Loading...
HomeMy WebLinkAboutItem 19 - Rpt (TIR) 2160085.10 (combined) Civil Engineers ● Structural Engineers ● Landscape Architects ● Community Planners ● Land Surveyors ● Neighbors Technical Information Report PREPARED FOR: Greene-Gasaway Architects, PLLC PO Box 4158 Federal Way, WA 98063-4158 PROJECT: Maplewood Heights Elementary School Portables 130 Jericho Avenue NE Renton, WA 98059 2160084.10 PREPARED BY: Anne M. Turpin, PE Project Engineer REVIEWED BY: William J. Fierst, PE Project Manager Sean M. Comfort, PE Principal DATE: April 2016 Technical Information Report PREPARED FOR: Greene-Gasaway Architects, PLLC PO Box 4158 Federal Way, WA 98063-4158 PROJECT: Maplewood Heights Elementary School Portables 130 Jericho Avenue NE Renton, WA 98059 2160084.10 PREPARED BY: Anne M. Turpin, PE Project Engineer REVIEWED BY: William J. Fierst, PE Project Manager Sean M. Comfort, PE Principal DATE: April 2016 I hereby state that this Technical Information Report for Maplewood Heights Elementary School Portables has been prepared by me or under my supervision, and meets the standard of care and expertise that is usual and customary in this community for professional engineers. I understand that City of Renton does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities prepared by me. Technical Information Report Maplewood Heights Elementary School Portables 2160084.10 Table of Contents Section Page 1.0 Project Overview ............................................................................................................................ 1 2.0 Conditions and Requirements Summary .................................................................................... 2 2.1 CR 1 - Discharge at the Natural Location ........................................................................... 2 2.2 CR 2 - Offsite Analysis ........................................................................................................ 3 2.3 CR 3 - Flow Control............................................................................................................. 3 2.4 CR 4 - Conveyance System ................................................................................................ 4 2.5 CR 5 - Erosion and Sediment Control ................................................................................. 4 2.6 CR 6 - Maintenance and Operations .................................................................................. 5 2.7 CR 7 - Financial Guarantees and Liability .......................................................................... 5 2.8 CR 8 - Water Quality ........................................................................................................... 5 2.9 SR 1 - Other Adopted Requirements .................................................................................. 5 2.10 SR 2 - Flood Hazard Delineation ........................................................................................ 5 2.11 SR 3 - Flood Protection Facilities ........................................................................................ 5 2.12 SR 4 - Source Control ......................................................................................................... 5 2.13 SR 5 - Oil Control ................................................................................................................ 5 2.14 SR 6 – Aquifer Protection Area ........................................................................................... 5 3.0 Offsite Analysis .............................................................................................................................. 6 3.1 Task 1 – Study Area Definition and Maps........................................................................... 6 3.2 Task 2 – Resource Review ................................................................................................. 7 3.3 Task 3 – Field Inspection .................................................................................................... 7 3.4 Task 4 – Drainage System Description and Problem Descriptions .................................... 9 4.0 Flow Control and Water Quality Facility Analysis and Design.................................................. 9 5.0 Conveyance System Analysis and Design ................................................................................ 10 6.0 Special Reports and Studies ...................................................................................................... 10 7.0 Other Permits ............................................................................................................................... 10 8.0 Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design ....... 10 9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant ..................................... 11 10.0 Operations and Maintenance Manual ........................................................................................ 11 11.0 Conclusion .................................................................................................................................... 11 Technical Information Report Maplewood Heights Elementary School Portables 2160084.10 Appendices Appendix A Technical Information Report (TIR) Worksheet Exhibits A-1 ............. Vicinity Map A-2 ............. Geotechnical Report A-3 ............. Existing Conditions Map A-4 ............. Site Plan A-5 ............. Existing Basin Map A-6 ............. Developed Basin Map A-7 ............. Conveyance Calculations A-8 ............. FIRM Rate Map A-9 ............. Operations and Maintenance Manual A-10 ........... City of Renton Bond Quantities Worksheet A-11 ........... The City of Renton COR Map Technical Information Report Maplewood Heights Elementary School Portables 1 2160084.10 1.0 Project Overview Maplewood Heights Elementary School is located at 130 Jericho Avenue NE on Parcel No. 0847100090, Renton, Washington. See Appendix A-1 for a Vicinity Map. The project site area is 8.67 acres, with 4.20 acres of existing impervious coverage. The 2016 portable classroom project proposes to install two double portable classrooms, ramps, stairs, and landings at Maplewood Heights Elementary School. See Appendix A-3 for the Existing Conditions Map and Appendix A-4 for the Site Plan. This would result in 3,584 square feet (SF) of impervious surface from the two portables (160 replaced and 3,424 new). In addition, the project results in 2,379 SF new impervious surface from the walk, landings, mow curbs, and trench areas. This results in a total of 6,123 SF of new plus replaced impervious surfaces. The site will realize a net increase of 5,963 SF of impervious surfaces. See Appendices A-5 and A-6 for Existing and Developed Basin Maps. The project size is larger than the threshold basin areas contributing to the proposed gravel trenches because some work will occur in the areas contributing to the exiting gravel trenches. Table 1: Project Land Cover Areas Aimp (AC) Aperv (AC) Total (AC) Existing 0.01 0.25 0.26 Proposed 0.15 0.11 0.26 Table 2: Threshold Basin Land Cover Areas Aimp (AC) Aperv (AC) Total (AC) Existing 0.01 0.18 0.19 Proposed 0.14 0.05 0.19 Table 3: Project Area Contributing to the Existing Trench System Aimp (AC) Aperv (AC) Total (AC) Existing 0.00 0.07 0.07 Proposed 0.01 0.06 0.07 Table 4: Threshold Basin Areas Breakdown Description (acres typ.) Onsite (AC) Onsite (SF) Total Basin Area 0.19 8,349 Existing Impervious 0.01 160 Existing Pervious 0.18 8,189 Proposed Impervious 0.14 6,123 (Proposed Buildings: Two at 1,792 SF each) 0.08 3,584 (Proposed paving and ramps) 0.06 2,539 Proposed Pervious 0.05 2,104 Amount of New Impervious 0.13 5,963 Amount of Replaced Impervious 0.01 160 Amount of New Plus Replaced Impervious 0.14 6,123 Technical Information Report Maplewood Heights Elementary School Portables 2 2160084.10 The 2009 King County Surface Water Design Manual (KCSWDM) and City of Renton Amendments to the King County Surface Water Design Manual (February 2010) establish the methodology and design criteria used for the project. The Rational Method was used to determine conveyance capacities. 2.0 Conditions and Requirements Summary The project triggers Full Drainage Review because it results in more than 7,000 square feet of land disturbing activity and over 2,000 square feet of new and/or replaced impervious surface. Below is a summary of how the proposed project will meet the Core Requirements. Core Requirements (CR) 2.1 CR 1 - Discharge at the Natural Location There are two separate natural discharge locations for the project area. The natural discharge location of stormwater for the western portable project area is the grass field south of the existing portables. Stormwater flows southwest across the field to SE 2nd Place and is conveyed west along the north curb flow line of SE 2nd Place. Stormwater then enters a catch basin located southwest of the project site on SE 2nd Place. Stormwater is then conveyed in an 8-inch pipe to a catch basin at the northeast corner of the intersection of SE 2nd Place and Jericho Avenue SE. Stormwater is then conveyed through an 18-inch concrete pipe through a series of catch basins west along SE 2nd Place, up to a storm manhole adjacent to the intersection of SE 2nd Place and Hoquiam Avenue SE. Stormwater is then conveyed to the south in a 48-inch pipe and outfalls to Maplewood Creek. The natural discharge location of stormwater for the eastern portable project area is the grass field south of the existing portables. Stormwater flows southeast across the field to SE 2nd Place and is conveyed east along the north curb flow line of SE 2nd Place until it enters the City system through a catch basin. The downstream pipe running east along SE 2nd Place is a 12-inch pipe that continues east for approximately 280 feet, until it reaches a catch basin (Facility ID No. 131933) located on the western flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 32 LF east through a 12-inch pipe to a catch basin (Facility ID No. 131934) located on the eastern flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 14 LF southeast through a 12-inch pipe to a catch basin (Facility ID No. 132309) located in the Lyons Avenue NE eastern right-of-way. The runoff then continues approximately 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of Parcel No. 6669030160. The runoff then continues another 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of Parcel No. 6669030120. Here, the runoff is directed north in a 12-inch pipe for approximately 100 feet to a manhole located in the southern flow line of SE 2nd Court (Facility ID No. 131935). The runoff then continues approximately 60 feet northeast through a 12-inch pipe to a manhole (Facility ID No. 131936). The runoff then continues approximately 45 feet east through a 12-inch pipe, where it outfalls at the City of Renton Detention Pond located at the end of SE 2nd Court. After passing through the detention pond control structure, runoff is directed southeast in an 18-inch pipe for approximately 60 feet to an outfall located in the Maplewood Neighborhood Park, a forested area. Stormwater roof runoff from the proposed portables will be discharged from the roof with downspouts, and will flow through a series of proposed catch basins and cleanouts prior to discharging to a gravel-filled trench for flow control. A minimum of approximately 80 feet of grass-vegetated flow path segment is provided upon discharge from a gravel-filled trench, and thus exceeds the 25-foot minimum requirement specified per KCSWDM C2.4.4. Roof and site runoff will flow overland and discharge at the natural location, and thus will not adversely affect downstream properties or drainage systems. Technical Information Report Maplewood Heights Elementary School Portables 3 2160084.10 2.2 CR 2 - Offsite Analysis AHBL staff performed a Level One Downstream Analysis for the project on April 9, 2016. The analysis included:  Defining and mapping the study area.  