Loading...
HomeMy WebLinkAboutHEX Presentation Power PointTalbot Hill Substation Improvements (LUA16-000922) DateAngelea Weihs, Associate Planner February 14, 2017 Public Hearing 1 Presentation Outline •Project/Proposal (6 Slides) –Description –Location –Site Characteristics •Process to Date (1 Slide) •RMC Analysis (3 Slides) –Comprehensive Plan Compliance –Zoning Development Standard Compliance –Conditional Use Permit Compliance –Site Plan Review Compliance –Availability and Impact on Public Services •Staff Recommendations (1 Slide) 2 Approximate Location 3 Approximate Location 4 2023059003 2023059066 Site Characteristics 5 Proposal: 6 •Replace the existing 999 SF control house with a new 1,499 SF control house. •Remove and replace existing 230kV substation equipment inside the fence, including steel structures and foundations. •Install a new storm drainage system within the fenced area and a detention pond south of the southerly substation fence. •Interior and exterior driveway improvements Proposal 7 Proposal 8 Process to Date Acceptance Public Comment Environmental ‘SEPA’ Review Public Hearing 9 Analysis 10 Comprehensive Plan Compliance and Consistency •The proposal complies with the City’s Comprehensive Plan goals and policies if all recommended conditions of approval are complied with. Zoning Development Standard Compliance and Consistency •The proposal has demonstrated compliance with the R-8 zoning classification if all recommended conditions of approval are complied with. Analysis 11 Conditional Use Permit Compliance •The proposal complies with RMC 4-9-030D, Conditional Use Permit decision criteria, for development in the R-8 zone if all recommended conditions of approval are complied with. Site Plan Compliance and Consistency •The proposal complies with RMC 4-9-200E, Site Plan Review decision criteria, for development in the R-8 zone if all recommended conditions of approval are complied with. Analysis 12 Availability and Impact on Public Services •Police and Renton Fire Authority staff indicates that sufficient resources exist to furnish services to the proposed development. No fire impact fees are applicable for this project. •No transportation impact fees are applicable for this project. Existing right of way in Puget Drive SE is approximately 100 feet, with no existing frontage improvements. Per RMC 4-6-060, half street frontage improvements, including curb, planter strip, sidewalk, and storm drainage improvements are required. No right of way dedication is required. •No water or sewer service is proposed or required for the redevelopment project. •A preliminary Technical Information Report (TIR) was submitted with the application. Recommendation 13 Staff recommends approval of the Talbot Hill Substation Improvements Conditional Use Permit and Site Plan Review, subject to 4 conditions of approval. 14 Questions?