HomeMy WebLinkAbout01-SCL Creston-Talbot_Cover Letter 1 September 28, 2015 Kris Sorensen Planning Division City of Renton 1055 South Grady Way Renton, WA 98057 SCL Overhead Creston-Talbot Fiber Project Variance from Undergrounding Utility Line Submittal Dear Mr. Sorensen, Seattle City Light (SCL) is proposing to install a 5-mile installation of new overhead all-dielectric self-supporting (ADSS) fiber optic cable between Creston Nelson and Talbot Hill substations near Renton, Washington. Approximately 2.5 miles of the new line are within the City of Renton. The proposed ADSS cable would be installed on existing transmission power line structures within the existing transmission corridor between the two substations. This new ADSS cable would provide a vital data communication link for SCL’s current and future needs, along with the needs of neighboring utilities. HDR Engineering, Inc. (HDR) is providing engineering and permitting services to SCL for this project. HDR staff attended a Pre-Application Meeting (PRE15-000517) with the City of Renton on July 23, 2015. The following materials are included in this request for a Variance from undergrounding utility lines for the SCL Overhead Creston-Talbot Fiber Project:  Pre-Application Meeting Summary (5 copies)  Land Use Permit Master Application Form (1 original and 12 copies)  Variance Application Form (5 copies)  Application Fee of $1,236.00 (via check)  Project Narrative and Variance Request Justification (combined; 12 copies)  Construction Mitigation Description (5 copies)  Legal Description, List of Parcels, and Map of Parcels (3 copies)  Site Plan Package – 11x17 (12 copies)  Plan Reductions – 8.5x11 (1 copy)  Electronic Copy of All Submittal Items (1 disc) If you need additional information or have any questions on this request, please contact Marissa Gifford via email at marissa.gifford@hdrinc.com, or via phone at (425) 450-7112. Sincerely, Dirk Frailey HDR Project Manager