HomeMy WebLinkAboutConstruction Mitigation Description425.455.29
14725 Sou
CO
Quadran
before p
and 34. A
will have
inserts w
storm sys
Jericho A
Further i
Analysis
Proposed
Construc
through t
are on th
Impact to
through c
occur con
Tempora
of high‐v
between
and seed
of the pr
900
utheast 36th St
ONSTR
t Homes is p
lat recording
All homesite
e a rock cons
will be in plac
stem. Prima
Avenue SE (c
nformation
(TIA) prepar
d constructio
ction will be
the plat aro
he same side
o the stream
careful plan
ncurrently w
ary erosion a
visibility fenc
n the graded
ding of distur
oject.
treet, Suite 20
UCTIO
T
proposing th
g. The mode
es will access
struction ent
ce during con
ary access to
ollector arte
regarding ac
red by The T
on dates are
scheduled fo
und the stre
e of the stree
m is being ful
ning efforts
with the deve
and sedimen
cing (HVF) in
areas and b
rbed soils. T
0, Bellevue WA
ON MIT
Tempora
July
he constructi
els are propo
s off of the n
trance and s
nstruction to
o the site is f
erial), and w
ccess and tra
ranspo Grou
e estimated t
or Monday t
eet loop in a
et in the cen
lly avoided a
and project
elopment of
nt control (TE
stalled arou
buffer, plasti
These TESC m
A 98006
TIGAT
ary Use P
y 10, 2015
ion of 5 mod
osed for futu
new public r
ilt fence ere
o prevent co
from NE 4th S
est on SE 2n
affic is addre
up and subm
to be Augus
through Satu
counter cloc
nter of the lo
and impacts
design. Enh
f the plat an
ESC) measur
nd native ve
c sheeting o
measures wi
TION D
Permit
5
del homes o
ure homesit
road: Graha
ected during
onstruction d
Street (princ
d Place (resi
esses in the
mitted with t
t 2015 throu
urday, 7 am
ckwise direc
oop.
to the buffe
hancement a
d constructi
res have bee
egetation wi
or hay blanke
ill be actively
DESCRI
n the Coppe
e numbers:
m Ave SE. E
constructio
debris conta
cipal arterial
dential acce
Transportat
he plat appl
ugh January
to 5 pm. Tr
ction. All pro
er are being
and restorat
on of the m
en implemen
thin the buf
ets on stockp
y managed f
quadranthome
PTION
erwood plat
29, 30, 32,
Each homesi
n. Storm dr
amination of
), south on
ess street).
ion Impact
ication.
2016.
raffic will flow
oposed mod
minimized
tion actions
odel homes
nted that co
ffer, silt fenc
piled materi
for the durat
es.com
N
33
te
rains
f the
w
dels
will
.
nsist
cing
ials
tion
425.455.29
14725 Sou
A concre
commen
staging a
spills and
debris wi
remainin
site will b
will be re
as design
The mod
will acces
construct
place dur
site is fro
west on S
is addres
submitte
900
utheast 36th St
te wash wat
cement of c
and material
d/or hazardo
ill be effectiv
ng wetland a
be cleaned a
emoved. In a
ned by the p
els are prop
ss off of the
tion entranc
ring constru
om NE 4th Str
SE 2nd Place
sses in the Tr
ed with the p
treet, Suite 20
ter collection
construction
s stockpiles
ous material
vely manage
nd stream b
and detail gr
addition, pe
roject engin
posed for fut
new public
ce and silt fe
ction to prev
reet (princip
(residential
ransportatio
plat applicat
0, Bellevue WA
n basin will b
activities re
will be kept
s. Construct
ed and stock
buffer area.
aded using h
rmanent sto
neer.
ture homesit
road: Graha
ence erected
vent constru
pal arterial),
access stree
on Impact An
ion.
A 98006
be installed
equiring add
out of the b
tion materia
kpiled on pav
Following co
hand tools w
ormwater tre
te numbers:
am Ave SE.
d during cons
uction debris
south on Jer
et). Further
nalysis (TIA)
away from t
itional concr
buffer and th
als along wit
ved surfaces
ompletion o
wherever ne
eatment fea
29, 30, 32,
Each homes
struction. St
s contamina
richo Avenu
information
prepared by
the buffer pr
rete work. A
he area will b
h all constru
s and kept fr
of the reside
cessary and
atures will be
33 and 34.
site will have
torm drains
ation. Prima
e SE (collect
n regarding a
y The Transp
quadranthome
rior to
All Equipmen
be kept free
uction waste
ree of the
nce, the ent
TESC measu
e implement
All homesit
e a rock
inserts will
ry access to
tor arterial),
access and t
po Group an
es.com
nt
e of
e and
tire
ures
ted
es
be in
the
and
raffic
d