Reviewing available information on the study area.  Field inspecting the study area.  Analyzing the existing drainage system, including its existing and predicted problems, if any. Please refer to Section 3.0 for the full offsite analysis. 2.3 CR 3 - Flow Control Full dispersion of roof runoff was evaluated. Per Appendix C.2.1.1 of the KCSWDM, a native, vegetated, flow path segment of at least 100 feet in length must be available along the flow path that runoff would follow upon discharge from a dispersion device. A native, vegetated, flow path of 100 feet is not available onsite. Therefore, full dispersion is not feasible. Full infiltration of roof runoff was evaluated. Based on the infiltration assessment by Associated Earth Sciences, Inc. (found in Exhibit A-2, pg. 2), the soils are described as medium dense to very dense Vashon lodgement till. The glacial till soils are not recommended for infiltration due to the very dense and fine-grained nature. Therefore, full infiltration is not feasible. Based on Figure C.1.3.A of the KCSWDM, one or more of the following Best Management Practices (BMPs) must be implemented for target impervious surface not addressed with full dispersion or with full infiltration of roof runoff: 1. Full Infiltration – As described in the geotechnical report, the site soils do not allow for sufficient infiltration; therefore, full infiltration is not feasible. Please see Exhibit A-2. 2. Limited Infiltration – As described in the geotechnical report, the site soils do not allow for sufficient infiltration; therefore, limited infiltration is not feasible. Please see Exhibit A-2. 3. Basic Dispersion – a. Splash Blocks – Per KCSWDM C2.4.2, splash blocks require a 50-foot vegetated flow path between the dispersion device and any downstream impervious surface or drainage feature. The proposed asphalt walks range from 0 to 13 feet away from the building; therefore, splash blocks are not feasible. b. Rock Pads – Per KCSWDM C2.4.3, rock pads require a 50-foot vegetated flow path between the dispersion device and any downstream impervious surface or drainage feature. The proposed asphalt walks range from 0 to 13 feet away from the building; therefore, splash blocks are not feasible. Technical Information Report Maplewood Heights Elementary School Portables 4 2160084.10 c. Gravel-Filled Trenches – The project proposes two gravel-filled trenches. The gravel-filled trenches are described in the next paragraph. Based on the pre-application meeting with AHBL and Jan Illian of City of Renton on March 31, 2016, dispersion was determined to be an acceptable flow control measure for this project. d. Sheet Flow – Per KCSWDM C2.4.5, sheet flow is not used for roof downspouts; therefore, sheet flow is not feasible. Two gravel-filled trenches are proposed for this project. A summary of the area tributary to each gravel-filled trench is shown below: Impervious (SF) Pervious (SF) Impervious Equivalent [I+P*(700/5000)] (SF) Length (FT) Gravel-Filled Trench 1 2,867 715 2,967 42 Gravel-Filled Trench 2 3,416 1,389 3,610 52 Section C.2.4.4 of the KCSWDM states that the gravel trench size shall be designed at a ratio of 10 feet of trench per 700 SF impervious (or 5,000 SF pervious) tributary to the trench. Therefore, the length of each gravel-filled trench was determined by calculating the impervious equivalent tributary area to the gravel-filled trench. See Exhibit A-6 for the location of each gravel-filled trench. A minimum of approximately 80 feet of grass-vegetated flow path segment is provided upon discharge for each gravel trench, and thus exceeds the 25-foot minimum requirement. 2.4 CR 4 - Conveyance System The two new double portable classrooms will include downspouts that tie into roof drain systems prior to entering proposed catch basins and gravel-filled trenches onsite. Based on Section 1.2.4.1 of the KCSWDM, new pipe systems shall be designed with sufficient capacity to convey and contain the 25-year peak flow, with a minimum of 6 inches of freeboard between the design water surface and structure grate. In addition, runoff from the 100-year peak storm event cannot create or aggravate a severe flooding problem or severe erosion problem. The new pipe system has sufficient capacity for a 25-year peak flow. Catch basin rims do not overtop in the 100-year peak storm event, and there is more than 6 inches of freeboard between the design water surface and structure grate during the 25-year peak storm event. No severe flooding problems or severe erosion problems are created or aggravated in the 100-year storm event. See Appendix A-7 for the conveyance basin and calculations. 2.5 CR 5 - Erosion and Sediment Control Onsite land disturbance will consist of clearing the work site (approximately 11,000 SF), small amounts of demolition, and regrading for placement of four catch basins, five area drains, and two gravel-filled trenches. Erosion and sediment control will be provided with the use of temporary and permanent seeding within the work limits, silt fence or wattles, and inlet sediment protection. A Temporary Erosion and Sedimentation Control Plan is included in the plan set. See Section 8.0 for Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Designs. Technical Information Report Maplewood Heights Elementary School Portables 5 2160084.10 2.6 CR 6 - Maintenance and Operations Maintenance and operations of all drainage facilities will be maintained by the owner. The project proposes new area drains and catch basins onsite. See Appendix A-9 for the Operations and Maintenance Manual. 2.7 CR 7 - Financial Guarantees and Liability This project will provide financial guarantees and liability per City of Renton requirements. See Appendix A-10 for the City of Renton Bond Quantities Worksheet. 2.8 CR 8 - Water Quality No pollution generating surfaces are proposed as part of this development; therefore, the development meets the Surface Area Exemption. CR 8 will not apply. Special Requirements (SR) 2.9 SR 1 - Other Adopted Requirements The project is included in the Lower Cedar River Drainage Basin. City and County basin requirements will be followed where applicable. 2.10 SR 2 - Flood Hazard Delineation The proposed project is not in or adjacent to the 100-year floodplain. See Appendix A-8 for the FIRM Rate Map. 2.11 SR 3 - Flood Protection Facilities This project does not rely on existing flood protection facilities, nor will it modify or construct new flood protection facilities. 2.12 SR 4 - Source Control The proposed project is an educational facility; therefore, it does not fit the definition of a commercial, industrial, or multi-family site for source control purposes. 2.13 SR 5 - Oil Control The site does not meet high use criteria and is not subject to oil control measures. 2.14 SR 6 – Aquifer Protection Area The project is not located within an aquifer protection zone. See Appendix A-11 for City of Renton COR Map Districts and Development Conditions. Technical Information Report Maplewood Heights Elementary School Portables 6 2160084.10 3.0 Offsite Analysis There are no upstream tributary areas contributing drainage to the basin area. 3.1 Task 1 – Study Area Definition and Maps Maplewood Heights Elementary School proposes to place two new portable buildings on the 8.67-acre site located at 130 Jericho Avenue SE in Renton, Washington. AHBL staff visited the site on April 9, 2016. The project site lies within the Lower Cedar River Drainage Basin, as delineated by the King County Water Features Map. Wetland signage was observed south of SE 2nd Place adjacent to Maple Creek. The existing project site consists of four double classroom portables, four portable ramps, associated asphalt walks, a storage container, and grassed area with a dispersal trench. The project site basin receives no upstream stormwater. In existing conditions, there are two discharge locations from the project site, one each for the west and east portables. The majority of the stormwater from the west proposed portable location sheet flows 80 feet southwest through grassed area to SE 2nd Place. Contrary to the COR Map, this stormwater flows west along the SE 2nd Place curb line. Stormwater enters a catch basin southwest of the project site on SE 2nd Place. Stormwater is then conveyed in an 8-inch pipe to a catch basin at the northeast corner of the intersection of SE 2nd Place and Jericho Avenue SE. The stormwater is then conveyed through an 18-inch concrete pipe through a series of catch basins west along SE 2nd Place, up to a storm manhole adjacent to the intersection of SE 2nd Place and Hoquiam Avenue SE. Stormwater is then conveyed to the south in a 48-inch pipe and outfalls to Maplewood Creek. Stormwater runoff from the eastern proposed portable location is also conveyed via downspouts and splash blocks, and sheet flows 80 feet south through grassed area to SE 2nd Place. It is conveyed east along the north curb flow line of SE 2nd Place until it enters the city system through a catch basin. The downstream pipe running east along SE 2nd Place is a 12-inch pipe that continues east for approximately 280 feet, until it reaches a catch basin (Facility ID No. 131933) located on the western flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 32 LF east through a 12-inch pipe to a catch basin (Facility ID No. 131934) located on the eastern flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 14 LF southeast through a 12-inch pipe to a catch basin (Facility ID No. 132309) located in the Lyons Avenue NE eastern right-of-way. The runoff then continues approximately 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of Parcel No. 6669030160. The runoff then continues another 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of No. 6669030120. Here, the runoff is directed north in a 12-inch pipe for approximately 100 feet to a manhole located in the southern flow line of SE 2nd Court (Facility ID No. 131935). The runoff then continues approximately 60 feet northeast through a 12-inch pipe to a manhole (Facility ID No. 131936). The runoff then continues approximately 45 feet east through a 12-inch pipe, where it outfalls at the City of Renton Detention Pond located at the end of SE 2nd Court. After passing through the detention pond control structure, runoff is directed southeast in an 18-inch pipe for approximately 60 feet to an outfall located in the Maplewood Neighborhood Park, a forested area (see Section 3.3 below). Technical Information Report Maplewood Heights Elementary School Portables 7 2160084.10 3.2 Task 2 – Resource Review The following resources were reviewed to discover any existing or potential problems in the study area:  Civil Engineering Plans: Maplewood Heights Elementary School, dated April 10, 1996, prepared by Waldron Pomeroy Smith Foote & Akira Architects.  