Loading...
HomeMy WebLinkAboutItem 5 - Project Narrative_2160084Page 1 of 2 TO:Jill Ding, City of Renton DATE:April 20, 2016 FROM:PROJECT NO.:2160084.30Brad Medrud, AICP PROJECT NAME:Maplewood Heights ES Portable Classrooms CUP SUBJECT:Project Narrative for Conditional Use Permit The Renton School District is proposing to add two double classroom portables to the existing Maplewood Heights Elementary School located at 130 Jericho Avenue Northeast in Renton, Washington before the start of the 2016 – 2017 school year. Maplewood Heights Elementary School is located on King County parcel number 084710-0090, which is 8.67 acres in size. The current zoning designation of the site is Residential 4 (R-4). All surrounding properties are also zoned R-4. The proposed double classroom portables will add additional instructional space and not change the existing elementary school use of the site. Each of the double classroom portables will be 1,792 square feet in size and a single story, approximately 14 ½ feet in height. One double classroom portable classroom will be located on a grassed area immediately west of the existing four double classroom portables on the site and one double classroom portable classroom will be located on a grassed area immediately east of the existing four double classroom portables. Paved paths will connect the new portable classrooms to the existing school. The portable classrooms will include metal stairs and ramps for access. The portable classrooms will be provided with electricity, but not water or sewer service, and they will not be fire sprinklered or used for science labs, art studios, or other instructional uses that would require running water. In the Certificate of Water Availability from King County Water District 90, the available rate of fire flow for the portable is in excess of 1,500 gallons per minute (gpm). Per the 2012 IBC, the Type of Construction will be VB and the Occupancy Classification will be Classification Group E. The estimated project value of the proposal is $400,000. This project will not remove or add parking stalls on the site. The current vehicular ingress and egress points and internal traffic movement on the site, including emergency vehicle access, will not change because of this proposal. No off-site improvements will be required because of this proposal. No existing trees will be removed because of the placement of the portable or associated site work. There are no critical areas identified in the project area and the project site area is not within 100 feet of any streams or wetlands. It is estimated that a net of 118 cubic yards of fill will be required for preparing pads for the double classroom portables. Site soils have been classified as medium dense to very dense Vashon lodgement till, overlain in places by fill. For detailed information regarding soils and drainage conditions, please refer to the Technical Information Report prepared by AHBL, Inc. in association with this proposal. This proposal requires land use approval of a Conditional Use Permit (CUP) with the City in order to allow us subsequently to prepare and file the construction applications with the City for the portables. Our proposal exceeds the limit in Note 9 of the Renton Municipal Code (RMC) 4.2-060 Zoning Use Table, which allows up to four portable classroom buildings to be placed on a school site. If the number of portables exceeds four, the City requires approval of a CUP through the Hearing Examiner before the City will approve the construction documents to place the portable classrooms on the site. The new SEPA exemption levels adopted by the State of Washington in 2012 established the SEPA categorical exemption threshold for construction of a school as being less than 4,000 square feet of gross floor area, and with associated parking facilities designed for 20 or fewer automobiles (WAC 197-11-800(1)(b)(iv)). In RMC 4-9- 070(G), the City of Renton has not adopted the higher categorical exemption levels available under the 2012 SEPA rules changes. Based on our understanding of the project and the District’s SEPA requirements and exemption levels, we anticipate that this project will not require full SEPA review with the District as lead agency. A SEPA Exemption Letter has been prepared in association with this proposal. Project Memo Page 2 of 2 Maplewood Heights ES Portable Classrooms CUP 2160084.30 April 20, 2016 If you have any questions regarding this project, please contact me at (253) 383-2422. \\ahbl.com\data\Projects\2016\2160084\30_PLN\Deliverables_By_Date\Conditional Use Permit\Item 5 - 20160420 Project Narrative_2160084.docx