HomeMy WebLinkAboutTIR2016 D. R. STRONG Consulting Engineers Inc. The Pines
Technical Information Report Renton, Washington
TECHNICAL INFORMATION REPORT
for
THE PINES
PRELIMINARY PLAT
850 & 870 Monroe Avenue NE, Renton, Washington
NSER
ISSE
FORP
I
N
G
O
ER DETS REE N GINELA
53232
OIETATHSOY SF
OT
G
NIHASWIDEIPL.O C
BAD E
N
G
I
N
E
E
R
BAD
E
N
GI
N
E
E
R ILA
Z
____________________________________________________________________________
DRS Project No. 16007
Renton File No. LUA16-000413
Owner/Applicant
Harbour Homes, LLC
400 North 34th Street, Suite 300
Seattle, Washington 98103
Report Prepared by
D. R. STRONG Consulting Engineers, Inc.
620 7th Avenue
Kirkland, WA 98033
(425) 827-3063
Report Issue Date
July 19, 2016
2016 D. R. STRONG Consulting Engineers Inc. The Pines
Technical Information Report Renton, Washington
TECHNICAL INFORMATION REPORT
THE PINES PRELIMINARY PLAT
TABLE OF CONTENTS
SECTION I ...................................................................................................................... 1
Project Overview ......................................................................................................... 1
Predeveloped Site Conditions ..................................................................................... 1
Developed Site Conditions .......................................................................................... 1
SECTION II ................................................................................................................... 11
Conditions and Requirements Summary ................................................................... 11
Conditions of Approval............................................................................................... 13
SECTION III .................................................................................................................. 14
Off-Site Analysis ........................................................................................................ 14
Task 1: Define and Map Study Area ...................................................................... 15
Task 2: Resource Review ...................................................................................... 16
Task 3: Field Inspection ......................................................................................... 25
Task 4: Drainage System Description and Problem Descriptions .......................... 26
Task 5: Mitigation of Existing or Potential Problems .............................................. 29
SECTION IV .................................................................................................................. 35
Flow Control Analysis and Water Quality Design ...................................................... 35
Existing Site Hydrology .......................................................................................... 35
Developed Site Hydrology ...................................................................................... 37
Performance Standards ............................................................................................. 40
Flow Control System.................................................................................................. 41
Water Quality Treatment System ............................................................................... 47
SECTION V ................................................................................................................... 49
Conveyance System Analysis and Design ................................................................ 49
SECTION VI .................................................................................................................. 50
Special Reports and Studies ..................................................................................... 50
SECTION VII ................................................................................................................. 51
Other Permits, Variances and Adjustments ............................................................... 51
SECTION VIII ................................................................................................................ 52
CSWPPP Analysis and Design (Part A) .................................................................... 52
SWPPP Plan Design (Part B) .................................................................................... 52
SECTION IX .................................................................................................................. 54
Bond Quantities, Facility Summaries, and Declaration of Covenant .......................... 54
Stormwater Facility Summary Sheet.......................................................................... 55
2016 D. R. STRONG Consulting Engineers Inc. The Pines
Technical Information Report Renton, Washington
SECTION X ................................................................................................................... 57
Operations and Maintenance Manual ........................................................................ 57
APPENDICES ............................................................................................................... 58
Appendix “A” Legal Description ................................................................................. 59
List of Figures
Figure 1 TIR Worksheet .................................................................................................. 2
Figure 2 Vicinity Map ....................................................................................................... 7
Figure 3 Drainage Basins, Subbasins, and Site Characteristics ..................................... 8
Figure 4 Soils .................................................................................................................. 9
Figure 5 City of Renton Topography Map ..................................................................... 17
Figure 6 City of Renton Coal Mine Hazard Areas Map.................................................. 18
Figure 7 City of Renton Flood Hazards Map ................................................................. 19
Figure 8 City of Renton Streams and Wetlands Map .................................................... 20
Figure 9 City of Renton Landslide Hazards Map ........................................................... 21
Figure 10 City of Renton Seismic Hazard Areas Map ................................................... 22
Figure 11 FEMA Map .................................................................................................... 23
Figure 12 King County iMap Drainage Complaints Map................................................ 24
Figure 13 Offsite Analysis Downstream Map ................................................................ 30
Figure 14 Offsite Analysis Downstream Table .............................................................. 31
Figure 15 Predeveloped Area Map................................................................................ 36
Figure 16 Developed Area Map .................................................................................... 39
Figure 17 Detention & Water Quality Facility Details ..................................................... 48
2016 D. R. STRONG Consulting Engineers Inc. Page 1 The Pines
Technical Information Report Renton, Washington
SECTION I
PROJECT OVERVIEW
The Project is the proposed subdivision of two parcels into 14 single-family residential
lots, per the City of Renton’s (City) subdivision process. The Project is located at 850 &
870 Monroe Avenue NE, Renton, Washington (Site) also known as Tax Parcel Numbers
092305-9116, & -9117. The Project will meet the drainage requirements of the 2009
King County Surface Water Design Manual (Manual), as adopted by the City.
PREDEVELOPED SITE CONDITIONS
The total existing Site area is approximately 107,969 s.f. (2.48 acres). The Site is
currently developed with two single family homes, gravel driveways, one detached
garage, two sheds, a barn, and landscaping. The south-eastern portion of the Site
appears to be undisturbed and in a forested condition with light underbrush.
A high point exists at the eastern property line of the Site creating a shallow grade west
maintaining one Threshold Discharge Areas (TDA). Runoff generated by the TDA
gradually sheet flows east to west towards Monroe Avenue NE. The Natiral Discarge
Area (NDA) of the Site is runoff sheet flow over the west property line. Sheet flow is
captured by the curb and gutter located on the east side of Monroe Ave NE where
runoff then enters one of two, type 1 catch basins creating two downstream paths.
Runoff collected by the two catch basins is conveyed to a 24” diameter pipe where the
two downstream paths converge and flow south through the existing stormwater
system.
DEVELOPED SITE CONDITIONS
The applicant is seeking approval to subdivide 2.48 acres into 14 single–family
residential lots (Project), with lot sizes ranging from approximately 5,000 s.f. to 5,201 s.f.
All existing improvements located on the Site will be demolished or removed during plat
construction.
The project is required to provide level 2 flow control and basic water quality treatment.
The Site falls within the Peak Rate Flow Control Stadard area matching existing Site
conditions. The proposed impervious surface areas are as follows: frontage
improvements consisting of a 5’ sidwalk along Monroe Ave NE, Road A, the 14 new
single-family residences and their driveways, Tract B, and Tract D, the detention facility,
will generate approximately 64,927 s.f. of impervious area (1.49 acres). This
impervious area includes the bypass area, but excludes 2,914 s.f. of upstream tributary
area. The remainder of the developed Site will be modeled as till grass 41,487 s.f. (0.95
acre).
A small portion of ROW frontage on Monroe Ave NE, along the north half of the Site will
be bypass. Bypass runoff will continue along its current flow path and converge with the
Site runoff after detention, flowing south within the Monroe Ave NE conveyance system.
(See Section IV).
2016 D. R. STRONG Consulting Engineers Inc. Page 2 The Pines
Technical Information Report Renton, Washington
FIGURE 1
TIR WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner: Harbour Homes, LLC
Phone: (206) 315-8130
Address: 400 North 34th St, Suite 300
Seattle, WA 98103
Project Engineer: Yoshio L. Piediscalzi, P.E.
Company: D. R. STRONG Consulting
Engineers Inc.
Phone: (425) 827-3063
Project Name: The Pines
City Permit#: U 2016-0XXXX
Location:
Township: 23 North
Range: 05 East
Section: 09
Site Address: 850 & 870
Monroe Avenue NE
Renton, WA
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse Services
Subdivision / Short Subdivision / UPD
Building Services: M/F / Commercial / SFR
Clearing and Grading
Right-of-Way
Other:
DFW HPA Shoreline Mngmt
COE 404 Structural
DOE Dam Safety Rockery/Vault
FEMA Floodplain ESA Section 7
COE Wetlands
Other:
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Type of Drainage Review Full / Targeted /
(circle): Large Site
Date (include revision July 19th, 2016
dates):
Date of Final:
Site Improvement Plan (Engr. Plans)
Type (circle one): Full / Modified / :
Small Site
Date (include revision
dates):
Date of Final:
Part 6 ADJUSTMENT APPROVALS
Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket
Description: (include conditions in TIR Section 2)
_____________________________________________________________________________________
_____________________________________________________________________________________
____________________________________________________________________________________
Date of Approval:
2016 D. R. STRONG Consulting Engineers Inc. Page 3 The Pines
Technical Information Report Renton, Washington
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: TBD
Completion Date
Describe: Monitor discharge location
during construction.
