HomeMy WebLinkAboutNOA DNSM_Mission Healthcare_15-000736
If you would like to be made a party of record to receive further information on this proposed project, complete this
form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: Mission Healthcare at Renton /LUA15-000736, ECF, SA-H, CU-A
NAME:
MAILING ADDRESS: City/State/Zip:
TELEPHONE NO.:
NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE-MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: October 15, 2015
LAND USE NUMBER: LUA15-000736, ECF, SA-H, CU-A
PROJECT NAME: Mission Healthcare at Renton
PROJECT DESCRIPTION: The applicant is requesting Hearing Examiner Site Plan Review, Conditional
Use Permit, and Environmental (SEPA) Review for the construction of a new 55,400 square foot, three-story,
convalescent center containing 60 beds to be used for short term rehabilitation services. The subject property is
located on the southeast corner of SE 174th St and 106th Place SE. The project work area totals 1.76 acres feet and is
zoned Commercial Arterial (CA). The site currently contains an espresso stand which is proposed for removal. Access
is proposed via 106th Pl SE with an additional connection to the neighboring commercial property to the east. The
proposal includes 56 surface parking stalls to the south and east of the building. The proposed development is within
50 feet of a coal mine hazard. The applicant has submitted a Drainage Report, Traffic Impact Analysis, Parking
Analysis, Geotechnical Engineering study, and Coal Mine Hazard Report with the subject application.
PROJECT LOCATION: 10635 SE 174th St
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a
DNS-M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance-Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the
proposal. A 14-day appeal period will follow the issuance of the DNS-M.
PERMIT APPLICATION DATE: October 7, 2015
NOTICE OF COMPLETE APPLICATION: October 15, 2015
APPLICANT/PROJECT CONTACT PERSON: George Stephan/Careage Inc./4411 Point Fosdick Dr., 203/Gig Harbor,
WA 98335/ 253-853-4457/ gstephan@careage.com
Permits/Review Requested: Environmental (SEPA) Review, Hearing Examiner Site Plan Review, and
Conditional Use Permit
Other Permits which may be required: Building Permit, Construction Permit, Fire Permit, Sign Permit
Requested Studies: Coal Mine Hazard Assessment, Drainage Report, Geotechnical Report,
Traffic Impact Statement
Location where application may
be reviewed: Department of Community & Economic Development (CED) – Planning
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98057
PUBLIC HEARING: Public hearing is tentatively scheduled for December 8, 2015 before the Renton
Hearing Examiner in Renton Council Chambers at 11:00 am on the 7th floor of
Renton City Hall located at 1055 South Grady Way.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated COMP-CMU on the City of Renton Comprehensive
Land Use Map and CA on the City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project: Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-120A and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed
project. These recommended Mitigation Measures address project impacts not
covered by existing codes and regulations as cited above.
The applicant would be required to comply with those recommendations included in the provided
Geotechnical Report.
Comments on the above application must be submitted in writing to Rocale Timmons, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on October 29, 2015. This matter is also tentatively
scheduled for a public hearing on December 8, 2015, at 11:00 am, Council Chambers, Seventh Floor, Renton City Hall,
1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Planning Division to
ensure that the hearing has not been rescheduled at (425) 430-6578. Following the issuance of the SEPA Determination,
you may still appear at the hearing and present your comments regarding the proposal before the Hearing Examiner. If
you have questions about this proposal, or wish to be made a party of record and receive additional information by mail,
please contact the project manager. Anyone who submits written comments will automatically become a party of
record and will be notified of any decision on this project.
CONTACT PERSON: Rocale Timmons, Senior Planner; Tel: (425) 430-7219; Eml:
rtimmons@rentonwa.gov
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION