Loading...
HomeMy WebLinkAboutR-419509L0 a) qqT Ton 1 L LI I- I I I I I I I I I I I \ I \ I \I I \ I \ I I I I I I I I I I I I I I I I I I I I I I O- I I y I 2 -w- DEVELOPMENT ENGINEERING 4 � jchavez 03/17/2022 A PORTION OF THE NORTHEAST 1/4 OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., KING COUNTY, WASHINGTON STATE MATCHLINE ---- GRID 2 ---- SEE SHEET D1.2 . . r. Y I• .. I •4' r 7 t t I _ _ p p d�.� . �. T' : �. . `!r .dam • -- • s ;+ •► i:'• •t y �'•�. may'•. •i.j ••�. '4 _._!:y i\ Z.' •i T� 41 oyo� �t _ . . �• �. �•4' .l`. ••t• rn4Fo •.'y'.• +•tea'=ru• •'.• N A • •• ••• / PO _ �.:i-: -'.-�. .fir- -.T .9r....• v!" • . 00 6" CHN LNK FNCL ..• . :'.`+Tr ci o m W oz i/�j,�ij P I W 2 Z W j LU TL 0889800uu4t; -All N III/ --I m m W I - / PPJ u /V ji i/ n 0 II j ,� j Co r ao r / // / 45 j,// �' I //// II'. y f I o. •. •. �a ��� � .T.' '5b:3� . • s is � � I D T=7 .31' L=145.00' ASPHALT SAW CUT EXISTING R=--- 'n=2o•4s`oo" - TH ST - 0 � _ S84'11'32"E I = STABILIZED CONST. ENTRANCE PAD 165.0= (PER RENTON STD. PLAN-215.10) - N o a 0 A :���Z�►PiI��iII11�1Z�Z�`1l:J��I�1C�1 FOR RECOMMENDED CONSTRUCTION SEQUENCE NOTES SEE SHEET G0.3. SAFETY REQUIREMENTS FOR GENERAL SAFETY REQUIREMENTS NOTES SEE SHEET GO.3 CITY OF RENTON GENERAL DEMOLITION NOTES 1. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK, INCLUDING DEMOLITION AND ANY SEWER CAPPING PERMITS. FIRE PROTECTION DEMOLITION PERMIT IF REQUIRED, IS ISSUED BY DRE DEPARTMENT. SEPARATE PERMITS ARE REQUIRED FOR EACH BUILDING AS WELL AS SEPARATE SEWER CAPPING PERMIT. 2. ASBESTOS ABATEMENT, MUST BE APPROVED BY PUGET SOUND AIR POLLUTION CONTROL AGENCY PRIOR TO DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS FROM THIS AGENCY. CONTRACTOR IS CAUTIONED THAT ASBESTOS CONTAINING MATERIAL AND OTHER REGULATED MATERIALS EXIST. CONTRACTOR SHALL REVIEW THE LEVEL 1 REPORT OR LATEST ADDENDUM THERETO FOR FURTHER DESCRIPTION. CONTRACTOR SHALL OBTAIN APPROVED REPORTS FOR RECOMMENDATIONS AND REQUIREMENTS FOR ADDRESSING THESE ITEMS DURING DEMOLITION ACTIVITY. 3. COORDINATE DEMOLITION AND CONSTRUCTION PHASING WITH PROPERTY OWNER. REFER TO CONSTRUCTION PHASING PIN AGREEMENT BETWEEN OWNER AND DEVELOPER. 4. DISASSEMBLE AND REMOVE INTERIOR OPERATIONAL EQUIPMENT FOR SALVAGE AS DIRECTED BY OWNER. DISMANTLE AND DEMOLISH BUILDING STRUCTURES. DEMOLITION DEBRIS AND MATERIALS TO BE STOCKPILED AND DISPOSED OF AT AN APPROVED SITE. 5. FOUNDATION'S BELOW SLAB AND EXTENDING BELOW GRADE TO BE DEMOLISHED. DEMOLISH ALL WALLS, ETC. TO LEAVE THE AREA FREE FROM ANY PROTRUSIONS (STRUCTURAL OR UTILITY). 