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: Highlands
Special District Overlays: N/A
Drainage Basin: East Lake Washington – Renton
Stormwater Requirements: Level 2 Flow Control and Basic WQ treatment
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/ Stream
Lake
Wetlands
Closed Depression
Floodplain
Other
Steep Slope
Erosion Hazard
Landslide Hazard
Coal Mine Hazard
Seismic Hazard
Habitat Protection
Part 10 SOILS
Soil Type
AmC
Slopes
6-15%
Erosion Potential
Moderate to Severe
High Groundwater Table Sole Source Aquifer
other Seeps/Springs
Additional Sheets Attached
2016 D. R. STRONG Consulting Engineers Inc. Page 4 The Pines
Technical Information Report Renton, Washington
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core Requirement #2 – Offsite Analysis
SEPA
Additional Sheet Attached
LIMITATION / SITE CONSTRAINT
Part 12 TIR SUMMARY SHEET
Threshold Discharge Area: Site comprised of one TDA
(name or description)
Core Requirements (all 8 apply)
Discharge of Natural Location yes Number of Natural Discharge Locations: 1
Offsite Analysis Level: 1 / 2 / 3 dated: 03/21/16
Flow Control Level: 1 / 2 / 3 or Exemption Number
(incl. facility summary sheet Small Site BMPS N/A
Conveyance System Spill containment located at: TBD
Erosion and Sediment Control ESC Site Supervisor: T/B/D
Contact Phone: T/B/D
After Hours Phone: T/B/D
Maintenance and Operation Responsibility: Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Provided: Yes / No
Liability
Water Quality Type: Basic / Sens Lake / Enhanced Basic / Bog
(include facility summary sheet) or exemption No.
Landscape Management Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared / None
Requirements Name:
Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: N/A
Source Control Describe Landuse:
(comm. / industrial landuse) Describe any structural controls:
Oil Control High-use Site: Yes / No
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
2016 D. R. STRONG Consulting Engineers Inc. Page 5 The Pines
Technical Information Report Renton, Washington
Other Drainage Structures
Describe: Runoff will be collected and conveyed to the wet-vault detention facility
located in Tract D.
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust control
Flow Control
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize Exposed Surfaces
Remove and Restore Temporary ESC
Facilities
Clean and Remove All Silt and
Debris, Ensure Operations of
Permanent Facilities
Flag Limits of SAO and open space
Preservation areas
Other
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional
Facility
Shared Facility
Flow Control
BMPs
Other
Vault
Biofiltration
Wetpool
Media Filtration
Oil Control
Spill Control
Flow Control
BMPs
Other
Wet-vault
2016 D. R. STRONG Consulting Engineers Inc. Page 6 The Pines
Technical Information Report Renton, Washington
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other:
Cast in Place Vault
Retaining Wall
Rockery > 4’ High
Structural on Steep Slope
Other:
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate.
Signed/Date
2016 D. R. STRONG Consulting Engineers Inc. Page 7 The Pines
Technical Information Report Renton, Washington
FIGURE 2
VICINITY MAP
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,
or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on
this map. Any sale of this map or information on this map is prohibited except by written permission of King County.
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 8 The Pines
Technical Information Report Renton, Washington
FIGURE 3
DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
0GRAPHIC SCALE9060301 INCH = 60 FT.
2016 D. R. STRONG Consulting Engineers Inc. Page 9 The Pines
Technical Information Report Renton, Washington
FIGURE 4
SOILS
2016 D. R. STRONG Consulting Engineers Inc. Page 10 The Pines
Technical Information Report Renton, Washington
King County Area, Washington
AmC—Arents, Alderwood material, 6 to 15 percent slopes
Map Unit Setting
• National map unit symbol: 1hmsq
• Mean annual precipitation: 35 to 60 inches • Mean annual air temperature: 50 degrees F
• Frost-free period: 150 to 200 days
• Farmland classification: Not prime farmland
Map Unit Composition
• Arents, alderwood material, and similar soils: 100 percent
• Estimates are based on observations, descriptions, and transects of the map unit.
Description of Arents, Alderwood Material
Setting
• Landform: Till plains
• Parent material: Basal till
Typical profile
• H1 - 0 to 26 inches: gravelly sandy loam
• H2 - 26 to 60 inches: very gravelly sandy loam
Properties and qualities
• Slope: 6 to 15 percent
• Depth to restrictive feature: 20 to 40 inches to densic material
• Natural drainage class: Moderately well drained
• Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr)
• Depth to water table: About 16 to 36 inches
• Frequency of flooding: None
• Frequency of ponding: None • Available water storage in profile: Very low (about 2.3 inches)
Interpretive groups
• Land capability classification (irrigated): None specified
• Land capability classification (nonirrigated): 4s
• Hydrologic Soil Group: B/D
See Appendix B for Geotechnical Engineering Study
2016 D. R. STRONG Consulting Engineers Inc. Page 11 The Pines
Technical Information Report Renton, Washington
SECTION II
CONDITIONS AND REQUIREMENTS SUMMARY
The Project must comply with the following Core and Special Requirements:
• C.R. #1 – Discharge at the Natural Location: Existing drainage discharges the
Site at one location, maintaining one TDA. The topography indicates that all
stormwater runoff leaves the Site as sheet flow across the west property line.
Runoff is collected by the curb and gutter on the east side of Monroe Avenue NE.
• C.R. #2 – Offsite Analysis: Analysis is included in Section III. The Analysis
describes the Site’s runoff patterns in detail.
• C.R. #3 – Flow Control: The Project is required to adhere to Level 2 Flow Control
Standards. One detention/wetvault will provide flow control as required for the new
and replaced impervious and pervious surfaces. The Site is required to “match
developed discharge durations to existing conditions durations for the range of
predeveloped discharge rates from 50% of the two-year peak flow up to the full 50-
year peak flow. Also match developed peak discharge rates to predeveloped peak
discharge rates for the 2 and the 10 year return periods,” (City of Renton 2009
Surface Water Design Manual Amendment, Sec. 1.2.3.1). A detention vault will
accommodate this requirement.
• C.R. #4 – Conveyance System: New pipe systems are required to be designed
with sufficient capacity to convey and contain (at minimum) the 25-year peak flow,
assuming developed conditions for onsite tributary areas and existing conditions for
any offsite tributary areas. Pipe system structures may overtop for runoff events that
exceed the 25-year design capacity, provided the overflow from a 100-year runoff
event does not create or aggravate a “severe flooding problem” or “severe erosion
problem” as defined in C.R. #2. Any overflow occurring onsite for runoff events up to
and including the 100-year event must discharge at the natural location for the
project site. In residential subdivisions, such overflow must be contained within an
onsite drainage easement, tract, covenant or public right-of-way. This analysis will
be performed at time of construction plan preparation.
• C.R. #5 – Erosion and Sediment Control: The Project will provide the seven
minimum ESC measures. A temporary erosion and sedimentation control plan will
be prepared at the time construction plan preparation.
• C.R. #6 – Maintenance and Operations: Maintenance of the proposed storm
drainage facilities will be the responsibility of the City. An Operation and
Maintenance Manual will be included in Section X at the time of construction plan
preparation.
• C.R. #7 – Financial Guarantees: Prior to commencing construction, the Applicant
must post a drainage facilities restoration and site stabilization financial guarantee.
For any constructed or modified drainage facilities to be maintained and operated by
the City, the Applicant must: 1) Post a drainage defect and maintenance financial
guarantee for a period of two years, and 2) Maintain the drainage facilities during the
2016 D. R. STRONG Consulting Engineers Inc. Page 12 The Pines
Technical Information Report Renton, Washington
two-year period following posting of the drainage defect and maintenance financial
guarantee.
• C.R. #8 – Water Quality: The Project is required to provide basic water quality
treatment. A wetvault will accommodate this requirement.
