Loading...
HomeMy WebLinkAboutClose LT1 (DLH 02-24-2015) with EXHIBIT A February 24, 2015 VIA US MAIL AND EMAIL (cclose@rentonwa.gov) City of Renton Department of Community and Economic Development Planning Division 1055 S. Grady Way, Sixth Floor Renton, Washington 98057 Attn: Clark Close, Associate Planner RE: Pending Vuecrest II Preliminary Short Plat (Renton File No. LUA15-000026) Proposed list of special conditions of preliminary short plat approval Dear Mr. Close: In follow-up to the three-way phone call that Kolin Taylor and I had with you late last Tuesday afternoon (February 17), I am writing on behalf of my client KBS III, LLC (“KBS”), the applicant of the pending proposed eight-lot Vuecrest II Preliminary Short Plat, to provide you a proposed list of special conditions of preliminary short plat approval. In addition to addressing sewer service for the short plat development, these proposed conditions have been designed to address the possibilities that, by the time that Vuecrest II is otherwise ready for final short plat approval and recording, (1) The public street planned through the site of the proposed Vue Crest Estates subdivision development (APN 3123059048) might not be completed and dedicated to the City of Renton and/or (2) A joint stormwater detention and water quality facility that KBS and the Vue Crest Estates preliminary plat applicant (Harbour Homes) are planning on the Vue Crest Estates site (to provide stormwater detention and meet water quality requirements for both developments) might not be unavailable. In view of the above, here is the list of special conditions of preliminary short plat approval that KBS proposes: City of Renton Department of Community and Economic Development Planning Division Attn: Clark Close, Senior Planner February 24, 2015 Page 2 (1) Prior to or contemporaneously with final approval and recordation of the short plat, either: (a) Both of the following conditions must be satisfied: (i) An offsite public street must be sufficiently completed and available for public traffic from (A) existing Smithers Avenue South at the north end of the proposed Vue Crest Estates subdivision development site (APN 3123059048) through that site to (B) the west boundary of the Vuecrest II parcel (to connect with proposed Road A of the short plat) and (ii) A public street right-of-way must be dedicated, deeded, or otherwise transferred to the City of Renton for that offsite street; or (b) Both of the following conditions must be satisfied: (i) The west end of the short plat layout must be modified to be generally consistent with the attached 7-Lot Alternative Layout (EXHIBIT A) in order to (A) eliminate proposed Lot 8, (B) have the west end of Road A terminate with a cul-de-sac bulb to the west of proposed Lot 7 (a “Cul-de-Sac Bulb”), (C) somewhat modify the layout of proposed Tract A in relation to the street right-of- way for Road A and the Cul-de-Sac Bulb, and (D) create a new Tract B (a portion of which is to be used for tree preservation purposes and a portion of which is to be used for a part of a drainage facility) and (ii) Road A (including the Cul-de-Sac Bulb) must be substantially completed; (2) Prior to or contemporaneously with final approval and recordation of the short plat, either: (a) A joint stormwater detention and water quality facility must be constructed within the Vue Crest Estates site to provide stormwater