HomeMy WebLinkAbout03-21-16 PSE Talbot - Mech Permit SetMECHANICAL GENERAL NOTES 1.FOR TRANSFER DUCT DETAIL SEE DETAIL 2 SHEET M2-1. ALL TRANSFER DUCTS SHALL BE INTERNALLY LINED. 2.DUCTWORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 23 33 00. 3.CONTRACTOR SHALL CAREFULLY COORDINATE WORK W/ ALL OTHER TRADES, ESPECIALLY IN CEILING SPACES WHERE SPACE IS TIGHT. SHEET METAL CONTRACTOR SHALL HAVE PRIORITY OVER OTHER MECHANICAL TRADES IN CEILING SPACE WHERE CONFLICTS OCCUR. 4.ALL DUCTWORK SHOWN IS SCHEMATIC, CONTRACTOR SHALL PROVIDE ALL OFFSETS/ELBOWS AS REQ'D TO ALLOW ROUTING AROUND STRUCTURE, ELECTRICAL, & OTHER INTERFERENCES. 5.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE & SELECT FINAL LOCATIONS OF ALL AIR INLETS/OUTLETS. SHIFT AIR INLETS/ OUTLETS FROM LOCATIONS SHOWN AS REQ'D TO AVOID CONFLICTS W/ STRUCTURE, LIGHTS, & OTHER ITEMS. SUCH SHIFTS SHALL MAINTAIN SYMMETRY OF AIR TERMINALS & SHALL HAVE PRIOR APPROVAL OF ARCHITECT/ENGINEER. 6.FOR SUSPENDED EQUIP. SUPPORTS, SEE DETAIL 1 SHEET M2-1. 7.UNSIZED DUCTS SHALL MATCH THE SIZE OF THE LARGEST ADJACENT DUCT THAT IS SIZED. WHERE THE ADJACENT DUCT SIZE IS NOT SHOWN, PROVIDE THE FOLLOWING SIZED DUCTS (OR EQUIVALENT RECTANGULAR). 8.VERIFY LOCATIONS OF ITEMS INSTALLED IN CEILINGS WITH ARCHITECTURAL REFLECTED CEILING PLANS PRIOR TO BEGINNING WORK. NOTIFY ARCHITECT OF DISCREPANCIES. INLETS/OUTLETS DUCTS TO AIRCFM OTHER DUCT 901 - 1200 1201 - 1500 1501 - 2000 2001 - 2400 >2401 ‘ ---- ---- ---- 151 - 250 251 - 400 401 - 500 501 - 700 701 - 900 101 - 150 ‘ ‘ ‘ ‘ ‘ ‘ ‘00 - 100 ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ SIZE BASED ON 0.1"/100' P.D. SIZE BASED ON 500 FPM 1.LOAD CALCULATIONS HAVE BEEN PERFORMED IN ACCORDANCE WITH WSEC C403.2.1. 2.EQUIPMENT HAS BEEN SELECTED PER WSEC C403.2.2. 3.VENTILATION AND THE ABILITY TO REDUCE OUTSIDE AIR TO IMC MINIMUMS SHALL BE PROVIDED PER WSEC C403.2.5. 4.MOTORS 1 HP AND LARGER SHALL BE ENERGY EFFICIENT TYPE PER WSEC C403.2.13; MOTORS 1/12 HP TO 1 HP SHALL BE ECM TYPE OR MEET MINIMUM EFFICIENCY REQUIREMENTS PER WSEC C403.2.10.3. 5.HEAT PUMPS SHALL INCLUDE MICROPROCESSOR CONTROLS THAT MINIMIZE SUPPLEMENTAL HEAT USAGE DURING START-UP, SET-UP, AND DEFROST CONDITIONS. THESE CONTROLS SHALL ANTICIPATE THE NEED FOR HEAT AND PROVIDE COMPRESSION HEAT AS THE FIRST STAGE. PROVIDE A VISUAL INDICATION WHEN SUPPLEMENTAL HEAT IS IN USE AND A CONTROL LOCK-OUT OF SUPPLEMENTAL HEAT FOR OUTSIDE AIR TEMPERATURES ABOVE 40 DEG F PER WSEC C403.2.4.1.1. 6.TEMPERATURE CONTROL SYSTEM SHALL HAVE A MINIMUM DEAD BAND OF 5 DEGREES AS REQUIRED BY WSEC C403.2.4.2. 7.HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF PROVIDING NIGHT SETBACK, SEVEN DIFFERENT DAILY SCHEDULES, AND OPTIMUM START PER THE REQUIREMENTS OF WSEC C403.2.4.3. 