• S.R. #1 – Other Adopted Area-Specific Requirements: Not applicable for this
Project.
• S.R. #2 – Floodplain/Floodway Delineation: Not applicable for this Project.
• S.R. #3 – Flood Protection Facilities: Not applicable for this Project.
• S.R. #4 – Source Control: Not applicable for this Project.
• S.R. #5 – Oil Control: Not applicable for this Project.
• S.R. #6 – Aquifer Protection Area: Site not located within zones 1 and 2, therefore
not applicable for this Project.
2016 D. R. STRONG Consulting Engineers Inc. Page 13 The Pines
Technical Information Report Renton, Washington
CONDITIONS OF APPROVAL
The Pines U 2016-0XXXX
TBD
2016 D. R. STRONG Consulting Engineers Inc. Page 14 The Pines
Technical Information Report Renton, Washington
SECTION III
OFF-SITE ANALYSIS
An offsite Level One Downstream Analysis was prepared by D.R. STRONG Consulting
Engineers Inc. and is included in this section.
2016 D. R. STRONG Consulting Engineers Inc. Page 15 The Pines
Level One Downstream Analysis Renton, Washington
LEVEL ONE DOWNSTREAM ANALYSIS
DISCLAIMER:
This report was prepared at the request of HARBOUR HOMES, llc for the 2.8 acre
parcel known as a portion of the SOUTHWEST Quarter of Section 09, Township 23
North, Range 5 East, W.M., in King County, Tax Parcel Numbers 092305-9116, & -9117
(Site). D. R. STRONG Consulting Engineers Inc. (DRS) has prepared this report for the
exclusive use of DRS, the owner, and their agents, for specific application to the
development project as described herein. Use or reliance on this report, or any of its
contents for any revisions of this project, or any other project, or by others not described
above, is forbidden without the expressed permission by DRS.
TASK 1: DEFINE AND MAP STUDY AREA
This Offsite Analysis was prepared in accordance with Core Requirement #2, Section
1.2.2 of the 2009 King County Surface Water Design Manual and City Amendments as
adopted by the City of Renton (Manual). The Site is located at 850 & 870 Monroe
Avenue NE, Renton, Washington. The Project is the subdivision of three parcels into 14
single-family lots.
See Figures 1, 2, 3, and 5 for maps of the study area.
2016 D. R. STRONG Consulting Engineers Inc. Page 16 The Pines
Level One Downstream Analysis Renton, Washington
TASK 2: RESOURCE REVIEW
• Adopted Basin Plans: The City of Renton and King County Department of
Development and Environmental Services (DDES) and Department of Natural
Resources and Parks (DNRP) do not have a specific plan for the East Lake
Washington Drainage Basin.
• Finalized Drainage Studies: No available applicable drainage studies at this time.
• Basin Reconnaissance Summary Reports: None available.
• Comprehensive Plans: Renton’s Comprehensive Plan, adopted on June 22, 2015,
effective July 1, 2015.
• Floodplain/Floodway (FEMA) Map: No floodplains exist on site, See Figure 10.
• Other Offsite Analysis Reports: Albert Balch’s President Park No. 7 & No. 8 and
Skyland Heights No. 2.
• Sensitive Areas Map Folios: See Figures 6-9.
• DNRP Drainage Complaints and Studies: Per King County Water and Land
Resources Division, there were no complaints within the downstream paths, within
approximately one mile from the Site within the last 10 years. See figure 11.
• USDA King County Soils Survey: See Figure 4
• Wetlands Inventory: Vol. 2 East (1990) – No wetlands identified along the
downstream paths in the KC Wetlands Inventory. The City of Renton Mapping
Applications indicates there are also no wetlands along the downstream path. See
Figure 8.
• Migrating River Studies: The Site is not located near the channel migration zones of
Cedar River, Tolt River, Raging River, Snoqualmie River, or Green River.
• King County Designated Water Quality Problems: Per the Washington State Water
Quality Assessment 303(d)/305(b) Integrated Report current as of 2012, there are
no water quality problems within 1 mile downstream of the Site.
2016 D. R. STRONG Consulting Engineers Inc. Page 17 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 5
CITY OF RENTON TOPOGRAPHY MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 18 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 6
CITY OF RENTON COAL MINE HAZARD AREAS MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 19 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 7
CITY OF RENTON FLOOD HAZARDS MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 20 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 8
CITY OF RENTON STREAMS AND WETLANDS MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 21 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 9
CITY OF RENTON LANDSLIDE HAZARDS MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 22 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 10
CITY OF RENTON SEISMIC HAZARD AREAS MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 23 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 11
FEMA MAP
Site
(Approximate)
2016 D. R. STRONG Consulting Engineers Inc. Page 24 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 12
KING COUNTY IMAP DRAINAGE COMPLAINTS MAP
Site
2016 D. R. STRONG Consulting Engineers Inc. Page 25 The Pines
Level One Downstream Analysis Renton, Washington
TASK 3: FIELD INSPECTION
UPSTREAM TRIBUTARY AREA
Upon evaluation of the upstream area through examining COR topographic map (see
Figure 5) and by conducting field reconnaissance on March 21st 2016, the upstream
tributary area for the Site is considered negligible. Runoff from the north and east is
captured by the developed single-family lots and conveyed to the existing conveyance
systems located in NE 9th St and Olympia Ave NE, respectively. Runoff from the south
is also collected by the developed single-family lots and conveyed to Monroe Ave NE
and south away from the Site.
GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTIONS
The Site is contained within one Threshold Discharge Area (TDA). Runoff from the Site
sheet flows over the west property line to the vertical curb and gutter located on the east
side of Monroe Avenue NE. Runoff then flows north via curb and gutter before being
collected by one of two catch basins. Runoff from each catch basin is conveyed to the
24” diameter pipe and catch basin conveyance system within Monroe Avenue NE,
which flows south towards NE 7th St. The conveyance system then turns west at NE 7th
St. and continues to flow that direction for over a quarter-mile downstream of the Site.
2016 D. R. STRONG Consulting Engineers Inc. Page 26 The Pines
Level One Downstream Analysis Renton, Washington
TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM
DESCRIPTIONS
DRAINAGE SYSTEM DESCRIPTION
The downstream analysis is further illustrated and detailed in the Downstream Map
Figure 12 and Downstream Table Figure 13. The drainage area is located within the
East Lake Washington - Renton Drainage Basin. The drainage area was evaluated by
reviewing available resources described in task 2, and by conducting a field
reconnaissance on March 21st, 2016 under rainy conditions.
DOWNSTREAM PATH 1
“A1” is the Natural Discharge Area (NDA) for path 1 from the TDA of the Site. It is
located along the western property line (±0).
From Point “A1” to Point “B1”, runoff continues to flow west as sheet flow over
approximately 7.5 feet of till grass and a 6-inch concrete curb. No concentrated flow
was observed (±0’-8’).
Point “B1”, runoff is collected by the concrete gutter located along the east side of
Monroe Avenue NE (±8’).
From Point “B1” to Point “C1”, runoff flows north as channel flow via vertical curb and
gutter. Light flow was observed (±8’-140’).
Point “C1”, runoff enters a Type 1 CB, Facility ID No. 136224 (±140’).
From Point “C1” to Point “D1”, runoff flows northwest as pipe flow via 8” PVC. Trickle
flow was observed (±140’-154’).
Point “D1”, runoff enters a Type 2 CB, Facility ID No. 136225 (±154’).
From Point “D1” to Point “E1”, runoff flows west as pipe flow via 12” CPEP/LCPE.
Moderate flow observed (±154’-182’).
Point “E1”, runoff enters a Type 2 CB, Facility ID No. 135946 (±182’).
From Point “E1” to Point “F1”, runoff flows south as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±182’-403’).
Point “F1”, runoff enters a Type 2 CB, Facility ID No 135945 (±403’).
From Point “F1” to Point “G1”, runoff flows south as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±403’-553’).
Point “G1”, runoff enters a Type 2 CB, Facility ID No 135942 (±553’).
From Point “G1” to Point “H1”, runoff flows south as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±553’-695’).
Point “H1”, runoff enters a Type 2 CB, Facility ID No 136001 (±695’).
From Point “H1” to Point “I1”, runoff flows south as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±695’-824’).