Civil Engineering Plans: Maplewood Heights Elementary School, dated April 15, 2015, prepared by AHBL Inc.  FEMA Map: FEMA Flood Insurance Rate Map 53033C0982F, dated May 16, 1995, indicates that the project site lies within Zone X – areas determined to be outside the 500-year floodplain (see Exhibit A-8).  King County iMAP: The project site is not located in any of the following mapped critical areas: o Coal Mine Hazard Areas o Erosion Hazard Areas o Landslide Hazard Areas o Seismic Hazard Areas o Critical Aquifer Recharge Areas o 100-Year Flood Plain o Wetlands  Soils Information: Site soils have been classified as medium dense to very dense Vashon lodgement till, overlain in places by fill, based on a Geotechnical Report dated March 16, 2015, prepared by Associated Earth Sciences, Inc. (see Exhibit A-2).  City of Renton COR Maps: The downstream basins were delineated using City of Renton COR Maps, along with a site visit on April 9, 2016. 3.3 Task 3 – Field Inspection On April 9, 2016, AHBL staff performed a Downstream Analysis of the drainage system receiving stormwater runoff from the proposed portable classrooms at Maplewood Heights Elementary School. 1. Investigate any problems reported or observed during the resource review: No problems were reported or observed during the resource review. 2. Locate all existing/potential constrictions or lack of capacity in the existing drainage system: No constrictions or lack of capacity in the existing drainage system was observed. 3. Identify all existing/potential downstream drainage problems, as defined in Section 1.2.2.1: No existing/potential downstream drainage problems were observed. 4. Identify existing/potential overtopping, scouring, bank sloughing, or sedimentation: No existing/potential overtopping, scouring, bank sloughing, or sedimentation was observed. Technical Information Report Maplewood Heights Elementary School Portables 8 2160084.10 5. Identify significant destruction of aquatic habitat or organisms (e.g., severe siltation, back erosion, or incision in a stream): No significant destruction of aquatic habitat or organisms was observed. 6. Collect qualitative data on features such as land use, impervious surfaces, topography, and soil types: The land use on the project site is a school site, which consists of four double classroom portables, four portable ramps, associated asphalt walks, a storage container, and grassed area with dispersal trench to the south. The project site area is 8.67 acres, with 4.20 acres of existing impervious coverage. 7. Collect information on pipe sizes, channel characteristics, drainage structures, and relevant critical areas (e.g., wetlands, stream, and steep slopes): Pipe sizes were determined by using survey information and City of Renton COR Maps. The proposed western portable will drain to the west along SE 2nd Place and the proposed eastern portable will drain to the east. The following is a detailed description of the two drainage patterns. Western Portable Location: Drainage sheet flows over approximately 80 LF of grassy play area; the runoff flows west along the northern edge of SE 2nd Place until it enters the city system. Contrary to the COR map, the runoff continues westward through a catch basin (Facility ID No. 116024) on the northeast corner of Jericho Avenue SE and SE 2nd Place, and then under Jericho Avenue SE to a catch basin (Facility ID No. 116028) on the northwest corner of Jericho Avenue SE and SE 2nd Place. Pipe continues in the westward direction in an 18-inch pipe until reaching a manhole at the intersection of Hoquiam Avenue SE and SE 2nd Place, where the drainage is conveyed south in a 48-inch storm pipe to Maplewood Creek. Wetland area signs were observed at Maplewood Creek; however, the wetland is not within 0.25 mile, according to the COR Map. Eastern Portable Location: Drainage sheet flows over approximately 80 LF of grassy play area and east along the northern edge of SE 2nd Place, until it enters the city system through a catch basin. The downstream pipe running east along SE 2nd Place is a 12-inch pipe that continues east for approximately 280 feet, until it reaches a catch basin (Facility ID No. 131933) located on the western flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 32 LF east through a 12-inch pipe to a catch basin (Facility ID No. 131934) located on the eastern flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 14 LF southeast through a 12-inch pipe to a catch basin (Facility ID No. 132309) located in the Lyons Avenue NE eastern right-of-way. The runoff then continues approximately 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of Parcel No. 6669030160. The runoff then continues another 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of No. 6669030120. Here, the runoff is directed north in a 12-inch pipe for approximately 100 feet to a manhole located in the southern flow line of SE 2nd Court (Facility ID No. 131935). The runoff then continues approximately 60 feet northeast through a 12-inch pipe to a manhole (Facility ID No. 131936). The runoff then continues approximately 45 feet east through a 12-inch pipe, where it outfalls at the City of Renton Detention Pond located at the end of SE 2nd Court. After passing through the detention pond control structure, runoff is directed southeast in an 18-inch pipe for approximately 60 feet to an outfall located in the Maplewood Neighborhood Park, a forested area. 8. Verify tributary basins delineated in Task 1: Based on the topography onsite, the basin delineation based on the survey was confirmed. Technical Information Report Maplewood Heights Elementary School Portables 9 2160084.10 9. Contact neighboring property owners or residents in the area about past or existing drainage problems, and describe these in the report (optional): This requirement is not applicable for this project. 10. Note the date and weather conditions at the time of the inspection: The site visit occurred on April 9, 2016. The weather was overcast and 60 degrees. 3.4 Task 4 – Drainage System Description and Problem Descriptions The natural discharge location of stormwater for the project area is the grass field south of the existing portables. Stormwater will flow from the proposed portables to catch basins via roof drains and closed conveyance piping to two gravel-filled trenches along the south side of the proposed portables. Stormwater is proposed to sheet flow from the gravel-filled trenches through a vegetated flow path toward SE 2nd Place. Stormwater from the western portable will flow southwest, until it reaches SE 2nd Place. This stormwater then flows west along the SE 2nd Place curb line. Stormwater enters a catch basin southwest of the project site on SE 2nd Place. Stormwater is then conveyed in an 8-inch pipe to a catch basin at the northeast corner of the intersection of SE 2nd Place and Jericho Avenue SE. Stormwater is then conveyed through an 18-inch concrete pipe through a series of catch basins west along SE 2nd Place, up to a storm manhole adjacent to the intersection of SE 2nd Place and Hoquiam Avenue SE. Stormwater is then conveyed to the south in a 48-inch pipe and outfalls to Maplewood Creek. Once the stormwater from the eastern portable passes through the gravel-filled trench, it flows southeast until it reaches SE 2nd Place. The runoff will flow east along the northern edge of SE 2nd Place until it enters the city system through a catch basin. The downstream pipe running east along SE 2nd Place is a 12-inch pipe that continues east for approximately 280 feet, until it reaches a catch basin (Facility ID No. 131933) located on the western flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 32 LF east through a 12-inch pipe to a catch basin (Facility ID No. 131934) located on the eastern flowline of the intersection of SE 2nd Place and Lyons Avenue NE. The runoff then continues approximately 14 LF southeast through a 12-inch pipe to a catch basin (Facility ID No. 132309) located in the Lyons Avenue NE eastern right-of-way. The runoff then continues approximately 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of Parcel No. 6669030160. The runoff then continues another 270 LF east through a 12-inch pipe to a catch basin located in the back yard area of No. 6669030120. Here, the runoff is directed north in a 12-inch pipe for approximately 100 feet to a manhole located in the southern flow line of SE 2nd Court (Facility ID No. 131935). The runoff then continues approximately 60 feet northeast through a 12 inch pipe to a manhole (Facility ID No. 131936). The runoff then continues approximately 45 feet east through a 12-inch pipe, where it outfalls at the City of Renton Detention Pond located at the end of SE 2nd Court. After passing through the detention pond control structure, runoff is directed southeast in an 18-inch pipe for approximately 60 feet to an outfall located in the Maplewood Neighborhood Park, a forested area No signs of flooding, overtopping, or erosion were evident at the time of the inspection. 4.0 Flow Control and Water Quality Facility Analysis and Design See Sections 2.3 and 2.8 above for the Flow Control and Water Quality Analysis sections. Technical Information Report Maplewood Heights Elementary School Portables 10 2160084.10 5.0 Conveyance System Analysis and Design The project proposes collection of storm drainage from the two proposed double classroom portables via roof drain systems that drain to proposed catch basins onsite. Storm drainage from proposed asphalt pavement and grassed areas sheet flow to five proposed area drains onsite, prior to connection to gravel-filled trenches along the south side of the project site. Conveyance capacity calculations are included in Appendix A-7. 6.0 Special Reports and Studies A Geotechnical Report dated March 16, 2015, prepared by Associated Earth Sciences, Inc., can be found in Appendix A-2. 