Loading...
HomeMy WebLinkAboutFailing Rooftop SASeptember 11, 2015 Ms. Andy Pereira B+T Group Ryka Communications, LLC 1717 S. Boulder, Suite 300 918 S. Horton St., Ste 1002 Tulsa, OK 74119 Seattle, WA 98134 (918) 587-4630 (206) 523-1941 btwo@btgrp.com Subject: Structural Analysis Carrier Designation: Carrier Site Number: 11566-A Carrier Site Name: Cedar River Ryka Communication, Designation: Site Number: SD24 Site Name: Cedar River Engineering Firm Designation: B+T Group Project Number: 90141.002.01a Site Data: 2439 Southeast Maple Valley Highway, Renton, WA, King County Latitude 47.47750°, Longitude -122.18694° Rooftop Mounted Antennas at 20’ Dear Andy Pereira, B+T Group is pleased to submit this “Structural Analysis” to determine the structural integrity of the above mentioned rooftop supported telecommunications site. The purpose of the analysis is to determine acceptability of the existing rooftop and building to sufficiently support the telecommunications equipment presented in this report. Based on our analysis we have determined the suitability for the structure and foundation, under the following load case, to be: Existing + Proposed Equipment Insufficient Capacity Note: See Table 1 and Table 2 for the proposed and existing loading, respectively. Requires Modification design for Antenna mounting frame The analysis has been performed in accordance with the Seattle Building Code, the ASCE 7 standard, and the 2012 IBC based upon a wind speed of 110 mph 3-second gust. All equipment proposed in this report shall be installed in accordance with the drawings for the determined available structural capacity to be effective. We at B+T Group appreciate the opportunity of providing our continuing professional services to you and Ryka communications. If you have any questions or need further assistance on this or any other projects please give us a call. Respectfully submitted by: B+T Engineering, Inc. Nabin Maharjan. E.I. John W. Kelly, P.E., S.E. Project Engineer Vice President September 11, 2015 Structural Analysis Site No. SD24 Project Number 90141.002.01a, Cedar River Page 1 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 - Proposed Antenna and Cable Information Table 2 - Existing and Reserved Antenna and Cable Information 3) ANALYSIS PROCEDURE Table 3 - Documents Provided 3.1) Analysis Method 3.2) Assumptions 4) ANALYSIS RESULTS 4.1) Recommendations 5) APPENDIX A September 11, 2015 Structural Analysis Site No. SD24 Project Number 90141.002.01a, Cedar River Page 2 1) INTRODUCTION The proposed telecommunications equipment will be located on the roof of an existing one story building. There are existing telecommunications antennas mounted on two sector frame mounts. The proposed loading consists of removing the existing sector frame mounts and installing all existing and proposed antennas on the new tripod mounts. Two of the existing antennas will be removed and four proposed antennas and their associated equipment will be installed. 2) ANALYSIS CRITERIA The structural analysis was performed for this structure in accordance with the 2012 International Building Code and the ASCE 7 Design Standard. The TIA-222-G apply to telecommunications towers. Although telecommunications equipment is present, this structure is primarily a building and is more appropriately assessed with the ASCE 7 Standard. The design wind speed for this location is 110 mph 3-second gust. Table 1 - Proposed Antenna and Cable Information Mounting Level (ft) Number of Antennas Antenna Manufacturer Antenna Model Number of Feed Lines Feed Line Type Note 20 2 Commscope SBNHH-1D65C -- -- -- 4 Alcatel Lucent RRH4x25-WCS 2 Alcatel Lucent 3JR52703AAAA Table 2 - Existing and Reserved Antenna and Cable Information Mounting Level (ft) Number of Antennas Antenna Manufacturer Antenna Model Number of Feed Lines Feed Line Type Note 20 3 Kathrein 742-264 14 1 5/8” Equipment to be Relocated 1 Powerwave 7780 6 -- LGP 21401 2 Nokia MHA CS72993.08 2 -- 700MHz RRH 2 Fiber 2 -- DC2 SSU 4 DC 1 Kathrein 80010764_716 -- -- Equipment to be Removed 1 Kathrein 80010766_716 2 -- Ballasted Rooftop Mounts 3) ANALYSIS PROCEDURE Table 3 - Documents Provided Document Remarks Reference Source Photos -- Date: 06/16/2015 B+T Group Structural Inspection Report -- Date: 07/02/2015 B+T Group Existing Loading RFDS Date: 06/23/2014 Ryka Proposed Loading Structural Analysis By PTS LLC Date: 05/28/2009 Ryka CD’s By Morrison Hershfield Date: 07/13/2011 Ryka September 11, 2015 Structural Analysis Site No. SD24 Project Number 90141.002.01a, Cedar River Page 3 3.1) Analysis Method This building currently supports telecommunications equipment. Two antennas will be removed and (4) new antennas will be added. Calculations were run on multiple mounting options with all returning the same result. The existing rooftop is insufficient for this proposed loading. A site inspection revealed the rooftop construction to be different than what was previously reported. Even without any additional loading from telecommunications equipment, the roof structure does not meet code requirements. 3.2) Assumptions 1) The structure was built in accordance with the designer’s specifications. 2) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified in Tables 1 and 2 and the referenced drawings. 3) Existing loading was assumed based on final proposed loading. This analysis may be affected if any assumptions are not valid or have been made in error. B+T Group should be notified to determine the effect on the structural integrity of the structure. 4) ANALYSIS RESULTS 4.1) Recommendations 1) The support system for the telecommunications equipment is structurally insufficient at this site. 2) All existing telecommunications equipment should be removed from the existing structure. 3) It is our recommendation that a new wood laminate pole be installed for the mounting of the proposed loading. September 11, 2015 Structural Analysis Site No. SD24 Project Number 90141.002.01a, Cedar River Page 4 APPENDIX A ADDITIONAL CALCULATIONS B&T Engineering, Inc. NM 90141.002.01a Cedar River SD24 SK - 1 Sept 11, 2015 at 9:30 AM RISA Model.r3d Y XZ Envelope Only Solution B&T Engineering, Inc. NM 90141.002.01a Cedar River SD24 SK - 2 Sept 11, 2015 at 9:30 AM RISA Model.r3dPIPE_2.5PIPE_2.5PIPE_3.0PIPE_2.5 PIPE_2.5PIPE_2.5PIPE_2.5 PIPE_2.5PIPE_2.5PIPE_2.5PIPE_2.5PIPE_3.0PIPE_2.5 PIPE_2.5PIPE_2.5PIPE_2.5 PIPE_2.5 PIPE_2.5 PIPE_2.5PIPE_2.5PIPE_3.0PIPE_3.0PIPE_2.5PIPE_2.5PIPE_2.5PIPE_2.5 PIPE_2.5PIPE_2.5L2x2x4PIPE_3.0PIPE_2.5PIPE_3.0PIPE_2.5 PIPE_2.5 PIPE_2.5 PIPE_2.5PIPE_2.5PIPE_2.5PIPE_2.5PIPE_2.5PIPE_3.0PIPE_2.5 PIPE_2.5 PIPE_2.5 PIPE_2.5PIPE_2.5 PIPE_3.0PIPE_2.5L 2 x 2 x 4 PIPE_2.5 PIPE_2.5PIPE_2.5 PIPE_3.0PIPE_2.5PIPE_2.5PIPE_2.5PIPE_2.5 PIPE_2.5 PIPE_2.5 PIPE_2.5PIPE_2.5 PIPE_2.5PIPE_3.0PIPE_2.5 PIPE_2.5 PIPE_3.0PIPE_2.5PIPE_2.5PIPE_2.5PIPE_2.5 PIPE_2.5PIPE_2.5 PIPE_3.0PIPE_2.5 PIPE_2.5 PIPE_2.5PIPE_2.5Y XZ Envelope Only Solution B&T Engineering, Inc. NM 90141.002.01a Cedar River SD24 SK - 3 Sept 11, 2015 at 9:31 AM RISA Model.r3d.08.06.16.21 .10.07.21 .10.08.08.06NC.16.21NC .10.07.27 .21 .23 .06.10.16.67.07.08.08.27 .23.06.35.16.08NC.16.27 .21NC.23 .11.10.07.06.07.16.27 .21 NC.23 .08.10 .67NC.03.3 7 .21 .03.10 .67.08.11.07.27 .21 .23 .06.10 .03.67.27 NC.23 .67NC.03.08.03.27 .11.23 .67.27 .23 .03.03Y XZ Code Check No Calc > 1.0.90-1.0.75-.90.50-.75 0.-.50 Maps 47.4775, -122.18694 SD24 Cedar River Page 1 of 1Print - Maps 9/9/2015http://www.bing.com/maps/print.aspx?mkt=en-us&z=20&s=h&cp=47.477318,-122.186613...