Point “I1”, runoff enters a Type 2 CB, Facility ID No 135998 (±824’).
2016 D. R. STRONG Consulting Engineers Inc. Page 27 The Pines
Level One Downstream Analysis Renton, Washington
From Point “I1” to Point “J1”, runoff flows south as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±824’-958’).
Point “J1”, runoff enters a Type 2 CB, Facility ID No 135996 (±958’).
From Point “J1” to Point “K1”, runoff flows south as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±958’-1,093’).
Point “K1”, runoff enters a Type 2 CB, Facility ID No 135994. COR Maps incorrectly
identifies the structure as a type 1 (±1,093’).
From Point “K1” to Point “L1”, runoff flows southwest as pipe flow via 24” CPEP/LCPE.
Moderate flow was observed (±1,093’-1,124’).
Point “L1”, runoff enters a Type 2 CB, Facility ID No 135993 (±1,124’).
From Point “L1” to Point “M1”, runoff flows westerly as pipe flow via 24” CPEP.
Moderate flow was observed (±1,124’-1,238’).
Point “M1”, runoff enters a Type 2 CB, Facility ID No 134697 (±1,238’).
From Point “M1” to Point “N1”, runoff flows westerly as pipe flow via 24” CPEP.
Moderate flow was observed (±1,238’-1,300’).
Point “N1”, runoff enters a Type 2 CB, Facility ID No 134696 (±1,300’).
From Point “N1” to Point “O1”, runoff flows westerly as pipe flow via 24” CPEP.
Moderate flow was observed (±1,300’-1,444’).
Point “O1”, runoff enters a Type 2 CB, Facility ID No 134695 (±1,444’).
From Point “O1” to Point “P1”, runoff flows southwesterly as pipe flow via 24” CPEP.
Moderate flow was observed (±1,444’-1,562’).
Point “P1”, runoff enters a Type 2 CB, Facility ID No 134693 (±1,562’).
From Point “P1” to Point “Q1”, runoff flows southwesterly as pipe flow via 24” CPEP.
Moderate flow was observed (±1,562’-1,625’).
Point “Q1”, runoff enters a Type 2 CB, Facility ID No 127707 located in the sidewalk
(±1,625’).
From Point “Q1” to Point “R1”, runoff flows southwest as pipe flow via 24” CPEP.
Moderate flow was observed (±1,625’-1,678’).
Point “R1”, runoff enters a Type 2 CB, Facility ID No 134691 (±1,678’).
From Point “R1” to Point “S1”, runoff flows westerly as pipe flow via 24” CPEP.
Moderate flow was observed (±1,678’-1,806’).
Point “S1”, runoff enters a Type 2 CB, Facility ID No 134688. This concluded the
quarter-mile downstream reconnaissance (±1,806’).
DOWNSTREAM PATH 2
“A2” is the Natural Discharge Area (NDA) for path 2 from the TDA of the Site. It is
located along the west property line of parcel 092305-9116 (±0’).
2016 D. R. STRONG Consulting Engineers Inc. Page 28 The Pines
Level One Downstream Analysis Renton, Washington
From Point “A2” to Point “B2”, runoff continues to flow west as sheet flow over
approximately 7.5 feet of till grass and a 6-inch concrete curb. No concentrated flow
was observed (±0’-8’).
Point “B2”, runoff is collected by the concrete gutter located along the east side of
Monroe Avenue NE (±8’).
Point “B2” to Point “C2”, runoff flows north as channel flow via vertical curb and gutter.
Light flow was observed (±8’-108’).
Point “C2”, runoff enters a Type 1 CB, Facility ID No. 135944 (±108’).
From Point “C2” to Point “F1”, runoff flows west as pipe flow via 8” PVC. Light flow was
observed (±108’-134’).
Point “F1”, runoff enters a Type 2 CB, Facility ID No. 135945 where runoff from
downstream path 2 converges with runoff downstream path 1 (±134’).
2016 D. R. STRONG Consulting Engineers Inc. Page 29 The Pines
Level One Downstream Analysis Renton, Washington
TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
A review of the King County Water and Land Resources Division – Drainage Services
Section Documented Drainage Complaints within one mile of the downstream flow
paths revealed no complaints within the last ten years.
The project should not create any problems as specified in Section 1.2.2.1 of the
Manual and therefore is not required to provide Drainage Problem Impact Mitigation
subject to the requirements of Section 1.2.2.2.
A wetvault will provide flow control and basic water quality requirements for the entire
Site. During construction, standard sediment and erosion control methods will be
utilized. This will include the use of a stabilized construction entrance, perimeter silt
fencing, and other necessary measures to minimize soil erosion during construction.
2016 D. R. STRONG Consulting Engineers Inc. Page 30 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 13
OFFSITE ANALYSIS DOWNSTREAM MAP
2016 D. R. STRONG Consulting Engineers Inc. Page 31 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 14
OFFSITE ANALYSIS DOWNSTREAM TABLE
DOWNSTREAM PATH 1
Symbol Drainage
Component Type,
Name, and Size
Drainage Component
Description
Slope Distance
From site
Discharge
Existing
Problems
Potential
Problems
Observations of field inspector
resource reviewer, or resident
See map
Type: sheet flow, swale,
Stream, channel, pipe,
Pond; Size: diameter
Surface area
drainage basin, vegetation, cover,
depth, type of sensitive area, volume
%
1/4 mile =
1,320 feet
Constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation, incision, other
erosion
Tributary area, likelihood of problem,
overflow pathways, potential impacts.
A1 Natural discharge area Runoff exits at the NDA along the western
property line of the Site.
–0’ None Observed None Anticipated No concentrated flow observed
A1-B1 West sheet flow Sheet flow over till grass and 6” curb None Observed None Anticipated No concentrated flow observed
B1 6” Vertical curb and
gutter
East side of Monroe Avenue NE –8’ None Observed None Anticipated Light flow observed
B1-C1 North channel flow 6” concrete vertical curb and gutter None Observed None Anticipated Light flow observed
C1 Type 1 CB Renton Facility No. 136224 ±140’ None Observed None Anticipated Light flow observed
C1-D1 Northwest pipe flow 8” Ø PVC None Observed None Anticipated Light flow observed
D1 Type 2 CB Renton Facility No. 136225 ±154’ None Observed None Anticipated Light flow observed
D1-E1 West pipe flow 12” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
E1 Type 2 CB Renton Facility No. 135946 ±182’ None Observed None Anticipated Moderate flow observed
E1-F1 South pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
F1 Type 2 CB Renton Facility No. 135945 ±403’ None Observed None Anticipated Moderate flow observed
F1-G1 South pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
2016 D. R. STRONG Consulting Engineers Inc. Page 32 The Pines
Level One Downstream Analysis Renton, Washington
G1 Type 2 CB Renton Facility No. 135942 ±553’ None Observed None Anticipated Moderate flow observed
G1-H1 South pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
H1 Type 2 CB Renton Facility No. 136001 ±695’ None Observed None Anticipated Moderate flow observed
H1-I1 South pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
I1 Type 2 CB Renton Facility No. 135998 ±824’ None Observed None Anticipated Moderate flow observed
I1-J1 South pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
J1 Type 2 CB Renton Facility No. 135996 ±958’ None Observed None Anticipated Moderate flow observed
J1-K1 South pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
K1 Type 2 CB Renton Facility No. 135994 ±1,093’ None Observed None Anticipated Moderate flow observed
K1-L1 Southwest pipe flow 24” Ø CPEP/LCPE None Observed None Anticipated Moderate flow observed
L1 Type 2 CB Renton Facility No. 135993 ±1,124’ None Observed None Anticipated Moderate flow observed
L1-M1 Westerly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
M1 Type 2 CB Renton Facility No. 134697 ±1,238’ None Observed None Anticipated Moderate flow observed
M1-N1 Westerly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
N1 Type 2 CB Renton Facility No. 134696 ±1,300’ None Observed None Anticipated Moderate flow observed
N1-O1 Westerly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
O1 Type 2 CB Renton Facility No. 134695 ±1,444’ None Observed None Anticipated Moderate flow observed
O1-P1 Southwesterly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
2016 D. R. STRONG Consulting Engineers Inc. Page 33 The Pines
Level One Downstream Analysis Renton, Washington
DOWNSTREAM PATH 2
P1 Type 2 CB Renton Facility No. 134693 ±1,562’ None Observed None Anticipated Moderate flow observed
P1-Q1 Southwesterly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
Q1 Type 2 CB Renton Facility No. 134692 located in the
sidewalk
±1,625’ None Observed None Anticipated Moderate flow observed
Q1-R1 Southwesterly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
R1 Type 2 CB Renton Facility No. 134691 ±1,678’ None Observed None Anticipated Moderate flow observed
R1-S1 Westerly pipe flow 24” Ø CPEP None Observed None Anticipated Moderate flow observed
S1 Type 2 CB Renton Facility No. 134688. This was the
end of the field reconnaissance at over ¼
mile downstream from the Site.