8.OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SHALL BE PROVIDED WITH DAMPERS THAT COMPLY WITH WSEC C403.2.4.4. DAMPER SHALL AUTOMATICALLY CLOSE WHEN SYSTEM OR SPACES SERVED ARE NOT IN USE OR DURING WARM-UP, COOL-DOWN, AND SETBACK. DAMPER MAXIMUM LEAKAGE RATE SHALL NOT EXCEED MAXIMUM ALLOWED BY WSEC C402.4.5.2. 9.ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED IN ACCORDANCE WITH IMC, WSEC C402 AND IBC REQUIREMENTS PER WSEC C403.2.7. 10.DUCTWORK SHALL BE INSULATED TO THE APPROPRIATE R-VALUE AS REQUIRED BY WSEC C403.2.7. 11.PROVIDE DIFFERENTIAL DRY BULB HIGH LIMIT SHUT-OFF CONTROL OF ECONOMIZER COOLING PER TABLE C403.3.1.1.3(2). 12.ECONOMIZER DAMPERS SHALL BE CAPABLE OF BEING SEQUENCED WITH MECHANICAL COOLING EQUIPMENT. 13.AIR SYSTEMS SHALL BE BALANCED AS REQUIRED IN SECTION C408.2.2.1 AND C408.2.2.2 OF THE WSEC. 14.PROVIDE COMMISSIONING PLAN & REPORT REQUIREMENTS FOR PRELIMINARY AND FINAL COMMISSIONING PER SECTION C408.1. PROVIDE SEQUENCE OF OPERATIONS AND TEST PROCEDURES PER SECTION C408.1.2 AND SUBMIT COMPLIANCE CHECKLIST PER SECTION C408.1.3.4 OF THE WSEC TO THE BUILDING OFFICIAL UPON SUBSTANTIAL COMPLETION. 15.THESE "ENERGY CODE NOTES" ARE LISTED TO SATISFY THE BUILDING DEPARTMENT'S REQUIREMENT THAT CERTAIN INFORMATION BE PLACED ON THE PLANS, BUT DO NOT DIMINISH THE FULL PROJECT REQUIREMENTS. PROVIDE ITEMS IN EXCESS OF CODE WHERE NOTED ON DRAWINGS AND IN SPECIFICATIONS. FOR OTHER ADDED REQUIREMENTS, SEE SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: ITEM SECTION# AS-BUILT DOCUMENTS 20 05 00 O&M MANUALS 20 02 00 DUCT INSULATION 20 07 00 DUCTWORK SEALING & TESTING 23 31 00 CONTROLS 23 09 00 ENERGY CODE NOTES MANUFACTURERMFR SHEET ON WHICH SECTION IS SHOWN SECTION IDENTIFICATION LETTER DETAIL IDENTIFICATION NUMBER SHEET ON WHICH DETAIL IS SHOWN A M3.1 M3.1 2 W/WITH WET BULBWB VOLTS, VOLTAGEV TRANSFER DUCT UNLESS NOTED OTHERWISE TRANSFER GRILLE TYPICAL UNO TD TYP TG TEMP TEMPERATURE ELBOW WITH TURNING VANES WALL OUTLET (OR INLET) T THERMOSTAT SIZE,SYMBOL SIZE,SYMBOL CFM CFM CEILING INLET FLEXIBLE CONNECTION RATED LOAD AMPS REVOLUTIONS PER MINUTE REQUIREDREQ'D RLA RPM PRESSURE DROP PHASE OUTSIDE AIROA PH PD OPPOSED BLADE DAMPER NOT TO SCALENTS OBD THOUSAND BTUH MINIMUM CIRCUIT AMPS MINIMUM MECHANICAL MCA MECH MIN MBH ARROW IN DIRECTION OF FLOW DUCT SECTION (EXHAUST OR RETURN) LINED DUCT (DIM. FOR NET FREE AREA) DUCT (FIRST FIGURE, SIDE SHOWN) 20/12L RISE (R) OR DROP (D) 20/12 HORSE POWERHP EXTERNAL STATIC PRESSURE FEET PER MINUTEFPM ESP ENERGY EFFICIENCY RATIOEER EACH DRY BULB EA DB DEGREE FAHRENHEIT DIAMETER DEG F, F ',$‘ DRAWINGDWG BUILDINGBLDG CUBIC FEET PER