6. ANY HAZARDOUS SUBSTANCES AND/OR MATERIALS ENCOUNTERED SHALL BE HANDLED AND DISPOSED OF BY QUALIFIED PERSONNEL ACCORDING TO CITY, STATE AND FEDERAL REGULATIONS. 7. EROSION CONTROL IS REQUIRED TO PREVENT DEBRIS FROM ENTERING STORM SYSTEM. 8. ANY ENCOUNTERED UNDERGROUND TANKS, VAULTS, ETC., SHALL BE REMOVED PER COUNTY/STATE REGULATIONS. CRAWL SPACES, TUNNELS, TANK HOLES, ETC., SHALL BE BACKFILLED AND COMPACTED PER SOILS ENGINEERS RECOMMENDATIONS. 9. DISCONNECT ALL POWER. TELEPHONE, GAS FROM BUILDINGS. CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE OWNER AND ANY APPROPRIATE UTILITY COMPANIES ON REQUESTING DISCONNECTION'S. REMOVALS AND/OR RELOCATION OF EXISTING SERVICE. CONTRACTOR SHALL COORDINATE WITH THE OWNERS ENGINEER, THE OWNER AND APPROPRIATE UTILITY PURVEYORS TO VERIFY SERVICE LOCATIONS TO EXISTING BUILDING. CONTRACTOR IS CAUTIONED THAT SOME PERIMETER POWER AND TELEPHONE UTILITIES OUTSIDE OF THE BUILDING MAY BE REQUIRED TO REMAIN OPERATIONAL UNTIL RELOCATED BY OTHERS (POTELCO, QWEST). THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR ANY DAMAGES AS A RESULT OF A DISRUPTION OF UTILITY SERVICE ASSOCIATED WITH AND/OR DUE TO HIS ACTIVITIES. 10.PLUG AND CAP ALL EX. FIRE SPRINKLER, DOMESTIC WATER LINES, AND STORM DRAINS AT BLDG. CAP ALL UTILITIES TO THE BUILDING, DISCONNECT ELECTRICAL AND REMOVE ANY WATER METERS AND CAP LINES. 11.CONTRACTOR SHALL CONFIRM AND VERIFY WORK SCOPE ITEMS AND BUILDING UTILITY SERVICES TO DEMOLISH WITH THE OWNERS AUTHORIZED REPRESENTATIVE. 12.UNLESS OTHERWISE NOTED, CONTRACTOR SHALL CAP/PLUG ALL UTILITIES AT PROPERTY LINE WHICH ARE TO BE ABANDONED OR REMOVED. 13.CONTRACTOR SHALL CONFIRM DEWATERING AND/OR SHORING REQUIREMENTS WITH GEOTECHNICAL ENGINEER AND OWNER FOLLOWING DEMOLITION WORK. 14.CONTRACTOR SHALL PREPARE AND PROCESS APPROVED TRAFFIC CONTROL PLAN(S) FOR ALL WORK WITHIN PUBLIC RIGHT OF WAYS PRIOR TO CONSTRUCTION. 15.CONTRACTOR SHALL EMPLOY REASONABLE PRECAUTIONS TO MINIMIZE EMISSIONS OF FUGITIVE DUST DURING DEMOLITION AND DURING LOADING OF DEMOLITION DEBRIS ON TO TRANSPORT VEHICLES. 16.IN THE EVENT OF HIGH WINDS, CONTRACTOR SHALL TEMPORARILY CURTAIL DUST -PRODUCING DEMOLITION ACTIVITIES SO AS TO PREVENT VISIBLE MIGRATION OF DUST OFF -SITE (REF: PSCAA REG I, SECT. 9.15. (A)(1)). TREE PRESERVATION NOTES (TYP) e 1. TREE PROTECTION FENCES ARE TO BE ERECTED PRIOR TO BEGINNING OF WORK TO PROTECT TREES THAT ARE TO BE PRESERVED. FENCES DEFINE SPECIFIC PROTECTION ZONE FOR GROUPS OF TREES. FENCES ARE TO REMAIN UNTIL ALL SITE WORK HAS BEEN COMPLETED. 