±1,806’ None Observed None Anticipated Moderate flow observed
Symbol Drainage
Component Type,
Name, and Size
Drainage Component
Description
Slope Distance
From site
Discharge
Existing
Problems
Potential
Problems
Observations of field inspector
resource reviewer, or resident
See map
Type: sheet flow, swale,
Stream, channel, pipe,
Pond; Size: diameter
Surface area
drainage basin, vegetation, cover,
depth, type of sensitive area, volume
%
1/4 mi=1,320
ft
Constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation, incision, other
erosion
Tributary area, likelihood of problem,
overflow pathways, potential impacts.
A1 Natural discharge area Runoff exits at NDA along the western
property line of parcel 092305-116.
–0’ None Observed None Anticipated No concentrated flow observed
A1-B1 West sheet flow Sheet flow over till grass and 6” curb None Observed None Anticipated No concentrated flow observed
B1 6” Vertical curb and
gutter
East side of Monroe Avenue NE –8’ None Observed None Anticipated Light flow observed
B1-C1 North channel flow 6” concrete vertical curb and gutter None Observed None Anticipated Light flow observed
C1 Type 1 CB Renton Facility No. 135944 ±108’ None Observed None Anticipated Light flow observed
2016 D. R. STRONG Consulting Engineers Inc. Page 34 The Pines
Level One Downstream Analysis Renton, Washington
C1-F1 West pipe flow 8” Ø PVC None Observed None Anticipated Light flow observed
F1 Type 2 CB Renton Facility No. 135945. Downstream
path 2 combines with downstream path.
–134’ None Observed None Anticipated No concentrated flow observed
2016 D. R. STRONG Consulting Engineers Inc. Page 35 The Pines
Technical Information Report Renton, Washington
SECTION IV
FLOW CONTROL ANALYSIS AND WATER QUALITY DESIGN
EXISTING SITE HYDROLOGY
KCRTS was used to model runoff from the Site. The Site falls within the Peak Rate
Flow Control Stadard area matching existing Site conditions. The Site was modeled
with existing forested, pasture and impervious surfaces (see figure 15). Results of the
KCRTS analysis are included in this section.
Modeling Input for the TDA
Pre-Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.181 2 2/09/01 18:00 0.310 1 100.00 0.990
0.077 7 1/05/02 16:00 0.181 2 25.00 0.960
0.170 3 2/28/03 3:00 0.170 3 10.00 0.900
0.030 8 8/26/04 2:00 0.160 4 5.00 0.800
0.097 6 1/05/05 8:00 0.153 5 3.00 0.667
0.160 4 1/18/06 16:00 0.097 6 2.00 0.500
0.153 5 11/24/06 4:00 0.077 7 1.30 0.231
0.310 1 1/09/08 6:00 0.030 8 1.10 0.091
Computed Peaks 0.267 50.00 0.980
2016 D. R. STRONG Consulting Engineers Inc. Page 36 The Pines
Technical Information Report Renton, Washington
FIGURE 15
PREDEVELOPED AREA MAP
0GRAPHIC SCALE9060301 INCH = 60 FT.
2016 D. R. STRONG Consulting Engineers Inc. Page 37 The Pines
Technical Information Report Renton, Washington
DEVELOPED SITE HYDROLOGY
Soil Type
The soil types are unchanged from predeveloped conditions.
Land covers
KCRTS was used to model the developed peak runoff from the Site. The portions of the
Site within the developable area tributary to the proposed detention facility were
modeled as “Till Grass”, and Impervious as appropriate. Results of the KCRTS analysis
are included in this section.
Modeling Input for DEV Site of the TDA
Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.459 6 2/09/01 2:00 0.930 1 100.00 0.990
0.373 8 1/05/02 16:00 0.586 2 25.00 0.960
0.552 3 2/27/03 7:00 0.552 3 10.00 0.900
0.403 7 8/26/04 2:00 0.487 4 5.00 0.800
0.485 5 10/28/04 16:00 0.485 5 3.00 0.667
0.487 4 1/18/06 16:00 0.459 6 2.00 0.500
0.586 2 10/26/06 0:00 0.403 7 1.30 0.231
0.930 1 1/09/08 6:00 0.373 8 1.10 0.091
Computed Peaks 0.815 50.00 0.980
2016 D. R. STRONG Consulting Engineers Inc. Page 38 The Pines
Technical Information Report Renton, Washington
Modeling Input for the Bypass of the TDA
Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.004 4 2/09/01 2:00 0.008 1 100.00 0.990
0.003 7 1/05/02 16:00 0.005 2 25.00 0.960
0.005 2 2/27/03 7:00 0.004 3 10.00 0.900
0.003 8 8/26/04 2:00 0.004 4 5.00 0.800
0.004 5 10/28/04 16:00 0.004 5 3.00 0.667
0.004 6 1/18/06 16:00 0.004 6 2.00 0.500
0.004 3 10/26/06 0:00 0.003 7 1.30 0.231
0.008 1 1/09/08 6:00 0.003 8 1.10 0.091
Computed Peaks 0.007 50.00 0.980
2016 D. R. STRONG Consulting Engineers Inc. Page 39 The Pines
Technical Information Report Renton, Washington
FIGURE 16
DEVELOPED AREA MAP
0GRAPHIC SCALE9060301 INCH = 60 FT.
2016 D. R. STRONG Consulting Engineers Inc. Page 40 The Pines
Technical Information Report Renton, Washington
PERFORMANCE STANDARDS
The Site is required to adhere to Level 2 Flow Control Standards of the existing site
conditions (reference 11-A of COR 2009 Surface Water Design Manual Amendment). A
wet-vault will provide flow control and basic water quality treatment. The Project is
required to “match developed discharge durations to predeveloped durations for the
range of predeveloped discharge rates from 50% of the 2-year peak flow up to the full
50-year peak flow. Also match developed peak discharge rates to predeveloped peak
discharge rates for the 2- and 10-year return periods. Assume existing site conditions
as the predeveloped condition” (2009 Surface Water Design Manual Amendment, Sec.
1.2.3.1).
2016 D. R. STRONG Consulting Engineers Inc. Page 41 The Pines
Technical Information Report Renton, Washington
FLOW CONTROL SYSTEM
The Project will utilize an detention facility designed to control site runoff. The King
County Runoff Time Series (KCRTS) software was used to size the facility. The
detention pond design information is included in this section.
