HomeMy WebLinkAbout10. Construction mitigation description Page 1 of 2 April 28, 2015 Scott Rice Collins Woerman 710 Second Avenue Suite 1400 Seattle, WA 98104 Re: Construction Mitigation Description Renton Training Center Expansion 595 Monster Road SW Renton, WA 98055 Dear Scott: Site Plan Review Submittal Requirements Response Item #10: A) Based on current information of permit turn around, client vetting, approval and funding durations, we believe the site work would start at the beginning of May 2016 and complete by the end of July 2016. B) Our work would be conducted during regular daytime hours and weekday operation, We anticipate 7am to 5pm, Monday through Friday and are flexible within that time frame to conform to any typical Renton requirement. C) Our proposed haul route starting from the site would be Monster Road SW, South to Oaksdale Ave SW, East to SW Grady Way, South to Rainier Ave S to I-405. However, we also have the option of heading north on Monster Road SW to 68th Ave S to Martin Luther King Jr Way to I-5 if that is less impactful in the eyes of a reviewer. D) As this site work would take place during late spring and summer, we would anticipate standard wet weather TESC measures for protecting the storm system and at the perimeter site or property lines, as well as dust control measures for the drier times. This project is being performed in an already finished and functional industrial property, as such we have access to dust control water as needed, abundant paved and striped parking areas for the crew, traffic striping and signage and speed bumps. The standard daytime workweek schedule means that we are working in safer daylight visibility hours and during the same time as other normal work activities are taking place at the adjacent industrial properties. Our added work and hauling traffic will be virtually indistinguishable in type and frequency from the tractor trailer merchandise loads coming and going at the nearby distribution center businesses. Page 2 of 2 We feel fortunate to have amenable neighbors to this type of site work project, but we also will institute necessary mitigation measures to reduce our impact to them as well as the adjacent wetlands. Our preliminary on site traffic control plan is attached. Should you have any questions or need further clarification, I can be reached directly at 206- 251-7403 or via email at markm@ferris-turney.com. Mark McGary Project Manager Ferris-Turney General Contractors