HomeMy WebLinkAboutERC Signature Sheet DNSM_Selland Joint Use Dock_15-000489ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE
- MITIGATED (DNS-M)
PROJECT NUMBER: LUA15-000489, ECF, SM
APPLICANT: Mark Selland
PROJECT NAME: Selland Joint Use Dock
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and approval of a Shoreline Substantial Development Permit for the construction of an 80-foot long joint
use pier and two free-standing boat lifts in association with two single-family homes on the shore of Lake Washington, a Shoreline of Statewide Significance. The proposed project site
encompasses two lots (5,634 and 5,571 square feet) with a total area of 11,205 square feet in the R-10 zone. Construction materials would be transported to the site by barge. Eight
steel piles are proposed to be installed by a barge-mounted vibratory pile driver. The pier would have fully grated thruflow decking, four dock lights connected to 4017 Williams Ave
N, and a dock ladder at the waterward end. The shoreline is armored with a concrete and steel bulkhead. The landward section of the pier would be supported by the existing bulkhead.
Thirty-one native shrubs would be planted along the shoreline. An existing shared concrete stair walkway would provide access through the vegetation buffer along the shoreline. Twenty
native shrubs will be added along the bulkhead shoreline in addition to four trees as mitigation. The applicant submitted a Biological Evaluation/Lake and Stream Study Report and Addendum.
PROJECT LOCATION: 4017 & 4023 Williams Ave N
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS)
is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal
Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. Because other agencies of jurisdiction may be involved, the
lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on January 4, 2015. Appeals must be filed in writing together with the required fee with:
Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and more information may be obtained from the Renton City
Clerk’s Office, (425) 430-6510.
PUBLICATION DATE: December 18, 2015
DATE OF DECISION: DECEMBER 14, 2015
SIGNATURES:
Gregg Zimmerman, Administrator
Public Works Department
Date
Mark Peterson, Administrator
Fire & Emergency Services
Date
Terry Higashiyama, Administrator
Community Services Department
Date
C.E. “Chip” Vincent, Administrator
Department of Community & Economic Development
Date