Retention/Detention Facility
Type of Facility: Detention Vault
Facility Length: 56.06 ft
Facility Width: 56.06 ft
Facility Area: 3143. sq. ft
Effective Storage Depth: 7.50 ft
Stage 0 Elevation: 383.00 ft
Storage Volume: 23570. cu. ft
Riser Head: 7.50 ft
Riser Diameter: 18.00 inches
Number of orifices: 3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.93 0.064
2 4.30 1.24 0.075 4.0
3 6.00 1.10 0.040 4.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 383.00 0. 0.000 0.000 0.00
0.01 383.01 31. 0.001 0.002 0.00
0.02 383.02 63. 0.001 0.003 0.00
0.03 383.03 94. 0.002 0.004 0.00
0.04 383.04 126. 0.003 0.005 0.00
0.05 383.05 157. 0.004 0.005 0.00
0.06 383.06 189. 0.004 0.006 0.00
0.07 383.07 220. 0.005 0.006 0.00
0.08 383.08 251. 0.006 0.006 0.00
0.22 383.22 691. 0.016 0.011 0.00
0.37 383.37 1163. 0.027 0.014 0.00
0.52 383.52 1634. 0.038 0.017 0.00
0.67 383.67 2106. 0.048 0.019 0.00
0.81 383.81 2546. 0.058 0.021 0.00
0.96 383.96 3017. 0.069 0.023 0.00
1.11 384.11 3488. 0.080 0.025 0.00
1.25 384.25 3928. 0.090 0.026 0.00
1.40 384.40 4400. 0.101 0.028 0.00
1.55 384.55 4871. 0.112 0.029 0.00
1.69 384.69 5311. 0.122 0.030 0.00
1.84 384.84 5783. 0.133 0.032 0.00
1.99 384.99 6254. 0.144 0.033 0.00
2.14 385.14 6725. 0.154 0.034 0.00
2.28 385.28 7165. 0.164 0.035 0.00
2.43 385.43 7637. 0.175 0.036 0.00
2.58 385.58 8108. 0.186 0.038 0.00
2.72 385.72 8548. 0.196 0.039 0.00
2.87 385.87 9020. 0.207 0.040 0.00
3.02 386.02 9491. 0.218 0.041 0.00
3.17 386.17 9962. 0.229 0.042 0.00
3.31 386.31 10402. 0.239 0.043 0.00
2016 D. R. STRONG Consulting Engineers Inc. Page 42 The Pines
Technical Information Report Renton, Washington
3.46 386.46 10874. 0.250 0.043 0.00
3.61 386.61 11345. 0.260 0.044 0.00
3.75 386.75 11785. 0.271 0.045 0.00
3.90 386.90 12257. 0.281 0.046 0.00
4.05 387.05 12728. 0.292 0.047 0.00
4.19 387.19 13168. 0.302 0.048 0.00
4.30 387.30 13514. 0.310 0.048 0.00
4.31 387.31 13545. 0.311 0.049 0.00
4.33 387.33 13608. 0.312 0.050 0.00
4.34 387.34 13639. 0.313 0.051 0.00
4.35 387.35 13671. 0.314 0.054 0.00
4.36 387.36 13702. 0.315 0.057 0.00
4.38 387.38 13765. 0.316 0.060 0.00
4.39 387.39 13797. 0.317 0.061 0.00
4.40 387.40 13828. 0.317 0.062 0.00
4.42 387.42 13891. 0.319 0.063 0.00
4.56 387.56 14331. 0.329 0.071 0.00
4.71 387.71 14802. 0.340 0.077 0.00
4.86 387.86 15274. 0.351 0.083 0.00
5.00 388.00 15714. 0.361 0.087 0.00
5.15 388.15 16185. 0.372 0.092 0.00
5.30 388.30 16656. 0.382 0.095 0.00
5.45 388.45 17128. 0.393 0.099 0.00
5.59 388.59 17568. 0.403 0.103 0.00
5.74 388.74 18039. 0.414 0.106 0.00
5.89 388.89 18511. 0.425 0.109 0.00
6.00 389.00 18856. 0.433 0.112 0.00
6.01 389.01 18888. 0.434 0.112 0.00
6.02 389.02 18919. 0.434 0.113 0.00
6.03 389.03 18951. 0.435 0.115 0.00
6.05 389.05 19013. 0.436 0.116 0.00
6.06 389.06 19045. 0.437 0.119 0.00
6.07 389.07 19076. 0.438 0.122 0.00
6.08 389.08 19108. 0.439 0.123 0.00
6.09 389.09 19139. 0.439 0.123 0.00
6.24 389.24 19611. 0.450 0.132 0.00
6.39 389.39 20082. 0.461 0.140 0.00
6.53 389.53 20522. 0.471 0.146 0.00
6.68 389.68 20993. 0.482 0.152 0.00
6.83 389.83 21465. 0.493 0.157 0.00
6.97 389.97 21905. 0.503 0.162 0.00
7.12 390.12 22376. 0.514 0.167 0.00
7.27 390.27 22848. 0.525 0.172 0.00
7.42 390.42 23319. 0.535 0.176 0.00
7.50 390.50 23570. 0.541 0.179 0.00
7.60 390.60 23885. 0.548 0.644 0.00
7.70 390.70 24199. 0.556 1.490 0.00
7.80 390.80 24513. 0.563 2.590 0.00
7.90 390.90 24828. 0.570 3.890 0.00
8.00 391.00 25142. 0.577 5.360 0.00
8.10 391.10 25456. 0.584 6.790 0.00
8.20 391.20 25770. 0.592 7.320 0.00
8.30 391.30 26085. 0.599 7.810 0.00
8.40 391.40 26399. 0.606 8.280 0.00
8.50 391.50 26713. 0.613 8.710 0.00
8.60 391.60 27027. 0.620 9.130 0.00
8.70 391.70 27342. 0.628 9.530 0.00
8.80 391.80 27656. 0.635 9.920 0.00
8.90 391.90 27970. 0.642 10.280 0.00
9.00 392.00 28285. 0.649 10.640 0.00
9.10 392.10 28599. 0.657 10.980 0.00
9.20 392.20 28913. 0.664 11.320 0.00
9.30 392.30 29227. 0.671 11.640 0.00
2016 D. R. STRONG Consulting Engineers Inc. Page 43 The Pines
Technical Information Report Renton, Washington
9.40 392.40 29542. 0.678 11.960 0.00
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 0.93 0.78 7.62 390.62 23936. 0.549
2 0.46 0.19 7.50 390.50 23578. 0.541
3 0.46 0.15 6.71 389.71 21077. 0.484
4 0.49 0.11 5.92 388.92 18607. 0.427
5 0.55 0.11 5.83 388.83 18330. 0.421
6 0.29 0.07 4.55 387.55 14299. 0.328
7 0.37 0.04 3.67 386.67 11528. 0.265
8 0.40 0.04 2.87 385.87 9034. 0.207
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflow Inflow Target Calc
1 0.78 0.01 ******** ******* 0.79
2 0.19 0.00 ******** 0.18 0.19
3 0.15 0.00 ******** ******* 0.15
4 0.11 0.00 ******** ******* 0.11
5 0.11 0.00 ******** ******* 0.11
6 0.07 0.00 ******** ******* 0.07
7 0.04 0.00 ******** ******* 0.04
8 0.04 0.00 ******** ******* 0.04
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.930 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.779 CFS at 9:00 on Jan 9 in Year 8
Peak Reservoir Stage: 7.62 Ft
Peak Reservoir Elev: 390.62 Ft
Peak Reservoir Storage: 23936. Cu-Ft
: 0.549 Ac-Ft
Add Time Series:bypass.tsf
Peak Summed Discharge: 0.785 CFS at 9:00 on Jan 9 in Year 8
Point of Compliance File:dsout.tsf
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) (ft) Period
0.190 2 2/09/01 20:00 0.779 7.62 1 100.00 0.990
0.044 7 12/28/01 18:00 0.190 7.50 2 25.00 0.960
0.108 5 3/06/03 22:00 0.153 6.71 3 10.00 0.900
0.040 8 8/26/04 7:00 0.110 5.92 4 5.00 0.800
0.070 6 1/05/05 16:00 0.108 5.83 5 3.00 0.667
0.110 4 1/18/06 23:00 0.070 4.55 6 2.00 0.500
0.153 3 11/24/06 7:00 0.044 3.67 7 1.30 0.231
0.779 1 1/09/08 9:00 0.040 2.87 8 1.10 0.091
Computed Peaks 0.583 7.59 50.00 0.980
Flow Frequency Analysis
Time Series File:dsout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
2016 D. R. STRONG Consulting Engineers Inc. Page 44 The Pines
Technical Information Report Renton, Washington
(CFS) (CFS) Period
0.191 2 2/09/01 20:00 0.785 1 100.00 0.990
0.045 7 12/28/01 17:00 0.191 2 25.00 0.960
0.109 5 3/06/03 22:00 0.154 3 10.00 0.900
0.040 8 8/26/04 4:00 0.110 4 5.00 0.800
0.071 6 1/05/05 16:00 0.109 5 3.00 0.667