MINUTECFM CAPACITYCAP ARCHITECTURALARCH DESCRIPTIONSYMBOL MECHANICAL LEGEND DESCRIPTIONABBREV. NOTE:SEE SYMBOL LIST & SCHEDULES FOR EXPLANATION OF ADDITIONAL SYMBOLS & ITEM CALLOUTS. R(D) COMBINATION FIRE/SMOKE DAMPER general@hultzbhu.com Phone: (253) 383-3257 1111 Fawcett Ave Suite 100 e n g i n e e r s i n c HULTZ Fax: (253) 383-3283 Job Number: Tacoma, WA 98402 BHU 15-190 HOUSE 3 21 16 0 PERMIT SET BHM 111022315 SCALE: VARIES FILE NO: SHEET: REV NODRAWING NO 12345678 A B C D E A B C D E CADD NO: CLASS: DATE (M/D/Y)SUBSTATION ENGINEERING DEPARTMENT$DATE$$USER$CODE: ENGINEER REVIEWED REVISION DESCRIPTION: CAD APPROVED WO NUMBER: OF: CONTROL HOUSE TALBOT SUBSTATION 31TR D-18740BS SIGNED 3/21/2016 3 21 16 M1-1 Mechanical Legend & Notes 23 HEAT PUMP SCHEDULE - PACKAGED TYPE SYMBOL SPECIFIED MANUFACTURER AND SERIES NO. AREA SERVED COOLING CAP *HEATING CAP *SUPPLEMENTARY HEAT INDOOR FAN OUTDOOR FAN COMPRESSOR ELECTRICAL FILTERS MIN. OA CFM MAX WEIGHT LBS REMARKS TOTAL MBH EFFICIENCY MBH EFFICIENCY KW STAGES CFM ESP HP QTY HP (EA)QTY RLA (EA)MCA MOP VOLTS / PH TYPE MIN. SF HP-1 BARD W48H2 CONTROL 100, BATTERY 101 46 9.0 EER 44 3.0 COP 9 1 1550 0.2 1/2 1 1/3 1 13.6 56 60 230/3 2" PTA MERV 8 20"X30"300 550 &22/,1*&$3$&,7<,6$5,5$7,1*$7ƒ)'%ƒ):%,1'225&2,/($7$1'ƒ)287'225&2,/($7 +($7,1*&$3$&,7<,6$5,+,7(035$7,1*$7ƒ)'%,1'225($7$1'ƒ)'%ƒ):%287'225&2,/($7 *** ON PLANS "A" DESIGNATES INDOOR UNIT, "B" DESIGNATES OUTDOOR UNIT. (E.G. HP-1B IS HP-1 OUTDOOR UNIT). FAN SCHEDULE SYMBOL SPECIFIED MANUFACTURER AND SERIES NUMBER TYPE AREA SERVED CFM ESP RPM WHEEL DIA ELECTRICAL DRIVE CONTROL REMARKS HP VOLTS / PH EF-1 COOK TCN-B 100 TUBULAR INLINE CENTRIFUGAL BATTERY 101 250 0.50"1490 -1/4 115/1 BELT TIME SCHEDULE AMCA-A SPARK RESISTANT CONSTRUCTION AIR INLET & OUTLET SCHEDULE SYMBOL TYPE MANUFACTURER AND SERIES NUMBER REMARKS CEG CEILING EXHAUST GRILLE TITUS SERIES 50F 1/2"x1/2"x1/2" CUBE CORE CTG CEILING TRANSFER GRILLE TITUS SERIES 50F 1/2"x1/2"x1/2" CUBE CORE 1.ALL AIR TERMINALS SHALL HAVE FACTORY FINISH, COLOR AS SELECTED BY ARCHITECT. 2.SEE LEGEND FOR TERMINOLOGY USED IN AIR TERMINAL CALL-OUTS ON DRAWINGS. 3.SEE ARCH. FINISH SCHEDULE FOR CEILING TYPES, PROVIDE AIR TERMINALS TO MATCH CEILING CONSTRUCTION INSTALLED IN. 4.SEE SECTION 22 37 00 FOR SPECIFICATIONS. AIR INLET & OUTLET SCHEDULE NOTES: PROVIDE W/ 0 -100% OA DRY BULB ECONOMIZER CONTROL, RETURN GRILLES, R-410A REFRIG & REMOTE 7-DAY PROGRAMMABLE THERMOSTAT. 1 1 general@hultzbhu.com Phone: (253) 383-3257 1111 Fawcett Ave Suite 100 e n g i n e e r s i n c HULTZ Fax: (253) 383-3283 Job Number: Tacoma, WA 98402 BHU 15-190 HOUSE 3 21 16 0 PERMIT SET BHM 111022315 SCALE: VARIES FILE NO: SHEET: REV NODRAWING NO 12345678 A B C D E A B C D E CADD NO: CLASS: DATE (M/D/Y)SUBSTATION ENGINEERING DEPARTMENT$DATE$$USER$CODE: ENGINEER REVIEWED REVISION DESCRIPTION: CAD APPROVED WO NUMBER: OF: CONTROL HOUSE TALBOT SUBSTATION 31TR D-18740BS SIGNED 3/21/2016 3 21 16 M1-2 Mechanical Schedules 24 MOUNTING CLIP FURNISHED W/ UNIT NOTES: SUSPENDED EQUIP. SUPPORT NTS EQUIPMENT 1.ALL SUSPENDED HVAC EQUIPMENT W/ ROTATING COMPONENTS SHALL HAVE VIBRATION ISOLATORS AS SHOWN. 2.VIBRATION ISOLATORS SHALL BE SELECTED FOR 1" DEFLECTION. 3.SEE STRUCTURAL FOR ATTACHMENT TO STRUCTURE & OTHER ANCHORING REQUIREMENTS. M2-1 1 HANGER ROD TO STRUCTURE, SEE STRUCTURAL FOR ATTACHMENT. COMBINATION SPRING & DOUBLE DEFLECTION TYPE VIBRATION ISOLATOR, MASON SERIES DNHS OR APPROVED. TRANSFER DUCT DETAIL M2-1 2 T 21 AA B 2 B 1 HP-1 12x12 CEG EF-1 1 1 M2-1 10/10 10/10L 2 M2-1 12x12 CTG PROVIDE HEIGHT AS NEEDED TO CLEAR ADJACENT ITEMS MIN 6" LINED ELBOW - SAME SIZE AS TRANSFER DUCT TRANSFER GRILLE FINISHED CEILING (TYP) SCREEN 1.CEILING TYPE & AIR INLET FRAME STYLE MAY VARY FROM THAT DEPICTED. 2.SEE PLAN FOR SIZE OF TRANSFER DUCT. 3.PROVIDE FIRE/SMOKE DAMPERS AS SHOWN ON PLANS. NOTES: DUCT SUPPORT 2 16/16 12x8 WSG 250 (TYP)30/10 3 CONTROL 100 BATT. 101 WALL LOUVER SEE ARCH. general@hultzbhu.com Phone: (253) 383-3257 1111 Fawcett Ave Suite 100 e n g i n e e r s i n c HULTZ Fax: (253) 383-3283 Job Number: Tacoma, WA 98402 BHU 15-190 HOUSE 3 21 16 0 PERMIT SET BHM 111022315 SCALE: VARIES FILE NO: SHEET: REV NODRAWING NO 12345678 A B C D E A B C D E CADD NO: CLASS: DATE (M/D/Y)SUBSTATION ENGINEERING DEPARTMENT$DATE$$USER$CODE: ENGINEER REVIEWED REVISION DESCRIPTION: CAD APPROVED WO NUMBER: OF: CONTROL HOUSE TALBOT SUBSTATION 31TR D-18740BS SIGNED 3/21/2016 3 21 16 M2-1 Mechanical Floor Plan FLOOR PLAN - MECHANICAL SCALE: 1/8"=1'-0"NORTHKEYED NOTES: 1 GENERAL NOTES: 1.SEE GENERAL MECHANICAL NOTES ON PREVIOUS SHEET. 2.PROVIDE TRANSITIONS AT DUCT CONNECTIONS TO ALL HVAC EQUIPMENT & AIR INLETS/OUTLETS TO MATCH CONNECTION SIZE. 3.LOCATE FIRE/SMOKE DAMPERS TO BE ACCESSIBLE. 4.PROVIDE DUCT & BLDG ACCESS DOORS AT ALL BDD'S DAMPERS TO ALLOW ACCESS & INSPECTION. 5.BDD'S AT LOUVERS SHALL MATCH LOUVER DIMENSIONS. 6.SEE ARCHITECTURAL PLANS FOR WALL LOUVERS. PLENUMS AT LOUVERS SHALL BE A MINIMUM OF 12" DEEP & SHALL HAVE 2" THICK LINING. INTERLOCK MOTORIZED DAMPER W/ EXHAUST FAN TO BE OPEN WHEN FAN IS ON. LOCATE TO BE ACCESSIBLE FROM CONTROL 100. LOCATE FAN TO BE ACCESSIBLE FOR MAINTENANCE FROM CONTROL 100; COORDINATE WITH CABLE TRAY LAYOUT. PROVIDE DIFFERENTIAL PRESSURE DEVICE WITH CONTACTS THAT CLOSE WHEN FAN IS OPERATING. CONTACTS TO BE USED BY E.C. FOR FAN TROUBLE ALARM THROUGH FIRE ALARM PANEL. COORDINATE WITH E.C. 25 2 3