HomeMy WebLinkAbout30. SPT-C1.0-TESC PLANNOTES:
1.SIZE THE BELOW GRATE INLET DEVICE (BIGD)
FOR THE STORM WATER STRUCTURE IT WILL
SERVICE.
2.THE BIGD SHALL HAVE A BUILT-IN HIGH-FLOW
RELIEF SYSTEM (OVERFLOW BYPASS).
3.THE RETRIEVAL SYSTEM MUST ALLOW
REMOVAL OF THE BIGD WITHOUT SPILLING THE
COLLECTED MATERIAL.
4.PERFORM MAINTENANCE IN ACCORDANCE
WITH STANDARD SPECIFICATION 8-01.3 (15).C:\Users\pwilhelm\Documents\WC Tech\Seattle Pipe Trades\SPT-C1.0-TESC plan.dwg, 4/22/2015 10:04:45 PM, pwilhelm