7.0 Other Permits No other permits are required as part of this proposed development. 8.0 Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design The proposed development shall comply with guidelines set forth in City of Renton drainage requirements. The plan will include erosion/sedimentation control features designed to prevent sediment-laden runoff from leaving the site or adversely affecting critical water resources during construction. The following measures are shown on the ESC plans and will be used to control sedimentation/ erosion processes:  Clearing Limits – All areas to remain undisturbed during the construction of the project will be delineated prior to any site clearing or grading.  Cover Measures – Cover measures will be implemented for the disturbed areas.  Perimeter Protection – Filter fabric fences for site runoff protection will be provided at the downstream site perimeter.  Traffic Area Stabilization – Traffic area stabilization is not applicable for this project.  Sediment Retention – Inlet sediment protection will be utilized as part of this project.  Storm Drain Inlet Protection – Inlet sediment protection will be provided on all new and existing catch basins downstream of construction activities.  Surface Water Collection – Catch basins and conveyance pipes will provide surface water collection.  Dewatering Control – Dewatering Control is not applicable for this project.  Dust Control – Dust control measures, including sweeping and water truck, will be implemented when exposed soils are dry to the point that wind transport is possible, and roadways, drainage ways, or surface waters are likely to be impacted.  Flow Control – Flow control is provided with three gravel-filled trenches along the south side of the project site. Technical Information Report Maplewood Heights Elementary School Portables 11 2160084.10 9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant See Section 2.7 above for CR 7 – Financial Guarantees and Liability. See Appendix A-10 for the City of Renton Bond Quantities Worksheet. Facility Summaries and Declaration of Covenant are not applicable to this project. 10.0 Operations and Maintenance Manual Maintenance and operations of all drainage facilities will be maintained by the owner. The project proposes new catch basins onsite. See Appendix A-9 for operations and maintenance information. 11.0 Conclusion This site has been designed to meet or exceed the requirements of the 2009 King County Surface Water Design Manual, as amended by the City of Renton Amendments to the King County Surface Water Design Manual (February 2010). Flow calculations and modeling utilize City of Renton standards for sizing stormwater conveyance. This analysis is based on data and records either supplied to or obtained by AHBL. These documents are referenced within the text of the analysis. The analysis has been prepared using procedures and practices within the standard accepted practices of the industry. AHBL, Inc. Anne M. Turpin, PE Project Engineer AMT/lsk April 2016 Q:\2016\2160084\WORDPROC\Reports\20160419 Rpt (TIR) 2160085.10.docx Technical Information Report Maplewood Heights Elementary School Portables 2160084.10 Appendix A Technical Information Report (TIR) Worksheet Exhibits A-1 .................... Vicinity Map A-2 .................... Geotechnical Report A-3 .................... Existing Conditions Map A-4 .................... Site Plan A-5 .................... Existing Basin Map A-6 .................... Developed Basin Map A-7 .................... Conveyance Calculations A-8 .................... FIRM Rate Map A-9 .................... Operations and Maintenance Manual A-10 .................. City of Renton Bond Quantities Worksheet A-11 .................. The City of Renton COR Map Part 4 OTHER REVIEWS AND PERMITS • DFW HPA • COE 404 LI DOE Dam Safety • FEMA Floodplain • COE Wetlands • Other i1/4 LI Shoreline Management U Structural RockeryNault/ U ESA Section 7 Part 2 PROJECT LOCATION AND DESCRIPTION Project Name MgPt/-;b16)00 h U>rtiar DDES Permit # Location Township Range 0 5 Section 15 Site Address jTiz(ci-)0 kve 5.- gi-ro; ki,1 gewsci. KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part I PROJECT OWNER AND PROJECT ENGINEER Project Owner RENT-o(J r)(ST( c( Phone qZ5--- 4 2z) — i-/Ve Address 7 61 2— S 12.a 5-fc 5Q, Ti-L-/-5, 4-'8(7S- Project Engineer RD Fl / A-) Fe /4A/76;70 V 41'J Company Aft@ Phone 2.5-3-3S' 3- 7 (I Part 3 TYPE OF PERMIT APPLICATION • Landuse Services Subdivison / Short Subd. / UPD CI Building Services M/F / Commerical / SFR [2/Clearing and Grading D Right-of-Way Use D Other Part 5 PLAN AND REPORT INFORMATION Technical Information Report Type of Drainage Review F / Targeted / (circle): Large Site Date (include revision Site Improvement Plan (Engr. Plans) Type (circle one): 431) / Modified / mall Site Date (include revision dates): dates): Date of Final: Date of Final: Part 6 ADJUSTMENT APPROVALS Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket Description: (include conditions in TIR Section 2) 0/4 P'/A Date of Approval: 2009 Surface Surface Water Design Manual 1 1/9/2009 /43 c r Anne Turpin L3 Sole Source Aquifer CI Seeps/Springs CI High Groundwater Table (within 5 feet) LI Other Yes tJj A Describe: J /A Monitoring Required: Start Date: Completion Date: Part 7 MONITORING REQUIREMENTS Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan : Esiv cAsrt-e- Special District Overlays: Drainage Basin: Z.- OGV/5-/e. C C--=Pfl 0 ( Stormwater Requirements: Part 9 ONSITE AND ADJACENT SENSITIVE AREAS U River/Stream 1:1 Lake CI Wetlands U Closed Depression 1:1 Floodplain Other OM CI Steep Slope CI Erosion Hazard L3 Landslide Hazard CI Coal Mine Hazard E3 Seismic Hazard U Habitat Protection Slopes 51— iC Soil Type A c / tij (04,04- Erosion Potential Mock:0 Part 10 SOILS CI Additional Sheets Attached KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2009 Surface Water Design Manual 1/9/2009 2 x Wetlands are on adjacent sites Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE U Core 2 — Offsite Analysis ID Sensitive/Critical Areas • SEPA El Other w D Additional Sheets Attached LIMITATION / SITE CONSTRAINT KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Threshold Discharge Area: (name or description) Core Core Requirements (all 8 apply) Discharge at Natural Location Number of Natural Discharge Locations: Offsite Analysis Level:6)1‘ / 2 / 3 dated: 31/ ? 5 Flow Control Level: 1 / 2 / 3 or Exemption Number (incl. facility summary sheet) Small Site BMPs Conveyance System Spill containment located at: Erosion and Sediment Control ESC Site Supervisor: lop A F--- r --E,. 2 Pg. Phone: / Contact Phone: A 0 After Hours Phone: WARDP: Maintenance and Operation Responsibility: Private / ubliq) If Private, Maintenance Log Required: Yes / No Financial Guarantees and Provided:s)H/ No Liability Water Quality Type: Basic / Sens. Lake / Enhanced Basicm / Bog (include facility summary sheet) or Exemption No. / Landscape Management Plan: Yes / No Special Requirements (as applicable) Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None iRequirements ne: . Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None /1/ //4 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: A/44 Source Control Describe landuse: (comm./industrial landuse)/1/44 Describe any structural controls: 2009 Surface Water Design Manual 1/9/2009 3 2 04/09/2016 Oil Control High-use Site: Yes No Treatment BMP: Maintenance Agreement: Yes with whom? Other Drainage Structures Describe: cc_cs-ro ce_FC) Ce KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION _plearing Limits 4 Cover Measures U Perimeter Protection U Traffic Area Stabilization U Sediment Retention El Surface Water Collection U Dewatering Control Dust Control U Flow Control MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION Stabilize Exposed Surfaces Remove and Restore Temporary ESC Facilities Clean and Remove All Silt and Debris, Ensure Operation of Permanent Facilities U Flag Limits of SAO and open space preservation areas 0 Other Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch) Flow Control Type/Description Water Quality Type/Description CI Detention CI Infiltration CI Regional Facility U Shared Facility L3 Flow Control BM Ps . Other 0 Biofiltration U Wetpool U Media Filtration 0 Oil Control CI Spill Control U Flow Control BMPs Li Other & j.kiti vt3;/, Httei> -0Z IV (44 PI 2009 Surface Surface Water Design Manual 1/9/2009 4 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS El Drainage Easement El Covenant El Native Growth Protection Covenant El Tract D Other 0 74- El Cast in Place Vault CI Retaining Wall D Rockery > 4' High 0 Structural on Steep Slope El Other M (i+ Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. 1\rk111444„...,.. -&:JIA•6°qC LIM IZ.015 Signed/Date 2009 Surface Water Design Manual 1/9/2009 5 April 19, 2016 Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMAPLEWOOD HEIGHTS ELEMENTARYSCHOOL PORTABLES VICINITY MAP SITELOCATION March 16, 2015 Project No. KE150128A Renton School District c/o Greene Gasaway Architects, PLLC P.O. Box 4158 Federal Way, Washington 98062 Attention: Mr. Sam Rosendahl Subject: Document Review Portable Classroom Placements Renton School District Multiple Locations Dear Mr. Rosendahl: This report presents the results of Associated Earth Sciences, Inc.’s (AESI’s) review of AESI’s past project files and exploration logs at schools currently planned to receive new portable classrooms. This summary of available subsurface exploration information has been prepared for the eight elementary schools identified by Greene Gasaway Architects, PLLC. Where past explorations have been identified, preliminary findings, including our opinion regarding the feasibility of storm water infiltration, are provided. Written authorization to proceed with this study was granted by Greene Gasaway Architects, PLLC. This review was accomplished in general accordance with our original proposal letter dated March 6, 2015. This report has been prepared for the exclusive use of the Renton School District, and its agents, for specific application to this project. