Loading...
HomeMy WebLinkAboutI-405 SR 167 Direct Connect Noise Variance Schedule UpdateRohini, Consistent with requirements in the Examiner's decision regarding our Project's noise variance, between Monday December 5, 2016 and December 23, 2016 we will be drilling at various locations in the project limits. Each location will take one to two nights to complete. This is a start of a new nighttime activity so baseline ambient noise and activity noise measurements will be taken. Thanks, Dan Sharpe, PE GUY F. ATKINSON CONSTRUCTION 707 S Grady Way #500 l Renton, WA l 98057 c.206.200.5137, Dan.sharpe@atkn.com