0.110 4 1/18/06 22:00 0.071 6 2.00 0.500
0.154 3 11/24/06 7:00 0.045 7 1.30 0.231
0.785 1 1/09/08 9:00 0.040 8 1.10 0.091
Computed Peaks 0.587 50.00 0.980
Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.003 36907 60.188 60.188 39.812 0.398E+00
0.008 5849 9.538 69.726 30.274 0.303E+00
0.013 4941 8.058 77.784 22.216 0.222E+00
0.019 4147 6.763 84.547 15.453 0.155E+00
0.024 3386 5.522 90.068 9.932 0.993E-01
0.029 2465 4.020 94.088 5.912 0.591E-01
0.035 1399 2.281 96.370 3.630 0.363E-01
0.040 848 1.383 97.753 2.247 0.225E-01
0.045 723 1.179 98.932 1.068 0.107E-01
0.051 349 0.569 99.501 0.499 0.499E-02
0.056 16 0.026 99.527 0.473 0.473E-02
0.061 25 0.041 99.568 0.432 0.432E-02
0.067 34 0.055 99.623 0.377 0.377E-02
0.072 27 0.044 99.667 0.333 0.333E-02
0.077 19 0.031 99.698 0.302 0.302E-02
0.083 16 0.026 99.724 0.276 0.276E-02
0.088 18 0.029 99.754 0.246 0.246E-02
0.093 21 0.034 99.788 0.212 0.212E-02
0.099 23 0.038 99.826 0.174 0.174E-02
0.104 26 0.042 99.868 0.132 0.132E-02
0.109 30 0.049 99.917 0.083 0.832E-03
0.115 10 0.016 99.933 0.067 0.669E-03
0.120 1 0.002 99.935 0.065 0.652E-03
0.125 5 0.008 99.943 0.057 0.571E-03
0.131 4 0.007 99.949 0.051 0.506E-03
0.136 3 0.005 99.954 0.046 0.457E-03
0.141 3 0.005 99.959 0.041 0.408E-03
0.147 3 0.005 99.964 0.036 0.359E-03
0.152 5 0.008 99.972 0.028 0.277E-03
0.157 5 0.008 99.980 0.020 0.196E-03
0.163 2 0.003 99.984 0.016 0.163E-03
0.168 2 0.003 99.987 0.013 0.130E-03
0.173 3 0.005 99.992 0.008 0.815E-04
0.179 4 0.007 99.998 0.002 0.163E-04
0.184 0 0.000 99.998 0.002 0.163E-04
0.189 0 0.000 99.998 0.002 0.163E-04
Flow Duration from Time Series File:dsout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.003 36925 60.217 60.217 39.783 0.398E+00
0.008 5859 9.555 69.772 30.228 0.302E+00
0.013 4974 8.112 77.883 22.117 0.221E+00
0.019 4001 6.525 84.408 15.592 0.156E+00
0.024 3417 5.572 89.980 10.020 0.100E+00
0.030 2495 4.069 94.049 5.951 0.595E-01
0.035 1411 2.301 96.350 3.650 0.365E-01
0.040 854 1.393 97.743 2.257 0.226E-01
0.046 717 1.169 98.912 1.088 0.109E-01
2016 D. R. STRONG Consulting Engineers Inc. Page 45 The Pines
Technical Information Report Renton, Washington
0.051 356 0.581 99.493 0.507 0.507E-02
0.056 21 0.034 99.527 0.473 0.473E-02
0.062 24 0.039 99.566 0.434 0.434E-02
0.067 34 0.055 99.622 0.378 0.378E-02
0.072 30 0.049 99.671 0.329 0.329E-02
0.078 15 0.024 99.695 0.305 0.305E-02
0.083 19 0.031 99.726 0.274 0.274E-02
0.088 15 0.024 99.750 0.250 0.250E-02
0.094 20 0.033 99.783 0.217 0.217E-02
0.099 25 0.041 99.824 0.176 0.176E-02
0.104 27 0.044 99.868 0.132 0.132E-02
0.110 28 0.046 99.914 0.086 0.864E-03
0.115 12 0.020 99.933 0.067 0.669E-03
0.121 1 0.002 99.935 0.065 0.652E-03
0.126 4 0.007 99.941 0.059 0.587E-03
0.131 5 0.008 99.949 0.051 0.506E-03
0.137 2 0.003 99.953 0.047 0.473E-03
0.142 3 0.005 99.958 0.042 0.424E-03
0.147 4 0.007 99.964 0.036 0.359E-03
0.153 5 0.008 99.972 0.028 0.277E-03
0.158 5 0.008 99.980 0.020 0.196E-03
0.163 2 0.003 99.984 0.016 0.163E-03
0.169 1 0.002 99.985 0.015 0.147E-03
0.174 4 0.007 99.992 0.008 0.815E-04
0.179 3 0.005 99.997 0.003 0.326E-04
0.185 1 0.002 99.998 0.002 0.163E-04
0.190 0 0.000 99.998 0.002 0.163E-04
Duration Comparison Anaylsis
Base File: predev.tsf
New File: dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change
0.048 | 0.77E-02 0.62E-02 -18.9 | 0.77E-02 0.048 0.048 -1.1
0.059 | 0.57E-02 0.46E-02 -18.7 | 0.57E-02 0.059 0.049 -16.6
0.069 | 0.45E-02 0.36E-02 -18.6 | 0.45E-02 0.069 0.060 -12.2
0.079 | 0.33E-02 0.30E-02 -9.0 | 0.33E-02 0.079 0.073 -7.2
0.089 | 0.25E-02 0.24E-02 -0.7 | 0.25E-02 0.089 0.089 -0.1
0.099 | 0.18E-02 0.18E-02 -1.8 | 0.18E-02 0.099 0.099 -0.4
0.109 | 0.13E-02 0.86E-03 -32.9 | 0.13E-02 0.109 0.105 -4.1
0.120 | 0.95E-03 0.65E-03 -31.0 | 0.95E-03 0.120 0.109 -8.9
0.130 | 0.65E-03 0.51E-03 -22.5 | 0.65E-03 0.130 0.122 -6.1
0.140 | 0.46E-03 0.42E-03 -7.1 | 0.46E-03 0.140 0.139 -0.7
0.150 | 0.23E-03 0.31E-03 35.7 | 0.23E-03 0.150 0.155 3.0
0.160 | 0.16E-03 0.20E-03 20.0 | 0.16E-03 0.160 0.165 3.0
0.170 | 0.49E-04 0.11E-03 133.3 | 0.49E-04 0.170 0.178 4.5
0.181 | 0.16E-04 0.16E-04 0.0 | 0.16E-04 0.181 0.191 5.8
Maximum positive excursion = 0.010 cfs ( 6.7%)
occurring at 0.153 cfs on the Base Data:predev.tsf
and at 0.163 cfs on the New Data:dsout.tsf
Maximum negative excursion = 0.013 cfs (-19.9%)
occurring at 0.063 cfs on the Base Data:predev.tsf
and at 0.050 cfs on the New Data:dsout.tsf
2016 D. R. STRONG Consulting Engineers Inc. Page 46 The Pines
Technical Information Report Renton, Washington
Flow Frequency
Duration Analysis
2016 D. R. STRONG Consulting Engineers Inc. Page 47 The Pines
Technical Information Report Renton, Washington
WATER QUALITY TREATMENT SYSTEM
The Project is required to adhere to the City of Renton’s Basic Water Quality treatment
criteria. A combined detention/water quality vault located within Tract D is proposed to
accommodate this requirement.
Preliminary sizing for a wetvault was calculated from the formula provided by Section
6.4.1.1 Methods of Analysis of the Manual. The minimum wetpool volume required is
8,327 cubic feet. The Project will provide 15,785 cubic feet of dead storage.
2016 D. R. STRONG Consulting Engineers Inc. Page 48 The Pines
Technical Information Report Renton, Washington
FIGURE 17
DETENTION & WATER QUALITY FACILITY DETAILS
(To be completed at time of final engineering)
2016 D. R. STRONG Consulting Engineers Inc. Page 49 The Pines
Technical Information Report Renton, Washington
SECTION V
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Per Core Requirement #4 of the KCSWDM, the conveyance system must be analyzed
and designed for the existing tributary and developed onsite runoff. Pipe systems shall
be designed to convey the 100-year design storm. The Rational Method will be used to
calculate the Q-Ratio for each pipe node.
A conveyance system consisting primarily of pipes and catch basins will be designed for
the Project. Onsite runoff will be collected by the multiple catch basins. Pipes are
typically eight-inch to twelve-inch diameter LCPE material.