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering and engineering geology practices in effect in this area at the time our report was prepared. No other warranty, express or implied, is made. PROJECT AND SITE DESCRIPTIONS We understand that the Renton School District is proposing the placement (or replacement) of portable classroom buildings at the following elementary schools: Kirkland Office | 911 Fifth Avenue | Kirkland, WA 98033 P | 425.827.7701 F| 425.827.5424 Everett Office | 2911 ½ Hewitt Avenue, Suite 2 | Everett, WA 98201 P | 425.259.0522 F | 425.252.3408 Tacoma Office | 1552 Commerce Street, Suite 102 | Tacoma, WA 98402 P | 253.722.2992 F | 253.722.2993 www.aesgeo.com Portable Classroom Placements Renton School District Document Review Proposed placement during 2015 • Maplewood Heights: 130 - Jericho Avenue SE, Renton, Washington • Hazelwood: 7100 - 116th Avenue SE, Newcastle, Washington • Campbell Hill: 6418 S 124th Street, Seattle, Washington • Sierra Heights: 2501 - Union Avenue NE, Renton, Washington Proposed placement possibly during 2016 • Tiffany Park: 1601 Lake Youngs Way SE, Renton, Washington • Talbot Hill: 2300 Talbot Road South, Renton, Washington • Lakeridge: 7400 South 115th Street, Seattle, Washington • Bryn Mawr: 8212 South 118th Street, Seattle, Washington We understand that the portable buildings will be self-contained, and each will consist of a wood-frame building supported on concrete foundation bearing strips. A crawl-space floor design is expected, without a slab-on-grade floor. We understand that infiltration of collected storm water is currently under consideration for the proposed portable buildings. AESI DOCUMENT REVIEW - FINDINGS AESI has completed a review of AESI’s past project files and exploration logs of the above-listed sites. The following sections provide a brief overview of the anticipated subsurface conditions at each site, based on the data gathered during our document review. Copies of previous AESI exploration logs and site plans reviewed for this study are attached to this report. Maplewood Heights Elementary School AESI completed subsurface explorations at the Maplewood Heights Elementary School (ES) site in January 2012 and January 2015. In summary, these explorations encountered medium dense to very dense Vashon lodgement till, overlain in places by fill. The Vashon lodgement till is generally considered suitable for foundation support of portable classroom structures. We consider the density and texture of the lodgement till encountered in our past explorations, along with our previous experience with sites exhibiting similar soil conditions, to preclude the use of infiltration for the handling of storm water runoff at the Maplewood Heights ES site, in our opinion. March 16, 2015 ASSOCIATED EARTH SCIENCES, INC. JPL/pc – KE150128A2 – Projects\20150128\KE\WP Page 2 Portable Classroom Placements Renton School District Document Review Hazelwood Elementary School AESI completed subsurface explorations at the Hazelwood ES site in June, July, August and November 2003, and February 2004. In summary, these explorations encountered medium dense to very dense Vashon lodgement till, Vashon advance outwash, and Tukwila Formation bedrock, overlain in places by fill. The lodgement till, advance outwash, and bedrock are generally considered suitable for foundation support of portable classroom structures. We consider the density and texture of the lodgement till, and bedrock encountered in our past explorations, along with our previous experience with sites exhibiting similar soil/rock conditions, to preclude the use of infiltration for the handling of storm water runoff. The Vashon advance outwash soils, encountered primarily at the northern and eastern portions of the Hazelwood ES site, may be conducive to storm water infiltration. We recommend a site-specific exploration for the proposed portables to evaluate the feasibility of storm water infiltration at the planned locations of the new structures. Campbell Hill Elementary School AESI completed subsurface explorations at the Campbell Hill ES site in December 2000. In summary, these explorations encountered medium dense to very dense ablation till, lodgement till, and Tukwila Formation bedrock, overlain in places by fill. The ablation till, lodgement till, and bedrock are generally considered suitable for foundation support of portable classroom structures. We consider the variability in density and texture of the ablation till, the density and texture of the lodgement till, and bedrock encountered in our past explorations, along with our previous experience with sites exhibiting similar soil/rock conditions, to preclude the use of infiltration for the handling of storm water runoff at the Campbell Hill ES site, in our opinion. Sierra Heights Elementary School AESI completed subsurface explorations at the Sierra Heights ES site in September 1993. In summary, these explorations encountered very dense Vashon lodgement till, overlain in places by fill. The Vashon lodgement till is generally considered suitable for foundation support of portable classroom structures. We consider the density and texture of the lodgement till encountered in our past explorations, along with our previous experience with sites exhibiting similar soil conditions, to preclude the use of infiltration for the handling of storm water runoff at the Sierra Heights ES site, in our opinion. Tiffany Park Elementary School Our research did not reveal past AESI subsurface explorations at the existing Tiffany Park ES site. AESI completed subsurface explorations at a potential Tiffany Park ES site, located to the southeast of the existing Tiffany Park ES campus, in September 2012. In summary, these March 16, 2015 ASSOCIATED EARTH SCIENCES, INC. JPL/pc – KE150128A2 – Projects\20150128\KE\WP Page 3 Portable Classroom Placements Renton School District Document Review explorations encountered medium dense to very dense Vashon lodgement till. Also, our review of the Geologic Map of King County, Washington, by Derek B. Booth, Kathy A. Troost, and Aaron P. Wisher, 2006, indicates that the existing Tiffany Park ES site is underlain by lodgement till sediments. The Vashon lodgement till is generally considered suitable for foundation support of portable classroom structures. We consider the density and texture of the lodgement till encountered in our past explorations at the nearby site, along with our review of the regional geologic map and our previous experience with sites exhibiting similar soil conditions, to likely preclude the use of infiltration for the handling of storm water runoff at the existing Tiffany Park ES site, in our opinion. We recommend a site-specific exploration for the proposed portables to evaluate the feasibility of storm water infiltration at the planned locations of the new structures. Talbot Hill Elementary School AESI completed subsurface explorations at the Talbot Hill ES site in April 1996. In summary, these explorations encountered very dense lodgement till and Renton Formation bedrock, overlain in places by fill. The lodgement till and bedrock are generally considered suitable for foundation support of portable classroom structures. We consider the density and texture of the lodgement till, and bedrock encountered in our past explorations, along with our previous experience with sites exhibiting similar soil/rock conditions, to preclude the use of infiltration for the handling of storm water runoff at the Talbot Hill ES site, in our opinion. Lakeridge Elementary School AESI completed subsurface explorations at the Lakeridge ES site in April 1991, January 1993 and March 1994, and issued a letter dated April 22, 2014 providing our opinion regarding the feasibility of storm water infiltration, based on previous explorations in the vicinity of the site. In summary, the referenced explorations, both on-site and in the vicinity, encountered very dense Vashon lodgement till, overlain in places by fill. The Vashon lodgement till is generally considered suitable for foundation support of portable classroom structures. As mentioned in our April 22, 2014 letter, we consider the density and texture of the lodgement till encountered in our past explorations, along with our previous experience with sites exhibiting similar soil conditions, to preclude the use of infiltration for the handling of storm water runoff at the Lakeridge ES site, in our opinion. Bryn Mawr Elementary School Our research did not reveal past AESI subsurface explorations at the Bryn Mawr ES site. AESI recently issued a proposal to complete subsurface explorations for support in design of ADA improvement at the existing Bryn Mawr ES campus. We recommend that these explorations be March 16, 2015 ASSOCIATED EARTH SCIENCES, INC. JPL/pc – KE150128A2 – Projects\20150128\KE\WP Page 4 Attachment A: Site Plan and Exploration Logs Maplewood Heights ES Attachment B: Site Plan and Exploration Logs Hazelwood ES Attachment C: Site Plan and Exploration Logs Campbell Hill ES Attachment D: Site Plan and Exploration Logs Sierra Heights ES Attachment E: Site Plan and Exploration Logs Tiffany Park ES (nearby site) Attachment F: Site Plan and Exploration Logs Talbot Hill ES Attachment G: Site Plan and Exploration Logs Lakeridge ES 144TH AVENUE SE (JERICHO AVENUE SE)SE 136TH STREETSE 136TH STREETPOINT OFDISCHARGEPOINT OFDISCHARGEPROJECT LIMITSAREA: 0.12 ACEXISTING IMPERVIOUS: 0.01 ACEXISTING PERVIOUS: 0.11 ACPROJECT LIMITSAREA: 0.14 ACEXISTING IMPERVIOUS: 0.00 ACEXISTING PERVIOUS: 0.14 ACTOTAL AREA: 0.26 ACTOTAL IMPERVIOUS: 0.01 ACTOTAL PERVIOUS: 0.25 ACCivil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMAPLEWOOD HEIGHTS ELEMENTARYSCHOOL PORTABLESGRAPHIC SCALE03060 FEET1" = 30 FEET15N DSDSDSDSDSDSDSDSPROJECT LIMITSAREA: 0.12 ACPROPOSED IMPERVIOUS: 0.07 ACPROPOSED PERVIOUS: 0.05 ACPROJECT LIMITSAREA: 0.14 ACPROPOSED IMPERVIOUS: 0.08 ACPROPOSED PERVIOUS: 0.06 ACTOTAL AREA: 0.26 ACTOTAL IMPERVIOUS: 0.15 ACTOTAL PERVIOUS: 0.11 ACCivil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMAPLEWOOD HEIGHTS ELEMENTARYSCHOOL PORTABLESGRAPHIC SCALE03060 FEET1" = 30 FEET15NLEGENDNEW IMPERVIOUS:0.15 ACREPLACED IMPERVIOUS0.01 AC PROJECT BASIN LIMITSAREA: 0.08 ACEXISTING IMPERVIOUS: 0.01 ACEXISTING PERVIOUS: 0.07 ACPROJECT BASIN LIMITSAREA: 0.11 ACEXISTING IMPERVIOUS: 0.00 ACEXISTING PERVIOUS: 0.11 ACTOTAL AREA: 0.19 ACTOTAL IMPERVIOUS: 0.01 ACTOTAL PERVIOUS: 0.18 ACCivil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMAPLEWOOD HEIGHTS ELEMENTARYSCHOOL PORTABLESGRAPHIC SCALE02040 FEET1" = 20 FEET10N DSDSDSDSDSDSDSDSGRAVEL FILLEDTRENCH #1GRAVEL FILLEDTRENCH #2PROJECT BASIN LIMITSAREA: 0.08 ACPROPOSED IMPERVIOUS: 0.06 ACPROPOSED PERVIOUS: 0.02 ACPROJECT BASIN LIMITSAREA: 0.11 ACPROPOSED IMPERVIOUS: 0.08 ACPROPOSED PERVIOUS: 0.03 ACTOTAL AREA: 0.19 ACTOTAL IMPERVIOUS: 0.14 ACTOTAL PERVIOUS: 0.05 ACCivil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMAPLEWOOD HEIGHTS ELEMENTARYSCHOOL PORTABLESGRAPHIC SCALE02040 FEET1" = 20 FEET10LEGENDTRIBUTARY AREA TO GRAVEL FILLEDTRENCH #1:0.07 AC IMPERVIOUS0.04 AC PERVIOUSTRIBUTARY AREA TO GRAVEL FILLEDTRENCH #2:0.07 AC IMPERVIOUS0.05 AC PERVIOUSN A-7 Western Portable – Western Roof Drain Contributing Area (ac) Proposed Impervious 0.02 Appended on: 08:52:21 Tuesday, April 19, 2016 ROUTEHYD [] THRU [Western Port - Western RD] USING Seattle AND [25 yr] NOTZERO RELATIVE RATIONAL Reach ID Area (ac) TC (min) Flow (cfs) Full Q (cfs) Full ratio nDepth (ft) Size nVel (ft/s) fVel (ft/s) CBasin / Hyd 1 0.0200 7.00 0.0460 0.5626 0.08 0.0967 6" Diam 1.7265 2.8654 Area 1 From Node To Node Rch Loss (ft) App (ft) Bend (ft) Junct Loss (ft) HW Loss Elev (ft) Max El (ft) 401.9250 Downspout CB #1 402.6652 ------ ------ ------ 402.6652 404.3000 A-7 Record Id: Area 1 Design Method Rational IDF Table: Seattle Composite C Calc Description SubArea Sub c Pavement and roofs (n=0.90) 0.02 ac 0.90 Directly Connected TC Calc Type Description Length Slope Coeff Misc TT Fixed 6.30 min Directly Connected TC 6.30min Record Id: Downspout Descrip: Prototype Record Increment 0.10 ft Start El. 402.5000 ft Max El. 404.3000 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 402.5000 ft 0.0000 cf 403.4000 ft 3.5730 cf 402.6000 ft 0.3970 cf 403.5000 ft 3.9700 cf 402.7000 ft 0.7940 cf 403.6000 ft 4.3670 cf 402.8000 ft 1.1910 cf 403.7000 ft 4.7640 cf 402.9000 ft 1.5880 cf 403.8000 ft 5.1610 cf 403.0000 ft 1.9850 cf 403.9000 ft 5.5580 cf 403.1000 ft 2.3820 cf 404.0000 ft 5.9550 cf 403.2000 ft 2.7790 cf 404.1000 ft 6.3520 cf 404.3000 ft 7.1460 cf A-7 Appended on: 08:48:48 Tuesday, April 19, 2016 Record Id: CB #1 Descrip: Prototype Record Increment 0.10 ft Start El. 401.8000 ft Max El. 404.3000 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 401.8000 ft 0.0000 cf 403.1000 ft 5.1610 cf 401.9000 ft 0.3970 cf 403.2000 ft 5.5580 cf 402.0000 ft 0.7940 cf 403.3000 ft 5.9550 cf 402.1000 ft 1.1910 cf 403.4000 ft 6.3520 cf 402.2000 ft 1.5880 cf 403.5000 ft 6.7490 cf 402.3000 ft 1.9850 cf 403.6000 ft 7.1460 cf 402.4000 ft 2.3820 cf 403.7000 ft 7.5430 cf 402.5000 ft 2.7790 cf 403.8000 ft 7.9400 cf 402.6000 ft 3.1760 cf 403.9000 ft 8.3370 cf 402.7000 ft 3.5730 cf 404.0000 ft 8.7340 cf 402.8000 ft 3.9700 cf 404.1000 ft 9.1310 cf 402.9000 ft 4.3670 cf 404.2000 ft 9.5280 cf 404.3000 ft 9.9250 cf A-7 Appended on: 08:49:17 Tuesday, April 19, 2016 Record Id: 1 Section Shape: Circular Uniform Flow Method: Manning's Coefficient: 0.0130 Routing Method: Travel Time Translation DnNode CB #1 UpNode Downspout Material Plastic Size 6" Diam Ent Losses Groove End w/Headwall Length 72.0000 ft Slope 1.00% Up Invert 402.5200 ft Dn Invert 401.8000 ft Conduit Constraints Min Vel Max Vel Min Slope Max Slope Min Cover 2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr Up Invert 401.8000 ft Dn Invert 402.5200 ft Match inverts. DnNode CB #1 UpNode Downspout A-7 Western Portable – Eastern Roof Drain Contributing Area (ac) Proposed Impervious 0.04 Proposed Pervious 0.02 Appended on: 08:59:06 Tuesday, April 19, 2016 ROUTEHYD [] THRU [Western Port - Western RD] USING Seattle AND [25 yr] NOTZERO RELATIVE RATIONAL Reach ID Area (ac) TC (min) Flow (cfs) Full Q (cfs) Full ratio nDepth (ft) Size nVel (ft/s) fVel (ft/s) CBasin / Hyd 2 0.0600 6.85 0.1048 0.5626 0.19 0.1460 6" Diam 2.1954 2.8654 Area 1 From Node To Node Rch Loss (ft) App (ft) Bend (ft) Junct Loss (ft) HW Loss Elev (ft) Max El (ft) 401.9562 Downspout CB #2 402.7380 ------ ------ ------ 402.7379 406.7400 A-7 Record Id: Area 2 Design Method Rational IDF Table: Seattle Composite C Calc Description SubArea Sub c Pavement and roofs (n=0.90) 0.04 ac 0.90 Lawn (n=0.25) 0.02 ac 0.25 Directly Connected TC Calc Type Description Length Slope Coeff Misc TT Fixed 6.30 min Directly Connected TC 6.30min Appended on: 16:57:13 Monday, April 18, 2016 Record Id: Downspout Descrip: Prototype Record Increment 0.10 ft Start El. 402.5200 ft Max El. 406.7400 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 402.5200 ft 0.0000 cf 404.7200 ft 8.7340 cf 402.6200 ft 0.3970 cf 404.8200 ft 9.1310 cf 402.7200 ft 0.7940 cf 404.9200 ft 9.5280 cf 402.8200 ft 1.1910 cf 405.0200 ft 9.9250 cf 402.9200 ft 1.5880 cf 405.1200 ft 10.3220 cf 403.0200 ft 1.9850 cf 405.2200 ft 10.7190 cf 403.1200 ft 2.3820 cf 405.3200 ft 11.1160 cf 403.2200 ft 2.7790 cf 405.4200 ft 11.5130 cf 403.3200 ft 3.1760 cf 405.5200 ft 11.9100 cf 403.4200 ft 3.5730 cf 405.6200 ft 12.3070 cf 403.5200 ft 3.9700 cf 405.7200 ft 12.7040 cf 403.6200 ft 4.3670 cf 405.8200 ft 13.1010 cf A-7 403.7200 ft 4.7640 cf 405.9200 ft 13.4980 cf 403.8200 ft 5.1610 cf 406.0200 ft 13.8950 cf 403.9200 ft 5.5580 cf 406.1200 ft 14.2920 cf 404.0200 ft 5.9550 cf 406.2200 ft 14.6890 cf 404.1200 ft 6.3520 cf 406.3200 ft 15.0860 cf 404.2200 ft 6.7490 cf 406.4200 ft 15.4830 cf 404.3200 ft 7.1460 cf 406.5200 ft 15.8800 cf 404.4200 ft 7.5430 cf 406.6200 ft 16.2770 cf 404.5200 ft 7.9400 cf 406.7200 ft 16.6740 cf 406.7400 ft 16.7534 cf Record Id: CB #2 Descrip: Prototype Record Increment 0.10 ft Start El. 401.8000 ft Max El. 404.3000 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 401.8000 ft 0.0000 cf 403.1000 ft 5.1610 cf 401.9000 ft 0.3970 cf 403.2000 ft 5.5580 cf 402.0000 ft 0.7940 cf 403.3000 ft 5.9550 cf 402.1000 ft 1.1910 cf 403.4000 ft 6.3520 cf 402.2000 ft 1.5880 cf 403.5000 ft 6.7490 cf 402.3000 ft 1.9850 cf 403.6000 ft 7.1460 cf 402.4000 ft 2.3820 cf 403.7000 ft 7.5430 cf 402.5000 ft 2.7790 cf 403.8000 ft 7.9400 cf 402.6000 ft 3.1760 cf 403.9000 ft 8.3370 cf 402.7000 ft 3.5730 cf 404.0000 ft 8.7340 cf 402.8000 ft 3.9700 cf 404.1000 ft 9.1310 cf 402.9000 ft 4.3670 cf 404.2000 ft 9.5280 cf 404.3000 ft 9.9250 cf A-7 Record Id: 2 Section Shape: Circular Uniform Flow Method: Manning's Coefficient: 0.0130 Routing Method: Travel Time Translation DnNode CB #2 UpNode Downspout Material Plastic Size 6" Diam Ent Losses Groove End w/Headwall Length 72.0000 ft Slope 1.00% Up Invert 402.5200 ft Dn Invert 401.8000 ft Conduit Constraints Min Vel Max Vel Min Slope Max Slope Min Cover 2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr Up Invert 401.8000 ft Dn Invert 402.5200 ft Match inverts. DnNode CB #2 UpNode Downspout A-7 Eastern Portable – Western Roof Drain Contributing Area (ac) Proposed Impervious 0.06 Proposed Pervious 0.03 History Cleared: 09:07:53 Tuesday, April 19, 2016 ROUTEHYD [] THRU [Western Port - Western RD] USING Seattle AND [25 yr] NOTZERO RELATIVE RATIONAL Reach ID Area (ac) TC (min) Flow (cfs) Full Q (cfs) Full ratio nDepth (ft) Size nVel (ft/s) fVel (ft/s) CBasin / Hyd 3 0.0900 6.79 0.1571 0.5626 0.28 0.1807 6" Diam 2.4568 2.8654 Area 1 From Node To Node Rch Loss (ft) App (ft) Bend (ft) Junct Loss (ft) HW Loss Elev (ft) Max El (ft) 402.4531 Downspout CB #3 403.2440 ------ ------ ------ 403.2440 406.7500 A-7 Record Id: Area 3 Design Method Rational IDF Table: Seattle Composite C Calc Description SubArea Sub c Pavement and roofs (n=0.90) 0.06 ac 0.90 Lawn (n=0.25) 0.03 ac 0.25 Directly Connected TC Calc Type Description Length Slope Coeff Misc TT Fixed 6.30 min Directly Connected TC 6.30min Record Id: Downspout Descrip: Prototype Record Increment 0.10 ft Start El. 402.9700 ft Max El. 406.7500 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 402.9700 ft 0.0000 cf 404.8700 ft 7.5430 cf 403.0700 ft 0.3970 cf 404.9700 ft 7.9400 cf 403.1700 ft 0.7940 cf 405.0700 ft 8.3370 cf 403.2700 ft 1.1910 cf 405.1700 ft 8.7340 cf 403.3700 ft 1.5880 cf 405.2700 ft 9.1310 cf 403.4700 ft 1.9850 cf 405.3700 ft 9.5280 cf 403.5700 ft 2.3820 cf 405.4700 ft 9.9250 cf 403.6700 ft 2.7790 cf 405.5700 ft 10.3220 cf 403.7700 ft 3.1760 cf 405.6700 ft 10.7190 cf 403.8700 ft 3.5730 cf 405.7700 ft 11.1160 cf 403.9700 ft 3.9700 cf 405.8700 ft 11.5130 cf 404.0700 ft 4.3670 cf 405.9700 ft 11.9100 cf 404.1700 ft 4.7640 cf 406.0700 ft 12.3070 cf A-7 404.2700 ft 5.1610 cf 406.1700 ft 12.7040 cf 404.3700 ft 5.5580 cf 406.2700 ft 13.1010 cf 404.4700 ft 5.9550 cf 406.3700 ft 13.4980 cf 404.5700 ft 6.3520 cf 406.4700 ft 13.8950 cf 404.6700 ft 6.7490 cf 406.5700 ft 14.2920 cf 406.7500 ft 15.0066 cf Record Id: CB #3 Descrip: Prototype Record Increment 0.10 ft Start El. 402.2500 ft Max El. 405.7500 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 402.2500 ft 0.0000 cf 404.0500 ft 7.1460 cf 402.3500 ft 0.3970 cf 404.1500 ft 7.5430 cf 402.4500 ft 0.7940 cf 404.2500 ft 7.9400 cf 402.5500 ft 1.1910 cf 404.3500 ft 8.3370 cf 402.6500 ft 1.5880 cf 404.4500 ft 8.7340 cf 402.7500 ft 1.9850 cf 404.5500 ft 9.1310 cf 402.8500 ft 2.3820 cf 404.6500 ft 9.5280 cf 402.9500 ft 2.7790 cf 404.7500 ft 9.9250 cf 403.0500 ft 3.1760 cf 404.8500 ft 10.3220 cf 403.1500 ft 3.5730 cf 404.9500 ft 10.7190 cf 403.2500 ft 3.9700 cf 405.0500 ft 11.1160 cf 403.3500 ft 4.3670 cf 405.1500 ft 11.5130 cf 403.4500 ft 4.7640 cf 405.2500 ft 11.9100 cf 403.5500 ft 5.1610 cf 405.3500 ft 12.3070 cf 403.6500 ft 5.5580 cf 405.4500 ft 12.7040 cf 403.7500 ft 5.9550 cf 405.5500 ft 13.1010 cf 403.8500 ft 6.3520 cf 405.6500 ft 13.4980 cf 405.7500 ft 13.8950 cf A-7 Record Id: 3 Section Shape: Circular Uniform Flow Method: Manning's Coefficient: 0.0130 Routing Method: Travel Time Translation DnNode CB #3 UpNode Downspout Material Plastic Size 6" Diam Ent Losses Groove End w/Headwall Length 72.0000 ft Slope 1.00% Up Invert 402.9700 ft Dn Invert 402.2500 ft Conduit Constraints Min Vel Max Vel Min Slope Max Slope Min Cover 2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr Up Invert 402.2500 ft Dn Invert 402.9700 ft Match inverts. DnNode CB #3 UpNode Downspout A-7 Eastern Portable – Eastern Roof Drain Contributing Area (ac) Proposed Impervious 0.02 Appended on: 09:15:12 Tuesday, April 19, 2016 ROUTEHYD [] THRU [Western Port - Western RD] USING Seattle AND [25 yr] NOTZERO RELATIVE RATIONAL Reach ID Area (ac) TC (min) Flow (cfs) Full Q (cfs) Full ratio nDepth (ft) Size nVel (ft/s) fVel (ft/s) CBasin / Hyd 4 0.0200 7.00 0.0460 0.5626 0.08 0.0967 6" Diam 1.7265 2.8654 Area 1 From Node To Node Rch Loss (ft) App (ft) Bend (ft) Junct Loss (ft) HW Loss Elev (ft) Max El (ft) 402.3750 Downspout CB #4 403.1152 ------ ------ ------ 403.1152 406.7000 A-7 Record Id: Area 4 Design Method Rational IDF Table: Seattle Composite C Calc Description SubArea Sub c Pavement and roofs (n=0.90) 0.02 ac 0.90 Directly Connected TC Calc Type Description Length Slope Coeff Misc TT Fixed 6.30 min Directly Connected TC 6.30min Record Id: Downspout Descrip: Prototype Record Increment 0.10 ft Start El. 402.9700 ft Max El. 406.7000 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 402.9700 ft 0.0000 cf 404.8700 ft 7.5430 cf 403.0700 ft 0.3970 cf 404.9700 ft 7.9400 cf 403.1700 ft 0.7940 cf 405.0700 ft 8.3370 cf 403.2700 ft 1.1910 cf 405.1700 ft 8.7340 cf 403.3700 ft 1.5880 cf 405.2700 ft 9.1310 cf 403.4700 ft 1.9850 cf 405.3700 ft 9.5280 cf 403.5700 ft 2.3820 cf 405.4700 ft 9.9250 cf 403.6700 ft 2.7790 cf 405.5700 ft 10.3220 cf 403.7700 ft 3.1760 cf 405.6700 ft 10.7190 cf 403.8700 ft 3.5730 cf 405.7700 ft 11.1160 cf 403.9700 ft 3.9700 cf 405.8700 ft 11.5130 cf 404.0700 ft 4.3670 cf 405.9700 ft 11.9100 cf 404.1700 ft 4.7640 cf 406.0700 ft 12.3070 cf 404.2700 ft 5.1610 cf 406.1700 ft 12.7040 cf A-7 404.3700 ft 5.5580 cf 406.2700 ft 13.1010 cf 404.4700 ft 5.9550 cf 406.3700 ft 13.4980 cf 404.5700 ft 6.3520 cf 406.4700 ft 13.8950 cf 404.6700 ft 6.7490 cf 406.5700 ft 14.2920 cf 406.7000 ft 14.8081 cf Record Id: CB #4 Descrip: Prototype Record Increment 0.10 ft Start El. 402.2500 ft Max El. 405.7500 ft Classification Catch Basin Structure Type CB-TYPE 1 Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector Catch 1.4160 ft Bottom Area 3.9700 sf Condition