2. CONSTRUCTION TRAILERS, TRAFFIC, AND STORAGE AREAS MUST REMAIN WITHIN WORK AREA AND OUTSIDE OF TREE PROTECTION FENCING AT ALL TIMES. 3. ALL UNDERGROUND UTILITIES, DRAINLINES OR IRRIGATION LINES SHALL BE ROUTED OUTSIDE THE TREE PROTECTION ZONES. 4. NO MATERIALS, EQUIPMENT, SPOILS, WASTE, OR WASHOUT WATER MAY BE DEPOSITED, STORED OR PARKED WITHIN THE TREE PROTECTION ZONE FENCING. 5. ADDITIONAL TREE PRUNING MAY BE REQUIRED FOR CLEARANCE DURING CONSTRUCTION. ALL TREE PRUNING MUST BE COORDINATED WITH OWNER'S REP. 6. NO HERBICIDES OR PESTICIDES SHALL BE USED IN THIS CONSTRUCTION PROJECT EXCEPT IF APPROVED IN WRITING BY THE OWNER'S PROJECT MANAGER. 7. IF INJURY SHOULD OCCUR TO ANY TREE DURING CONSTRUCTION, IT SHALL BE EVALUATED AS SOON AS POSSIBLE BY THE CITY OF RENTON URBAN FORESTER TO DETERMINE APPROPRIATE ACTION, IF ANY. 8. ANY GRADING, TRENCHING, CONSTRUCTION, DEMOLITION, OR OTHER WORK THAT IS EXPECTED TO ENCOUNTER TREE ROOTS MUST BE MONITORED. WHEN ROOTS ARE ENCOUNTERED 1" IN DIAMETER OR GREATER, THEY SHALL BE CLEANLY CUT WITH A SHARP PRUNING TOOL. 9. ANY ROOTS DAMAGED DURING EXCAVATION, GRADING OR CONSTRUCTION SHALL BE EXPOSED BACK TO SOUND TISSUE BY HAND DIGGING, AND CUT CLEANLY WITH A SHARP PRUNING TOOL. 10.MAINTAIN FIRE -SAFE AREAS AROUND TREE PROTECTION ZONES. NO HEAT SOURCES, FLAMES, IGNITION SOURCES OR HEATED LIQUIDS SHALL BE ALLOWED IN TREE PROTECTION ZONES. 11.THE INTENDED PLACEMENT OF THE TREE PROTECTION FENCING IS TO BE OUTSIDE THE DRIPLINE OF THE TREE. IN SOME INSTANCES THAT IS NOT POSSIBLE WITH THE REQUIRED CONSTRUCTION. IN THESE INSTANCES THE FENCE IS TO BE PLACED AS FAR AWAY FROM THE TREE TRUNK AS POSSIBLE WHILE STILL ALLOWING ROOM FOR THE REQUIRED CONSTRUCTION. IMPORTANT SITE WORK NOTES: • PRIOR TO BIDDING, CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE DEMOLITION WORK NECESSARY TO ACCOMMODATE NEW CONSTRUCTION UNDER THIS CONTRACT AS SHOWN AND SPECIFIED ON THESE PLANS. • REMOVE ALL EXISTING ITEMS NECESSARY FOR NEW CONSTRUCTION. SOME, NOT NECESSARILY ALL ITEMS ARE LISTED ON THESE DEMOLITION & T.E.S.C. PLANS FOR FOR BIDDER/CONTRACTOR CONVENIENCE. • CONTRACTOR SHALL PROVIDE THE INSPECTION AND REPORTING BY A CERTIFIED EROSION AND SEDIMENTATION CONTROL LEAD (CESCL) AS REQUIRED BY THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (WSDOE). • CONTRACTOR IS RESPONSIBLE FOR HIS/HER OWN EARTHWORK TAKEOFF. DEMOLITION. CLEARING. & T.E.S.C. LEGEND * SEE CITY OF RENTON STANDARD NOTES AND DETAILS ON SHEET D2.1 UNLESS NOTED OTHERWISE BELOW. 