Loading...
HomeMy WebLinkAbout30. SPT-C1.0-TESC PLANNOTES: 1.SIZE THE BELOW GRATE INLET DEVICE (BIGD) FOR THE STORM WATER STRUCTURE IT WILL SERVICE. 2.THE BIGD SHALL HAVE A BUILT-IN HIGH-FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 3.THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL. 4.PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3 (15).C:\Users\pwilhelm\Documents\WC Tech\Seattle Pipe Trades\SPT-C1.0-TESC plan.dwg, 4/22/2015 10:04:45 PM, pwilhelm