HomeMy WebLinkAboutNOA_Cedar River 205 Dredge and Leves_15-000185 If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 98057. File Name / No.: Cedar River 205 Dredge and Levees / LUA15-000185, SME NAME: MAILING ADDRESS: City/State/Zip: TELEPHONE NO.: NOTICE OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: April 7, 2015 PROJECT NAME/NUMBER: Cedar River 205 Dredge and Levees / LUA15-000185, SME PROJECT DESCRIPTION: The applicant has requested concurrence with a previous issued NEPA and SEPA under file number LUA97-092 and a Shoreline Exemption for the Cedar River maintenance dredging project. The maintenance dredging is required for the existing Lower Cedar River Section 205 Flood Hazard Reduction Project as required per the USACE Project Cooperation Agreement and project operation and maintenance manual in order to maintain the flood protection benefits of the federally constructed flood control project. The maintenance dredge would occur from the mouth of the Cedar River at Lake Washington upstream 1.23 miles to the Williams Ave. Bridge. The project is located in both Reach A and B of Cedar River which is designated Shoreline High Intensity. The maintenance dredges would remove up to four feet of sediment deposition with a 1-foot over dredge allowance at the maximum and is estimated to remove 125,000 cubic years of sediment. An additional 10,840 cubic yards of material would be needed for bank stabilization and 55,000 cubic yards would be needed for temporary construction berms. In addition to the dredging the project also includes maintenance and repair of existing bank stabilization structures and stormwater outfalls, and new stabilization as necessary, to conduct the dredge. Two wetlands would be impacted which are proposed to be mitigated through mitigation bank credits. In addition, compensatory mitigation to offset impacts to fisheries and associated habitat resources, are included in the proposal. Vegetation would be removed where necessary in the river and on river banks, including 6 trees. All temporary construction impacts to riparian vegetation would be replanted upon project completion. PROJECT LOCATION: Cedar River from the mouth of the river to Williams Ave. Bridge. PERMITS/REVIEW REQUESTED: Shoreline Exemption APPLICANT/PROJECT CONTACT PERSON: Hebe Bernardo/City of Renton/1055 S Grady Way Renton, WA 98057 / 425-430 7264 If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager Vanessa Dolbee, Current Planning Manager, at (425) 430-7314. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 98057. File Name / No.: Cedar River 205 Dredge and Levees / LUA15-000185, SME NAME: MAILING ADDRESS: City/State/Zip: TELEPHONE NO.: PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION DATE OF APPLICATION: MARCH 23, 2015 NOTICE OF COMPLETE APPLICATION: APRIL 7, 2015 N