Existing Stage Storage Rating Curve 402.2500 ft 0.0000 cf 404.0500 ft 7.1460 cf 402.3500 ft 0.3970 cf 404.1500 ft 7.5430 cf 402.4500 ft 0.7940 cf 404.2500 ft 7.9400 cf 402.5500 ft 1.1910 cf 404.3500 ft 8.3370 cf 402.6500 ft 1.5880 cf 404.4500 ft 8.7340 cf 402.7500 ft 1.9850 cf 404.5500 ft 9.1310 cf 402.8500 ft 2.3820 cf 404.6500 ft 9.5280 cf 402.9500 ft 2.7790 cf 404.7500 ft 9.9250 cf 403.0500 ft 3.1760 cf 404.8500 ft 10.3220 cf 403.1500 ft 3.5730 cf 404.9500 ft 10.7190 cf 403.2500 ft 3.9700 cf 405.0500 ft 11.1160 cf 403.3500 ft 4.3670 cf 405.1500 ft 11.5130 cf 403.4500 ft 4.7640 cf 405.2500 ft 11.9100 cf 403.5500 ft 5.1610 cf 405.3500 ft 12.3070 cf 403.6500 ft 5.5580 cf 405.4500 ft 12.7040 cf 403.7500 ft 5.9550 cf 405.5500 ft 13.1010 cf 403.8500 ft 6.3520 cf 405.6500 ft 13.4980 cf 405.7500 ft 13.8950 cf A-7 Record Id: 4 Section Shape: Circular Uniform Flow Method: Manning's Coefficient: 0.0130 Routing Method: Travel Time Translation DnNode CB #4 UpNode Downspout Material Plastic Size 6" Diam Ent Losses Groove End w/Headwall Length 72.0000 ft Slope 1.00% Up Invert 402.9700 ft Dn Invert 402.2500 ft Conduit Constraints Min Vel Max Vel Min Slope Max Slope Min Cover 2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr Up Invert 402.2500 ft Dn Invert 402.9700 ft Match inverts. DnNode CB #4 UpNode Downspout PROJECTSITEA-8 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES This appendix contains the maintenance requirements for the following typical stormwater control facilities and components: No. 1 — Detention Ponds (p. A-2) No. 2 — Infiltration Facilities (p. A-3) No. 3 — Detention Tanks and Vaults (p. A-5) No. 4— Control Structure/Flow Restrictor (p. A-7) No. 5 — Catch Basins and Manholes (p. A-9) No. 6— Conveyance Pipes and Ditches (p. A-11) No. 7 — Debris Barriers (e.g., Trash Racks) (p. A-12) No. 8 — Energy Dissipaters (p. A- 13) No. 9 — Fencing (p. A-14) No. 10— Gates/Bollards/Access Barriers (p. A-15) No. 11 — Grounds (Landscaping) (p. A-16) No. 12— Access Roads (p. A-17) No. 13 — Basic Biofiltration Swale (grass) (p. A-18) No. 14— Wet Biofiltration Swale (p. A-19) No. 15 — Filter Strip (p. A-20) No. 16— Wetpond (p. A-21) No. 17— Wetvault (p. A-23) No. 18 — Stormwater Wetland (p. A-24) No. 19 — Sand Filter Pond (p. A-26) No. 20— Sand Filter Vault (p. A-28) No. 21 — Stormfilter (Cartridge Type) (p. A-30) No. 22— Baffle Oil/Water Separator (p. A-32) No. 23 — Coalescing Plate Oil/Water Separator (p. A-33) No. 24— Catch Basin Insert (p. A-35) 2009 Surface Water Design Manual — Appendix A 1/9/2009 A-1 A-14 A-9 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 5- CATCH BASINS AND MANHOLES Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed Structure Sediment Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Sump of catch basin contains no sediment. Trash and debris Trash or debris of more than % cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%. No Trash or debris blocking or potentially blocking entrance to catch basin. Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. No trash or debris in the catch basin. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). No dead animals or vegetation present within catch basin. Deposits of garbage exceeding 1 cubic foot in volume, No condition present which would attract or support the breeding of insects or rodents. Damage to frame and/or top slab Corner of frame extends more than % inch past curb face into the street (If applicable). Frame is even with curb. Top slab has holes larger than 2 square inches or cracks wider than % inch. Top slab is free of holes and cracks. Frame not sitting flush on top slab, i.e., separation of more than % inch of the frame from the top slab. Frame is sitting flush on top slab. Cracks in walls or bottom Cracks wider than 1/2 inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch basin is unsound. Catch basin is sealed and structurally sound. Cracks wider than 1/2 inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe. Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards. Damaged pipe joints Cracks wider than %-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet pipes. No cracks more than %-inch wide at the joint of inlet/outlet pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint, Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. Damaged Cracks wider than %-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than %-inch wide at the joint of the inlet/outlet pipe. 2009 Surface Water Design Manual — Appendix A 1/9/2009 A-9 A-14 A-9 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 5 - CATCH BASINS AND MANHOLES Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards. Trash and debris Trash and debris that is blocking more than 20% of grate surface, Grate free of trash and debris. footnote to guidelines for disposal Damaged or missing Grate missing or broken member(s) of the grate. Any open structure requires urgent maintenance. Grate is in place and meets design standards. Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance. Cover/lid protects opening to structure. Locking mechanism Not Working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to Remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift, Cover/lid can be removed and reinstalled by one maintenance person. 1/9/2009 2009 Surface Water Design Manual — Appendix A A-10 A-9 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 6- CONVEYANCE PIPES AND DITCHES Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes. Vegetation/roots Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint, Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe. Pipe repaired or replaced. Damaged Any dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Pipe repaired or replaced. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches. Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to County personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint, Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Vegetation Vegetation that reduces free movement of water through ditches. Water flows freely through ditches. Erosion damage to slopes Any erosion observed on a ditch slope. Slopes are not eroding. Rock lining out of place or missing (If Applicable) One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil. Replace rocks to design standards. 2009 Surface Water Design Manual — Appendix A 1/9/2009 A-11 A-14 A-9 APPENDIX A MAIN I ENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 11 - GROUNDS (LANDSCAPING) Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed Site Trash or litter Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Trash and debris cleared from site. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to County personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint, Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grass/groundcover Grass or groundcover exceeds 18 inches in height. Grass or groundcover mowed to a height no greater than 6 inches. Trees and Shrubs Hazard Any tree or limb of a tree identified as having a potential to fall and cause property damage or threaten human life. A hazard tree identified by a qualified arborist must be removed as soon as possible. No hazard trees in facility. Damaged Limbs or parts of trees or shrubs that are split or broken which affect more than 25% of the total foliage of the tree or shrub. Trees and shrubs with less than 5% of total foliage with split or broken limbs. Trees or shrubs that have been blown down or knocked over, No blown down vegetation or knocked over vegetation. Trees or shrubs free of injury. Trees or shrubs which are not adequately supported or are leaning over, causing exposure of the roots. Tree or shrub in place and adequately supported; dead or diseased trees removed. 1/9/2009 2009 Surface Water Design Manual — Appendix A A-16 A-14 A-9 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 24- CATCH BASIN INSERT Maintenance Component Defector Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed Media Insert Visible Oil Visible oil sheen passing through media Media inset replaced. Insert does not fit catch basin properly Flow gets into catch basin without going through media. All flow goes through media. Filter media plugged Filter media plugged. Flow through filter media is normal. Oil absorbent media saturated Media oil saturated. Oil absorbent media replaced. Water saturated Catch basin insert is saturated with water, which no longer has the capacity to absorb. Insert replaced. Service life exceeded Regular interval replacement due to typical average life of media insert product, typically one month. Media replaced at manufacturer's recommended interval. Seasonal maintenance When storms occur and during the wet season. Remove, clean and replace or install new insert after major storms, monthly during the wet season or at manufacturer's recommended interval. 2009 Surface Water Design Manual — Appendix A 1/9/2009 A-35 A-14 A-9 Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015 Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 206-296-6600 TTY Relay 711 Project Name: Date: Location: Project No.: Activity No.: Note: All prices include labor, equipment, materials, overhead and Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. _____________yes _______________x___no If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Maplewood Heights Elementary School Portables 130 Jericho Ave SE For alternate formats, call 206-296-6600. __________________ 4/18/2016 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015 Unit # of Reference #Price Unit Quantity Applications Cost EROSION/SEDIMENT CONTROL Number Backfill & compaction-embankment ESC-1 6.00$ CY 0 1 Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3)95.00$ CY Ditching ESC-4 9.00$ CY Excavation-bulk ESC-5 2.00$ CY 50 1 100 Fence, silt ESC-6 SWDM 5.4.3.1 1.50$ LF 300 1 450 Fence, Temporary (NGPE)ESC-7 1.50$ LF Hydroseeding ESC-8 SWDM 5.4.2.4 0.80$ SY 200 1 160 Jute Mesh ESC-9 SWDM 5.4.2.2 3.50$ SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 2.50$ SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 2.00$ SY Piping, temporary, CPP, 6"ESC-12 12.00$ LF Piping, temporary, CPP, 8"ESC-13 14.00$ LF Piping, temporary, CPP, 12"ESC-14 18.00$ LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 4.00$ SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-17 SWDM 5.4.4.1 1,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-18 SWDM 5.4.4.1 3,200.00$ Each 1 1 3200 Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 2,200.00$ Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 19.