HomeMy WebLinkAbout(5 copies) Construction Mitigation PlanConstruction Mitigation Description Selland/Thorp Pier Construction Dates : The date of construction will depend on when the necessary government approvals for the lift are issued. Construction of the pier and the installation of the boat lifts will only take approximately two weeks to complete. The in water work window at the site is open from July 16th through December 31st. The work will be completed during the work window opening in either late 2015 or July 2016. Hours and Days of Operation: The work will take place during the City of Renton’s typical hours of construction which are 7:00 am through 10:00 pm Monday through Friday and 9:00 am through 10:00 pm Saturday and Sunday. Proposed Hauling/Transportation Routes: The materials will be brought to the site by a barge by way of Lake Washington. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: Work will take place only during allowed hours of operation. Erosion will not be caused by the project. There will be elevated levels of noise from construction during the installation of the piles. Special Hours Proposed for Construction: No special hours are proposed for construction. Preliminary Traffic Control Plan: Traffic control is not necessary for the project.