A backwater analysis will be provided at time of final engineering.
2016 D. R. STRONG Consulting Engineers Inc. Page 50 The Pines
Technical Information Report Renton, Washington
SECTION VI
SPECIAL REPORTS AND STUDIES
The following report and studies have been provided with this submittal.
Wetland Memo: Re-Align Environmental – April 21st, 2016
Geotechnical Engineering Study: Earth Solutions NW, LLC – April 27, 2016
Traffic Memorandum: Gibson Traffic Consultants, Inc. – May 9, 2016
Arborist Report: Creative Landscape Solutions – July 17, 2016
2016 D. R. STRONG Consulting Engineers Inc. Page 51 The Pines
Technical Information Report Renton, Washington
SECTION VII
OTHER PERMITS, VARIANCES AND ADJUSTMENTS
• Hammerhead turnaround approval at the end of internal Road A, by Corey
Thomas, dated April 6, 2016.
2016 D. R. STRONG Consulting Engineers Inc. Page 52 The Pines
Technical Information Report Renton, Washington
SECTION VIII
CSWPPP ANALYSIS AND DESIGN (PART A)
The Erosion and Sedimentation Control Design will meet the seven minimum King
County requirements:
1. Areas to remain undisturbed shall be delineated with a high visibility plastic fence
prior to any site clearing or grading.
2. Site disturbed areas shall be covered with mulch and seeded, as appropriate, for
temporary or permanent measures.
3. Perimeter protection shall consist of a silt fence down slope of any disturbed areas
or stockpiles.
4. A stabilized construction entrance will be located at the point of ingress/egress (i.e.
onsite access road).
5. The detention pond will act as a sediment pond for sediment retention. Perimeter
silt fences will provide sediment retention within the bypass areas.
6. Surface water from disturbed areas will sheet flow to the sediment pond for
treatment.
7. Dust control shall be provided by spraying exposed soils with water until wet. This is
required when exposed soils are dry to the point that wind transport is possible
which would impact roadways, drainage ways, surface waters, or neighboring
residences.
SWPPP PLAN DESIGN (PART B)
Construction activities that could contribute pollutants to surface and storm water
include the following, with applicable BMP’s listed for each item:
1. Storage and use of chemicals: Utilize source control, and soil erosion and
sedimentation control practices, such as using only recommended amounts of
chemical materials applied in the proper manner; neutralizing concrete wash
water, and disposing of excess concrete material only in areas prepared for
concrete placement, or return to batch plant; disposing of wash-up waters from
water-based paints in sanitary sewer; disposing of wastes from oil-based paints,
solvents, thinners, and mineral spirits only through a licensed waste
management firm, or treatment, storage, and disposal (TSD) facility.
2. Material delivery and storage: Locate temporary storage areas away from
vehicular traffic, near the construction entrance, and away from storm drains.
Material Safety Data Sheets (MSDS) should be supplied for all materials stored,
and chemicals kept in their original labeled containers. Maintenance, fueling,
and repair of heavy equipment and vehicles shall be conducted using spill
prevention and control measures. Contaminated surfaces shall be cleaned
immediately following any spill incident. Provide cover, containment, and
protection from vandalism for all chemicals, liquid products, petroleum products,
and other potentially hazardous materials.
2016 D. R. STRONG Consulting Engineers Inc. Page 53 The Pines
Technical Information Report Renton, Washington
3. Building demolition: Protect stormwater drainage system from sediment-laden
runoff and loose particles. To the extent possible, use dikes, berms, or other
methods to protect overland discharge paths from runoff. Street gutter,
sidewalks, driveways, and other paved surfaces in the immediate area of
demolition must be swept daily to collect and properly dispose of loose debris
and garbage. Spray the minimum amount of water to help control windblown fine
particles such as concrete, dust, and paint chips. Avoid excessive spraying so
that runoff from the site does not occur, yet dust control is achieved. Oils must
never be used for dust control.
4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent
migration offsite and must not remain on permanent concrete or asphalt paving
overnight. Collected slurry and cuttings shall be disposed of in a manner that
does not violate ground water or surface water quality standards.
The complete CSWPPP will be completed and submitted at time of final of engineering.
2016 D. R. STRONG Consulting Engineers Inc. Page 54 The Pines
Technical Information Report Renton, Washington
SECTION IX
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
1. Bond Quantity Worksheet – will be submitted at final engineering
2. The Stormwater Facility Summary Sheet is included in this section
2016 D. R. STRONG Consulting Engineers Inc. Page 55 The Pines
Technical Information Report Renton, Washington
STORMWATER FACILITY SUMMARY SHEET
Development The Pines Date July 19, 2016
Location: 850 & 870 Monroe Ave NE, Renton, Washington 98056
ENGINEER DEVELOPER
Name Yoshio L Piediscalzi, P.E. Name Jamie Waltier
Firm D. R. STRONG Consulting
Engineers, Inc.
Firm Harbour Homes, LLC
Address 620 7th Avenue Address 400 North 34th St, Suite 300
Kirkland, WA 98033 Seattle, WA 98103
Phone (425) 827-3063 Phone (206) 315-8130
Developed Site: 2.509 acres
Number of lots: 14
Number of detention facilities on site: Number of infiltration facilities on site:
___1__ vaults ______ vaults
______ pond ______ ponds
______ tanks ______ tanks
Flow control provided in regional facility (give location)___________________________
No flow control required_____ Exemption number ______________________________
Downstream Drainage Basins
Immediate Major Basin
Basin Renton East Lake Washington
Number & type of water quality facilities on site:
biofiltration swale (regular/wet/ or continuous inflow?)
______ sand filter (basic or large?) ______ sand filter, linear (basic or
large?) ______ CONTECH Stormfilter
__1___ combined detention/WQ vault ______ sand filter vault (basic or large?)
______ combined detention/wetpond ______ stormwater wetland
______ compost filter ______ wetvault (basic or large?)
______ filter strip ______ Wetvault
______ flow dispersion ______ pre-settling pond
______ farm management plan ______ flow-splitter catchbasin
______ landscape management plan
______ oil/water separator (baffle or coalescing plate?)
______ catch basin inserts:
Manufacturer____________________________________________
______ pre-settling structure:
Manufacturer__________________________________________
2016 D. R. STRONG Consulting Engineers Inc. Page 56 The Pines
Technical Information Report Renton, Washington
DESIGN INFORMATION INDIVIDUAL BASIN
Water Quality design flow
Water Quality treated volume
Drainage basin(s) 1
Onsite area (includes frontage) 2.4424
Offsite area 0.0668
Type of Storage Facility Detention
Vault
Live Storage Volume (required) 23,570
Predev Runoff Rate 2-year 0.097
10-year 0.170
100-year 0.310
Developed Runoff Rate 2-year 0.071
(includes bypass) 10-year 0.154
100-year 0.785
Type of Restrictor
Size of orifice/restriction No. 1 0.93” Ø 0.00’
No. 2 1.24” Ø 4.30’
No. 3 1.10” Ø 6.00’
2016 D. R. STRONG Consulting Engineers Inc. Page 57 The Pines
Technical Information Report Renton, Washington
SECTION X
OPERATIONS AND MAINTENANCE MANUAL
Excerpts from the 2009 KCSWDM will be provided at final engineering.
2016 D. R. STRONG Consulting Engineers Inc. Page 58 The Pines
Technical Information Report Renton, Washington
APPENDICES
2016 D. R. STRONG Consulting Engineers Inc. Page 59 The Pines
Technical Information Report Renton, Washington
APPENDIX “A” LEGAL DESCRIPTION
THE SOUTH 2 ACRES OF THE NORTH 4 ACRES OF THE SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 9,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON;
EXCEPT THE EAST 130 FEET THEREOF; AND EXCEPT THE WEST 30 FEET FOR
MONROE AVENUE N.E.; ALSO
THE NORTH 2 ACRES OF THE SOUTHWEST QUARTER OF THE SOUTHWEST
QUARTER OF THE NORTHEAST QUARTER OF SECTION 9, TOWNSHIP 23
NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON; EXCEPT THE
WEST 30 FEET FOR COUNTY ROAD; EXCEPT THE EAST 130 FEET THEREOF;
AND EXCEPT THE NORTH 48 FEET.