HomeMy WebLinkAboutShoreline Tracking Worksheet - 1 - 09/13
H:\PROJECTS\2015\08-August\150809 - Renton SECO Shoreline\Documents\Permitting\City of Renton\August 2016 SSDP
submittal\Shoreline Tracking Worksheet.docx
City of Renton Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
The City of Renton is required by the Washington State Department of Ecology to track and evaluate the
effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with
respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline
Master Program report every eight years to comply with the Shoreline Management Act requirements.
SHORELINE STABILIZATION
1. Is there currently a bulkhead on your site? Yes No; If yes, fill out table below.
If no, see “Site Conditions”, Section 2 below.
What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard
Materials:
Concrete Ecology blocks, timber sheet piles,
rounded timber piles, and walers
580
Linear Feet of Soft
Materials:
0
Examples of Types of Bulkheads: Hard (e.g. rocks, wood; Soft (e.g. sand, plants);
Combination-soft materials at the water with hard materials furtherer inland, or a
combination of hard and soft materials at the water.
SITE CONDITIONS
2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g.
2,000 sq. ft. house, 125 sq. ft. greenhouse).
There are four existing multi-family residential buildings on the site, with approximate
footprints ranging from 10,000 to 14,000 square feet. The hotel that is currently under
construction has a footprint of approximately 36,000 square feet.
3. List distance (in feet) from the water to the closest point of each structure. List each
building separately (e.g. shed, dock, carport).
The hotel and residential buildings are approximately 40-feet landward of the OHWM.
SHORELINE TRACKING
WORKSHEET
- 2 - 09/13
H:\PROJECTS\2015\08-August\150809 - Renton SECO Shoreline\Documents\Permitting\City of Renton\August 2016 SSDP
submittal\Shoreline Tracking Worksheet.docx
4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area,
walkway, patio).
Essentially the entire shoreline area is covered with impervious surfaces (90%+). This
includes concrete and pavers.
5. List distance (in feet) from the water to the closest point of each impervious surface (hard
surface.
An impervious promenade/walkway is located immediately adjacent to bulkhead.
6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in
square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care
or grown for decorative purposes) should not be counted.
A small amount (<300 SF) of invasive vegetation is present in the extreme northeast
corner of the project area, adjacent to Gene Coulon Park. Species include Himalayan
blackberry and reed canarygrass.
7. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in
square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care
or grown for decorative purposes) should not be counted.
No new vegetation is proposed.
8. Will the project require any added fill? If so, how many cubic yards will be added:
A small amount of concrete (approximately 66 cubic yards – 562 square feet) will be poured
as part of bulkhead repair activities. WDFW may also mandate the placement of clean
gravel/sand in areas where piles are extracted. Otherwise, no grading will occur as part of
the proposed project.
- 3 - 09/13
H:\PROJECTS\2015\08-August\150809 - Renton SECO Shoreline\Documents\Permitting\City of Renton\August 2016 SSDP
submittal\Shoreline Tracking Worksheet.docx
IN WATER AND OVER WATER STRUCTURES
9. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring
piles, boatlifts)? Yes No; If yes, fill out the table below.
Describe the in and over water structures on your site
Type
(e.g. dock, float, bridge,
mooring pile, boat lift,
etc.)
Surface Area
(in square feet, if
applicable)
Light Penetrating Materials
(the percentage of the
surface area that is made of
material that allows light to
reach the water)
Existing
structures
to remain
-Eastern wood deck
-Central wood deck
-Western wood wharf
-680 SF
-2,600 SF
-4,000 SF
-0%
-0%
-0%
Existing
structures
that will
be
removed
-Portions of western
wood wharf
----Finger pier
----Ell
-Piles
-85 SF
-140 SF
-121 total
-N/A
-N/A
-N/A
Proposed
structures
-Eastern float
-Western float
-Bulkhead apron
-2,013 SF
-528 SF
-1,312 SF
-Fully grated
-Fully grated
-Fully grated