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 70.00$ LF Seeding, by hand ESC-22 SWDM 5.4.2.4 1.00$ SY Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5 8.00$ SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 10.00$ SY TESC Supervisor ESC-25 110.00$ HR Water truck, dust control ESC-26 SWDM 5.4.7 140.00$ HR WRITE-IN-ITEMS **** (see page 9) Each ESC SUBTOTAL:3,910.00$ 30% CONTINGENCY & MOBILIZATION:1,173.00$ ESC TOTAL:5,083.00$ COLUMN:A Page 2 of 9 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 1 2 3 4 56 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A B C D E F G H I J K L Existing Future Public Private Right-of-Way Right of Way Improvements Unit Price Unit Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI - 1 6.00$ CY Backfill & Compaction- trench GI - 2 9.00$ CY Clear/Remove Brush, by hand GI - 3 1.00$ SY Clearing/Grubbing/Tree Removal GI - 4 10,000.00$ Acre 0.42 4,200.00 Excavation - bulk GI - 5 2.00$ CY 94 188.00 Excavation - Trench GI - 6 5.00$ CY 66 330.00 Fencing, cedar, 6' high GI - 7 20.00$ LF Fencing, chain link, vinyl coated, 6' high GI - 8 20.00$ LF 20 400.00 Fencing, chain link, gate, vinyl coated, 20' GI - 9 1,400.00$ Each Fencing, split rail, 3' high GI - 10 15.00$ LF Fill & compact - common barrow GI - 11 25.00$ CY Fill & compact - gravel base GI - 12 27.00$ CY 20 540.00 Fill & compact - screened topsoil GI - 13 39.00$ CY Gabion, 12" deep, stone filled mesh GI - 14 65.00$ SY Gabion, 18" deep, stone filled mesh GI - 15 90.00$ SY Gabion, 36" deep, stone filled mesh GI - 16 150.00$ SY Grading, fine, by hand GI - 17 2.50$ SY Grading, fine, with grader GI - 18 2.00$ SY 177 354.00 Monuments, 3' long GI - 19 250.00$ Each Sensitive Areas Sign GI - 20 7.00$ Each Sodding, 1" deep, sloped ground GI - 21 8.00$ SY 200 1,600.00 Surveying, line & grade GI - 22 850.00$ Day Surveying, lot location/lines GI - 23 1,800.00$ Acre Traffic control crew ( 2 flaggers )GI - 24 120.00$ HR Trail, 4" chipped wood GI - 25 8.00$ SY Trail, 4" crushed cinder GI - 26 9.00$ SY Trail, 4" top course GI - 27 12.00$ SY Wall, retaining, concrete GI - 28 55.00$ SF Wall, rockery GI - 29 15.00$ SF Page 3 of 9 SUBTOTAL 7,612.00 & Drainage Facilities *KCC 27A authorizes only one bond reduction. 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 39 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 A B C D E F G H I J K L Existing Future Public Right-of-way Right of Way Improvements Unit Price Unit Quant.Cost Quant.Cost Quant.Cost ROAD IMPROVEMENT No. AC Grinding, 4' wide machine < 1000sy RI - 1 30.00$ SY AC Grinding, 4' wide machine 1000-2000syRI - 2 16.00$ SY AC Grinding, 4' wide machine > 2000sy RI - 3 10.00$ SY AC Removal/Disposal RI - 4 35.00$ SY Barricade, type III ( Permanent )RI - 6 56.00$ LF Curb & Gutter, rolled RI - 7 17.00$ LF Curb & Gutter, vertical RI - 8 12.50$ LF Curb and Gutter, demolition and disposal RI - 9 18.00$ LF Curb, extruded asphalt RI - 10 5.50$ LF Curb, extruded concrete RI - 11 7.00$ LF Sawcut, asphalt, 3" depth RI - 12 1.85$ LF 5 9.25 Sawcut, concrete, per 1" depth RI - 13 3.00$ LF 120 360.00 Sealant, asphalt RI - 14 2.00$ LF Shoulder, AC, ( see AC road unit price )RI - 15 -$ SY Shoulder, gravel, 4" thick RI - 16 15.00$ SY Sidewalk, 4" thick RI - 17 38.00$ SY Sidewalk, 4" thick, demolition and disposal RI - 18 32.00$ SY Sidewalk, 5" thick RI - 19 41.00$ SY Sidewalk, 5" thick, demolition and disposal RI - 20 40.00$ SY Sign, handicap RI - 21 85.00$ Each Striping, per stall RI - 22 7.00$ Each Striping, thermoplastic, ( for crosswalk )RI - 23 3.00$ SF Striping, 4" reflectorized line RI - 24 0.50$ LF Page 4 of 9 SUBTOTAL 369.25 Private & Drainage Facilities *KCC 27A authorizes only one bond reduction. 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 A B C D E F G H I J K L Existing Future Public Private Right-of-way Right of Way Improvements Unit Price Unit Quant.Cost Quant.Cost Quant.Cost ROAD SURFACING No. (4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course) Additional 2.5" Crushed Surfacing RS - 1 3.60$ SY HMA 1/2" Overlay, 1.5" RS - 2 14.00$ SY HMA 1/2" Overlay 2"RS - 3 18.00$ SY HMA Road, 2", 4" rock, First 2500 SY RS - 4 28.00$ SY 177 4,956.00 HMA Road, 2", 4" rock, Qty. over 2500 SY RS - 5 21.00$ SY HMA Road, 3", 9 1/2" Rock, First 2500 SY RS - 6 35.00$ SY HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SYRS - 7 42.00$ SY Not Used RS - 8 Not Used RS - 9 HMA Road, 6" Depth, First 2500 SY RS - 10 33.10$ SY HMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 30.00$ SY HMA 3/4" or 1", 4" Depth RS - 12 20.00$ SY Gravel Road, 4" rock, First 2500 SY RS - 13 15.00$ SY Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 10.00$ SY PCC Road (Add Under Write-Ins w/Design) RS - 15 Thickened Edge RS - 17 8.60$ LF Page 5 of 9 SUBTOTAL 4,956.00 & Drainage Facilities *KCC 27A authorizes only one bond reduction. 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 A B C D E F G H I J K L Existing Future Public Private Right-of-way Right of Way Improvements Unit Price Unit Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) Access Road, R/D D - 1 21.00$ SY Bollards - fixed D - 2 240.74$ Each Bollards - removable D - 3 452.34$ Each * (CBs include frame and lid) CB Type I D - 4 1,500.00$ Each 9 13,500.00 CB Type IL D - 5 1,750.00$ Each CB Type II, 48" diameter D - 6 2,300.00$ Each for additional depth over 4' D - 7 480.00$ FT CB Type II, 54" diameter D - 8 2,500.00$ Each for additional depth over 4'D - 9 495.00$ FT CB Type II, 60" diameter D - 10 2,800.00$ Each for additional depth over 4'D - 11 600.00$ FT CB Type II, 72" diameter D - 12 3,600.00$ Each for additional depth over 4'D - 13 850.00$ FT Through-curb Inlet Framework (Add)D - 14 400.00$ Each Cleanout, PVC, 4"D - 15 150.00$ Each Cleanout, PVC, 6"D - 16 170.00$ Each 18 3,060.00 Cleanout, PVC, 8"D - 17 200.00$ Each Culvert, PVC, 4"D - 18 10.00$ LF Culvert, PVC, 6"D - 19 13.00$ LF 515 6,695.00 Culvert, PVC, 8"D - 20 15.00$ LF Culvert, PVC, 12"D - 21 23.00$ LF Culvert, CMP, 8"D - 22 19.00$ LF Culvert, CMP, 12"D - 23 29.00$ LF Culvert, CMP, 15"D - 24 35.00$ LF Culvert, CMP, 18"D - 25 41.00$ LF Culvert, CMP, 24"D - 26 56.00$ LF Culvert, CMP, 30"D - 27 78.00$ LF Culvert, CMP, 36"D - 28 130.00$ LF Culvert, CMP, 48"D - 29 190.00$ LF Culvert, CMP, 60"D - 30 270.00$ LF Culvert, CMP, 72"D - 31 350.00$ LF Page 6 of 9 SUBTOTAL 23,255.00 & Drainage Facilities For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. *KCC 27A authorizes only one bond reduction. 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 A B C D E F G H I J K L Existing Future Public Private Right-of-way Right of Way Improvements DRAINAGE CONTINUED No.Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Culvert, Concrete, 8"D - 32 25.00$ LF Culvert, Concrete, 12"D - 33 36.00$ LF Culvert, Concrete, 15"D - 34 42.00$ LF Culvert, Concrete, 18"D - 35 48.00$ LF Culvert, Concrete, 24"D - 36 78.00$ LF Culvert, Concrete, 30"D - 37 125.00$ LF Culvert, Concrete, 36"D - 38 150.00$ LF Culvert, Concrete, 42"D - 39 175.00$ LF Culvert, Concrete, 48"D - 40 205.00$ LF Culvert, CPP, 6"D - 41 14.00$ LF Culvert, CPP, 8"D - 42 16.00$ LF Culvert, CPP, 12"D - 43 24.00$ LF Culvert, CPP, 15"D - 44 35.00$ LF Culvert, CPP, 18"D - 45 41.00$ LF Culvert, CPP, 24"D - 46 56.00$ LF Culvert, CPP, 30"D - 47 78.00$ LF Culvert, CPP, 36"D - 48 130.00$ LF Ditching D - 49 9.50$ CY Flow Dispersal Trench (1,436 base+)D - 50 28.00$ LF French Drain (3' depth)D - 51 26.00$ LF Geotextile, laid in trench, polypropylene D - 52 3.00$ SY Mid-tank Access Riser, 48" dia, 6' deep D - 54 2,000.00$ Each Pond Overflow Spillway D - 55 16.00$ SY Restrictor/Oil Separator, 12"D - 56 1,150.00$ Each Restrictor/Oil Separator, 15"D - 57 1,350.00$ Each Restrictor/Oil Separator, 18"D - 58 1,700.00$ Each Riprap, placed D - 59 42.00$ CY Tank End Reducer (36" diameter)D - 60 1,200.00$ Each Trash Rack, 12"D - 61 350.00$ Each Trash Rack, 15"D - 62 410.00$ Each Trash Rack, 18"D - 63 480.00$ Each Trash Rack, 21"D - 64 550.00$ Each Page 7 of 9 SUBTOTAL & Drainage Facilities *KCC 27A authorizes only one bond reduction. 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215216 217218 219 220 221 A B C D E F G H I J K L Existing Future Public Private Right-of-way Right of Way Improvements Unit Price Unit Quant.Price Quant.Cost Quant.Cost PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL - 1 21.00$ SY NA NA 2" AC, 1.5" top course & 2.5" base coursePL - 2 28.00$ SY NA NA 4" select borrow PL - 3 5.00$ SY NA NA 1.5" top course rock & 2.5" base course PL - 4 14.00$ SY NA NA UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate Utility Pole(s) Relocation UP-1 Street Light Poles w/Luminaires UP-2 Each WRITE-IN-ITEMS (Such as detention/water quality vaults.)No. WI - 1 Each WI - 2 SY WI - 3 CY WI - 4 LF WI - 5 FT WI - 6 WI - 7 WI - 8 WI - 9 WI - 10 SUBTOTAL SUBTOTAL (SUM ALL PAGES):36,192.25 30% CONTINGENCY & MOBILIZATION:10,857.68 GRANDTOTAL: 47,049.93 COLUMN:B C D Page 8 of 9 Lump Sum & Drainage Facilities Not To Be Used For Roads Or Shoulders *KCC 27A authorizes only one bond reduction. 20160418 Renton Bond Quantities Worksheet2.xls A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Original bond computations prepared by: Name:Date: PE Registration Number:Tel. #: Firm Name: Address:Project No: Stabilization/Erosion Sediment Control (ESC)(A) Existing Right-of-Way Improvements (B) Future Public Right of Way & Drainage Facilities (C) Private Improvements (D) Calculated Quantity Completed Total Right-of Way and/or Site Restoration Bond*/**(A+B) (First $7,500 of bond* shall be cash.) Performance Bond* Amount (A+B+C+D)= TOTAL (T)T x 0.30 Minimum is $2000.Minimum is $2000. Maintenance/Defect Bond* Total Minimum is $2000. NAME OF PERSON PREPARING BOND* REDUCTION:Date: * NOTE:The word "bond" as used in this document means a financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY FINANCIAL GUARANTEE REQUIREMENTS PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND* PERFORMANCE BOND* AMOUNT MINIMUM BOND* AMOUNT REQUIRED FOR RECORDING OR TEMPORARY OCCUPANCY AT SUBSTANTIAL COMPLETION *** -$ 5,083.0$ -$ -$ 15,639.9$ (B+C) x 0.25 = 5,083.0$ 47,049.9$ 52,132.9$ Page 9 of 9 20160418 Renton Bond Quantities Worksheet2.xls Check out the DDES Web site at www.kingcounty.gov/permits A-10 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 4/19/2016 4,514752 City of Renton Print map Template This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere Notes None 04/11/2016 Legend 512 0 256 512 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov City and County Boundary Other City of Renton Addresses Parcels Wellhead Protection Area Zones Zone 1 Zone 1 Modified Zone 2 Coalmine HIGH MODERATE UNCLASSIFIED Erosion hazard - high Floodway Special Flood Hazard Areas (100 year flood) Landslide VERY HIGH HIGH MODERATE UNCLASSIFED Slope City of Renton >15% & <=25% >25% & <=40% (Sensitive) >40% & <=90% (Protected) >90% (Protected) Faults Seismic Hazard Areas Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) Type S Type F Type Np Type Ns Wetlands 100' Primary 100' Intermediate 20' Primary 20' Intermediate 5' Primary 5' Intermediate 2' Primary 2' Intermediate Renton Fire Hydrant Hydrant Other System Water Gravity Pipe Water Main Water Service Areas Network Structures Inlet Manhole A-11