1 - APPROXIMATE PROJECT LIMITS X 6' HIGH TEMPORARY CHAIN LINK CONSTRUCTION/TREE 1 PROTECTION FENCE WITH CONCRETE SHOES D2•�1 -* * TEMPORARY EROSION CONTROL SILT FENCE OR STRAW WATTLES AS APPROPRIATE TEMPORARY MH/CB SEDIMENT BARRIER ASPHALT PAVING AT PARKING LOT TO BE MILLED 1Y2"-2" DEPTH AS REQUIRED TO OVERLAY WITH NEW PAVING TO E" -` - -" L/`� PROPOSED GRADES AS DETAILED, SAWCUT EDGE AS REQ'D (NOTE: PROTECT EXISTING PAVING THAT IS TO REMAIN) ASPHALT PAVING TO BE REMOVED, SAWCUT EDGE AS REQ'D L< � � � � ��\� (NOTE: PROTECT EXISTING PAVING THAT IS TO REMAIN) 17•7; f-,'T.7.1 CONCRETE PAVING TO BE REMOVED, SAWCUT EDGE AS REQ'D J (NOTE: PROTECT EXISTING CURB/PAVING THAT IS TO REMAIN) CLEAR & GRUB 6" DEPTH AT PROPOSED GRADED AREAS - REMOVE ALL EXISTING STRUCTURES OR OTHER ITEMS AS REQUIRED FOR NEW CONSTRUCTION (PROTECT EXISTING ITEMS NOTED TO REMAIN) C}+ EXISTING TREES TO REMAIN (PROTECT TREES WITHIN PROJECT 'R LIMITS FROM DAMAGE DURING CONSTRUCTION WITH FENCE) Qi REMOVE EXISTING BOLLARDS AND WOOD BARRIER FENCE O2 REMOVE EXISTING CHAINLINK FENCE FABRIC AND RAILS IMMEDIATELY PRIOR TO REPLACING WITH NEW MATERIALS (THE EXISTING FENCE ALSO SERVES AS THE TEMPORARY CONSTRUCTION FENCE) Q3 REMOVE ALL EXISTING CATCH BASIN AND STORM DRAINAGE LINES WITHIN THE CONSTRUCTION AREA, CAP ALL LINES ABANDONED IN PLACE AND NOT REMOVED AND NOTE THE PRECISE LOCATIONS ON THE RECORD DRAWINGS IRRIGATION DEMOLITION NOTES: REMOVE ALL EXISTING IRRIGATION HEADS WITHIN THE IMPROVED AREA. CUT, CAP AND ABANDON IN PLACE OR REMOVE EXISTING IRRIGATION LINES ENCOUNTERED AS REQUIRED FOR NEW CONSTRUCTION (SEE IRRIGATION PLANS FOR NEW IRRIGATION) CAP ALL EXPOSED ENDS ELECTRICAL DEMOLITION NOTES: E1 REMOVE EXISTING LIGHT POLES AND JBOXES, CUT, CAP AND ABANDON IN PLACE OR REMOVE EXISTING ELECTRICAL CONDUIT LINES ENCOUNTERED AS REQUIRED FOR NEW CONSTRUCTION (SEE ELECTRICAL PLANS FOR ADDITIONAL INFORMATION). PROTECTION NOTES: A PROTECT EXISTING UNDERGROUND GAS LINE TO REMAIN B PROTECT EXISTING OVERHEAD POWER LINES AND TOWER TO REMAIN C PROTECT EXISTING BUS STOP SIGN D PROTECT EXISTING GAS LINE SIGNS EO PROTECT ENTIRE WEST SIDE PLANTINGS TO REMAIN (NOTE: SEE IRRIGATION DRAWING SHEETS L1.1 & L1.2 FOR NEW MAINLINE AND CONTROL WIRES TO SERVE THE WEST SIDE PLANTINGS) © PROTECT EXISTING FENCE AND/OR WALL TO REMAIN CLEARING & T.E.S.C. NOTES: 1. STRIP TO DEPTH SHOWN ON LEGEND WHERE STRIPPING IS REQUIRED, REMOVE ALL PAVING, STRUCTURES, ETC. AS REQUIRED FOR NEW CONSTRUCTION. 