Loading...
HomeMy WebLinkAbout7. ConstructionMitigationDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 Construction Mitigation Description Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 Construction Mitigation Description: Please provide 5 copies of a written narrative addressing each of the following:  Proposed construction dates (begin and end dates) Proposed construction dates are unknown and will be dependent upon permitting restrictions, fish windows, seasonal rain conditions, and habitat restrictions for nearby nesting herons.  Hours and days of operation Construction operations will be generally limited between Monday and Friday during an 8-hour consecutive period between 7:00am and 6:00pm.  Any special hours proposed for construction or hauling (i.e. weekends, late nights) Night, weekend and holiday work will not be permitted.  Proposed hauling/transportation routes Haul and construction site access with be from Monster Road and Naches Avenue, depending on the section of trail to be constructed.  Preliminary traffic control plan Traffic control along Monster Road will generally include single-lane traffic and sidewalk closures using flaggers and standard WSDOT Work Zone Traffic Control plans. Traffic control at Naches Avenue and the trailhead will be limited to parking restrictions; this is a cul-de-sac and serves as parking for infrequent trail users.  Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics Temporary erosion and sediment control measures from the King County Surface Water Design Manual (2009), Appendix D, will be applied during construction to limit dust, erosion, mud, and noise and other noxious characteristics of the construction.