Loading...
HomeMy WebLinkAboutItem 8 - Construction Mitigation Description_2160084/     TO: Jill Ding, City of Renton DATE: April 20, 2016  FROM: Brad Medrud, AICP PROJECT NO.: 2160084.30    PROJECT NAME: Maplewood Heights ES Portable Classrooms CUP     SUBJECT: Construction Mitigation Description       Construction is expected to commence in the spring of 2016 and be complete by end of summer 2016. Construction operations will occur during days and hours that comply with City of Renton requirements. We do not expect any operations to occur during weekends or special hours. Hauling routes will be developed by the General Contractor, once contracted, and will be reviewed and approved by the City of Renton prior to the start of construction. Temporary, short-term noise impacts typical of construction projects will occur with the operation of equipment during construction. Noise impacts associated with construction phases of the project will be limited in duration. Mitigation for general noise impacts during the construction phases will include measures such as using and regularly maintaining efficient mufflers and quieting devices on all construction equipment and vehicles will be taken. Construction activities at the site could stir up dust particles Construction vehicles and equipment could be a potential source of exhaust emissions. Watering the around as needed before and during clearing and grading activities will control dust particles. Vehicles that are not being used in construction activities will be shut off. The scope of this project does not include work within the right-of-way of any public ways. No impacts to local traffic are expected, thus we do not expect a traffic control plan will be required. If you have any questions regarding this project, please contact me at (253) 383-2422. Q:\2016\2160084\30_PLN\Deliverables_By_Date\Conditional Use Permit\Item 9 - 20160420_Construction Mitigation Description_2160084.docx