2. CONTRACTOR SHALL ESTABLISH, MAINTAIN, ADJUST, AND REMOVE TEMPORARY EROSION CONTROL MEASURES (SILT FENCING, ETC.) AS REQUIRED FOR NEW CONSTRUCTION. 3. 'RECYCLED TOPSOIL' - ALL STRIPPINGS MAY BE USED TO CONSTRUCT LANDSCAPE BERMS. 4. CONTRACTOR SHALL VERIFY EXISTING UTILITY LOCATIONS PRIOR TO DEMOLITION AND CLEARING. CONTACT 'CALL BEFORE YOU DIG' AT (800) 424-5555 FOR FIELD LOCATION ASSISTANCE WITHIN THE PUBLIC RIGHT-OF-WAY. RETAIN A PRIVATE LOCATOR SERVICE TO LOCATE UTILITIES WITHIN THE PROJECT SITE. 5. TEMPORARY SEDIMENT BARRIERS SHALL BE INSTALLED ON ALL EXISTING MH'S & CB'S AND ON PROPOSED MH'S & CB'S AS THEY ARE CONSTRUCTED. CONTRACTOR SHALL ADJUST THE FENCE AND MAINTAIN THE SEDIMENT BARRIERS DURING CONSTRUCTION TO PREVENT SEDIMENT LADEN WATER FROM LEAVING THE SITE. 6. REMOVE EXISTING IRRIGATION HEADS AND ELECTRIC CONTROL VALVES WITHIN THE LIMIT OF WORK AS SHOWN. CONTROL VALVES ARE UNDERGROUND (VERIFY LOCATIONS WITH PARKS IRRIGATION SUPERVISOR). REMOVE ALL EXISTING IRRIGATION LINES EXPOSED BY CONSTRUCTION. CUT AND CAP LATERAL LINES. ALL CONTROL VALVES AND IRRIGATION HEADS REMOVED FROM SERVICE DURING DEMOLITION PHASE SHALL BE DELIVERED TO RENTON PARKS DEPARTMENT. 7. AT ALL CLEAR & GRUB AREAS, REMOVE ALL EXIST. STRUCTURES OR OTHER ITEMS AS REQUIRED FOR NEW CONSTRUCTION AND PROTECT EXISTING ITEMS NOTED TO REMAIN. PROTECT AND USE HAND METHODS WHEN WORKING WITHIN DRIPLINE OF EXISTING TREES 8. SEE SHEET D2.1 FOR TEMPORARY EROSION AND SEDIMENT CONTROL DETAILS, NOTES, CONSTRUCTION SEQUENCE NOTES, AND EROSION CONTROL SEEDING NOTES. UTILITY NOTE 1. CONTRACTOR SHALL VERIFY EXISTING UTILITY LOCATIONS PRIOR TO DEMOLITION AND CLEARING. CONTACT 'CALL BEFORE YOU DIG' AT (800) 424-5555 FOR FIELD LOCATION ASSISTANCE WITHIN THE PUBLIC RIGHT-OF-WAY, RETAIN A PRIVATE LOCATOR SERVICE TO LOCATE UTILITIES WITHIN THE PROJECT SITE. 2. SEE SHEET D2.1 FOR CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARD PLAN NOTES. CONTRACTOR STAGING THE PARKING LOT SHALL BE THE CONTRACTOR STAGING AREA 0 10 20 40 GRAPHIC SCALE KEY PLAN 0 1/16 1/8 GRAPHIC SCALE (MILES) a7 m N N a WN 0 N � U D N w � a� U � N U U O I r^ 4 C. C vE m U J m c p CZ) C N r� 3 J (!J N3 N Q m N o o L`•I Z Y W U Q m o co a N bi 00 o 0 w (N z t„ o a. Z N W O Cn w >o w W a r 0 O Q 4..) 4,0 a� v Uj W � O ca 0 Z . �..� 19 O ~ C� J .,� O D1.1 R-419509 Sheet 9 of 40 PERMIT SET Copyright©2021 - Bruce Dees & Associates (All Rights Reserved) CADD filename: R: \DRAWINGS\17501 - RENTON KIWANIS PARK IMPROVEMENTS\10 - REV PERMIT SET\17501-D1.1-D1.3.DWG // Plotted: 1.18.22-12:42 By:(sjensen) BID #: