obtained from a survey, field measurements, and King County Parcel Viewer. We are not surveyors and cannot guarantee a great level of accuracy.) 5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface. House: 79 feet (+/-) Driveway: 117 (+/-) 6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. The site contains small non-native shrubs and grasses in the nearshore area. The site also has invasive Himalayan Blackberry and English Holly which will be removed in the project area. 7. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. The applicant is proposing a native mitigation planting plan for this project. Please see mitigation planting plan page of the plan set for more details. 8. Will the project require any added fill? If so, how many cubic yards will be added: The proposed project include the installation of fifty cubic yards of 2” minus spawning gravel as mitigation ( 1½” minus gravel may be substituted if 2” minus is not obtainable). IN WATER AND OVER WATER STRUCTURES - 3 - 09/23 C:\Users\Rob\Dropbox\Projects\Joos_Paul Dock 2016\Documents\Permits\City Forms\Shoreline Tracking Worksheet.docx 9. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)?  Yes  No; If yes, fill out the table below. Describe the in and over water structures on your site Type (e.g. dock, float, bridge, mooring pile, boat lift, etc.) Surface Area (in square feet, if applicable) Light Penetrating Materials (the percentage of the surface area that is made of material that allows light to reach the water) Existing structures to remain Bulkhead Approximately 128 linear feet (+/-) N/A Existing structures that will be removed Rock and concrete portions of the existing bulkhead will be removed after shoreline stabilization occurs behind the OHWL. Please see plans for more details. Proposed structures The proposed project entails the construction of a pier, two mooring piles, the installation of a freestanding boatlift, and a freestanding platform lift. Dock: 951 Square feet Platform lift 80 square feet Dock and platform lift will be completely grated with Thru- Flow plastic grated decking.