Loading...
HomeMy WebLinkAboutR-419533u , r O W w U..I 3, m N CV 0 CV CV QL U) MATCHLINE ---- GRID 2 ---- SEE SHEET El.2 6' CHN LNK FNC -V—v o—o—o o—o o— _ 2"C — (2)#6, (16)#8, (1)#6 GND ti (2)2„C 2"C — (4)#10, 2"C r (2)#8, 4"C — (4) 2"C — FUTURE CAMERA .!�/.�•/ n4 / A PORTION OF THE NORTHEAST 1/4 OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., KIN ~~ \� o R -6 a 3 N 3 I I I II U) 3 6' CHN LNK FNC CONC WALL s sit Ss _ W —0 o o=o o—o-- - - ss- s� �' J J I , UP ; '� rr-1 I I 3 0 BOOSTER PUMP 2"C — (2)#8' (1)18_QND I I I (2)#10, (1)#10 GND 3 ;—t—I o \ 2"C — (4)#10, (1)#10 GND \ 1 no no i - FUTURE CA RA \ \ \ \ 6 TYP I I I \ \ E2.0 2"C — (2/ #1 1)#10 2"C — (2)#10, (1) 10 GND I I 1 i t I i I 3 I I I I �� Ivi)I " (2),#10, ( #10 G I I 1 N I I � I lyl I 3 I I I I N I I \ ' I I I I / I (2)4"C — FUTURE I PSE POWER I I I I I (2)4"C — FU E Comm, I I 3 � I I I I I , I " , I I I I 3 I l l I 3 Ef I I I 2»C — (2)#8, (6)#10, (1 D 0� 2 C —SPARE J' �, L I I I I i LU 1_ I I 3 1 LUW Ilow ' 11 I I W —o = 6" CHN LNK FNC Mr—-0 W co —O = � — — _o W I SHED JW lo _U LV Q' 5 1 G TL 0923, ELECTRICAL SITE PLAN - GRID'3' 0 10 20 40 60 TL 0923059235 SCALE: AS INDICATED a D 1 inch7plotted����Ftt If measurement is other than 1 inch then the plot is reduced. 3 3 I IIII I OF N 3 OII N W14 3 IN4 d J. � y 0 o I 3 N p III N 3 WWI I I I 3 al CA 3 I _j� N i 0 ss _'_j_j LINTY, WASHINGTON STATE ss ss ss ss F NN N 19,11-3" J =RP 3 � U taJ1 I / a 3 J 1 as o � I J Yin 8" RP=7 con BP I I I J J 6" RP-6.5 a � 3 c Of IM'A IM - 3116�1 N w �N 1 J J i�_6" RP-6.5 3 III En WWW 3 I I I I y I N � 3 I �8" RP-10 6 " 3 � �RP-10 _j _j I 3 OiIII woo 3 III m�� a��J� 0 I� I 1 Ifl 7" �RP-8 J J J 3 IIII aJ J oW W IIII 3 7" I GENERAL NOTES: 1. JUNCTION BOX LOCATIONS AND CONDUIT ROUTING ARE SCHEMATIC. ALIGN JUNCTION BOXES WITH PAVEMENT EDGES. CONDUIT ROUTING SHALL AVOID TREES. SUBMIT CONDUIT AND JUNCTION BOX LAYOUT PLAN TO ENGINEER PRIOR TO INSTALLATION. 2. MAINTAIN AND PROTECT ALL EXISTING UNDERGROUND UTILITIES. CONTRACTOR TO LOCATE PRIOR TO ANY EXCAVATION. PRIOR TO STARTING CONSTRUCTION, CONTRACTOR SHALL CALL 811 LOCATES FOR UTILITY LOCATIONS. 3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED WITH NYLON PULL STRINGS. 4. ALL JUNCTION BOXES AND CONDUITS ARE SHOWN IN APPROXIMATE LOCATIONS. VERIFY LOCATION OF PROPERTY LINE, EASEMENTS AND UTILITIES PRIOR TO PLACEMENT. 5. CAP ALL UNUSED CONDUITS. WHERE CONDUITS ARE CAPPED MARK LOCATION WITH AN ELECTRICAL MARKER. 6. FIELD BENDING OF STRAIGHT CONDUIT SECTIONS INTO LONG RADIUS SWEEPS IS PREFERRED. 7. GROUND ALL IN —GROUND JUNCTION BOXES, HAND HOLES, AND PULL BOXES PER MOST CURRENT VERSION OF THE NEC. FLAG NOTES: ROUTE RIGID STEEL CONDUIT STRAIGHT UP THROUGH FOUNDATION TIGHT TO SUPPORT COLUMN (NO BENDS). SURFACE MOUNT RECEPTACLE IN CAST ALUMINUM FS BOX 18 INCHES ABOVE GRADE. COORDINATE RECEPTACLE CUTOUT WITH BUILDING MANUFACTURER. RECEPTACLE LOCATED IN NEMA 3R ENCLOSURE THAT INCLUDES CIRCUIT BREAKERS. REFER TO SHEET E2.0 FOR FURTHER INFORMATION. BURY CONDUIT 36" DEEP WITH 24" SEPARATION BETWEEN CONDUITS. COORDINATE WITH OWNER FOR APPROVAL OF CONDUIT AND BOXES PRIOR TO CONSTRUCTION. ® INTERCEPT EXISTING PSE SECONDARY HANDHOLE. PROVIDE SECONDARY CONDUIT AND CONDUCTORS TO NEW PEDESTAL PER PSE REQUIREMENTS. LEGEND: PATHWAY LIGHT AND POLE �-❑ PARKING LOT LIGHT AND POLE O� SIGN ACCENT LIGHT �g2 JUNCTION BOX, WSDOT TYPE II WITH NON—SKID COVER @aG DUPLEX RECEPTACLE, GFCI WITH WEATHERPROOF COVER, 120 VOLT, 20 AMP WP L :� J FUTURE CAMERA KEY PLAN. 0 1/16 1/8 GRAPHIC SCALE (MILES) 11'R (NOT FOR CONST.) 100% CD REVIEW CcVflNht@2020 — Bruce Dees do Associates (NI fthis Reserved) BID #: mm LJ l C: c 1E N N W�) O � @ � - � w w o 4 •LL ao c LLJ U � UY° U-) �W(�a° N C z ma � L LJ U-) a M J W C wa 3 011111 � � M Q � O � O bn Z a. ~ � W Cn o J nn� N V � J W El m3 R-419533 Sheet xx of 39